Laserfiche WebLink
0ZSID <br />_. . <br />..ems. �_ �._ �——'-��,•-� .. .. / <br />i <br />__ I <br />0' S, FROM PROPERTY <br />{ SHED <br />p}•��,• <br />1 FLOW ' <br />ARROW EX. SHED T SILK <br />I `f PER <br />(rYP°) <br />COE STD. <br />DET.. 214 <br />t <br />2 <br />APPLICATION DATES AND QUALITY STANDARDS FOR MULCH MATERIALS 71 <br />S QUALITY PRODUCTS APPLICATION DATES <br />MULCH MATERIALS <br />STRAW <br />AIR® -.DRIED, FREE FROM UNDESIRABLE. <br />2"-3'' THICK, <br />SEED AND COARSE MATERIAL <br />5 BALES PER 1000 SF <br />OR 2-3 TONS PER ACRE <br />WOOD FIBER CELLULOSE <br />NO GROWTH INHIBITING FACTORS <br />APPROX. 35 -45 LBS <br />PER 1000 SF, OR <br />1500 2000 LDS PER ACRE <br />COMPOST <br />- <br />NO VISIBLE WATER OR. DUST DURING <br />2" THICK, MIN., (APPROX. 100 <br />HANDLING. MUST BE PURCHASED <br />TONS PER ACRE APPROX. 750 <br />FROM SUPPLIER WITH SOLID WASTE <br />LBS PER CUBIC YARD) <br />HANDLING PERMIT <br />APPLICATION. MULCH MAY <br />DISTURBED SURFACES THAT'WILL REMAIN <br />UNWORKED FOR. MORE THAN 7 DAYS A <br />THE WET: SEASON). ON DISTURBED. AREAS THAT, <br />NEED :COVER MEASURES FOR LESS THAN 30 DAYS. <br />¢ <br />? <br />P <br />rw <br />� <br />5 <br />t <br />As, A COVER FOR SEED DURING <br />£ <br />AND: DURING THE HOT SUMMER MONTHS. DURING <br />z <br />.THE WET SEASON, ON DISTURBED <br />STEEPER THAN 3H:1V WITH MORE THAN 10 FEET <br />RELIEF.OF VERTICAL <br />F <br />r•,.. •xuv . -_ ro ._v.ra., a .4.- <br />MAINTENANCE: MULCH MUST BE INSPECTED <br />REGULARLY AND MORE MULCH ADDED AS. <br />!, <br />NEEDED TO MAINTAIN THE , SUGGESTED <br />APPLICATION RATE. ALL RIPS OR TEARS IN <br />PLASTIC SHEETING SHALL �BE REPAIRED. <br />,. IT <br />NOTESPROPERLY OVERLAPPED AND WEIGHTED IN <br />r'€t PLACE; SHEETING SHALL BE RED -LAPPED AND ; <br />` WEIGHTS REPLACED AS NEEDED. <br />LIMITS LA 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT <br />MARK W1 ORANGE X <br />CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G.. SIZE <br />FLAGGING A AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES,CONSTRUCTION SE <br />BMP 1 <br />UTILITIES). <br />j 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />`= I REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF 1. PRIOR TO ANY CONSTRUCTION ACTIVITY,- THE CONTRACTOR <br />THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION 13 COMPLETED AND SHALL SCHEDULE AND ATTEND A, PRE —CONSTRUCTION <br />ON { I ` , TY L11 elm �` CONFERENCE WITH THE CITY OF EVERETT- INSPECTOR. SEE <br />d' APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. ( <br />3, THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE PERMIT FOR INSPECTION SCHEDULING INSTRUCTIONS.) <br />CLEARLY FLAGGED 1IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE <br />CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS 2° INSTALL ORANGE PLASTIC CLEARING LIMIT FENCING AS <br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE INDICATED.CL <br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />t 3. INSTALL ALL. SILT FENCE AND INLET PROTECTION. <br />STOCKPILE;:'' 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION <br />SEENOTE I` WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO <br />w` ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE.`�. CLEAR FOR AND CONSTRUCT THE TEMPORARY CONSTRUCTION <br />BMP 2 SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. ACCESS. <br />TOPSOIL . THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR5. REMOVE EXISTING STRUCTURES, CLEAR, GRUB; AND GRADE FOR <br />SEA "` ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC UTILITY CORRIDORS. <br />HOUSE . EXFACILITIES SHALL BE UPGRADED A NEEDED FOR UNEXPECTED STORM EVENTS AND <br />CONSTRUCTION f ' TO ENSURE THAT SEDIMENT AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE < MAINTAIN EXISTING PERIMETER VEGETATION AND ADD <br />COE m DET. 201 x 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE ADDITIONAL ROW OF SILT FENCING WHERE NECESSARY. <br />SHE'®7 APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY <br />BMP 1 05 AFTER STORM EVENTS 7. CONSTRUCT UTILITIES, AND CURB AND GUTTER PER APPROVED <br />EX. HOUSE . 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A DESIGN PLANS. <br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM <br />I EVENT 8. APPLY MULCH TO UNCOVERED AREAS IN ACCORDANCE WITH <br />Ld <br />8° AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO THE MULCH DETAIL THIS SHEET. <br />IMX-1ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE �y <br />t LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT � EXCAVATE TO. SUBGRADE OF PERMEABLE ASPHALT SECTION �t <br />- s}� I AND INSTALL PERMEABLE ASPHALT PER NOTE ON SHEET 3 OFLO <br />" EX. HOUSE { �� I € € ,�' � � � FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />° . STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF 6° _ <br />I CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />.,. _ x ;, F -, 10. INSTALL SILT FENCE AT BACK OF CURS ALONG FRONTAGE TO <br />{ f I i 44 MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br />I I P PER ASPHALT. <br />: rr d FOR THE DURATION OF THE PROJECT. <br />PROTECT PERMEABLEgJU <br />STD. `fig <br />" ..4 _., r..' ID 10° THE CONTRACTOR SHALL PROVIDE PERIODIC STREET GLEANING TO REMOVE DEBRIS <br />I 11. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS r - <br />I r SEE AND SEDIMENT TRACKED OFF THE SITE° t� <br />f �f _ MUST E STABILISED IN ACCORDANCE WITH THESE PLANS AND <br />°11, APPRUPRIATE MEASURES SHALL B_ TAKEN TO STOP SEDIMENT FEN ROM TERING APPLICABLE MPS REMOVED. <br />3 3 n I2 SURFACE WATER BODIES IF THE PROPOSED BMPS' FAIL, <br />12 BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UN STABILIZED <br />:. ___. - _ I 30; AND FOR NO <br />FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRL <br />>. 28 (. MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />ef <br />rr <br />,..:_3PERMANENT SEEDING <br />t <br />On- <br />LU <br />w. PERMANENT COVER BMP(HYDROSEEDIIGGENERAL I <br />ip . <br />ti BENCHMARK <br />1I Al ; I EL=73.7J NOOEM <br />_ CITY OF EVERTT <br />r c� 1. CONSTRUCTION ION ACCEPTANCE. WILL BE <br />STA - 7--2-0 <br />SUBJECT TO A WELL ESTABLISHED GROUND COVER tu <br />N AVD <br />r`' /y q/q: THAT FULFILLS THE REQUIREMENT OF THE <br />✓' d-%€7 � ` r �/ N89q07,I0„J°"Y' E 663- <br />s APPROVED CONSTRUCTION PLANS. <br />..., ._ ..,- <br />d ✓.... ., i r .. ; a . <br />__.._.»., .. <br />2 ALL DISTURB D AREAS SUCH AS DETENTION <br />J � _>:zq:wM.9+FACILITIES, ROADWAY BACK —SLOPES ETC SHALL _ <br />. , :'� '• .-. r �"Y : «, r�� _ : s - - OVER <br />� BE SEEDED WITH A PERENNIAL GROUND C <br />, .:: .,, ;" w C , r,r� , �� GRASS TO MINIMIZE EROSION. GLASS SEEDING WILL <br />z l ICE DONE USING AN APPROVED HYDROSEEDER OR <br />f t <br />HORIZONTAL SCALE AS OTHERWISE APPROVED BY TIDE CITY OF ° <br />_ ._ _ . <br />_.__ _ w.............__ <br />_ _........ _ T <br />pp� <br />�= EVERE T <br />,s <, " <br />3. PREPARATION OF SURFACE: ALL AREAS TO <br />BE SEEDED SHALL BE CULTIVATED TO THE <br />SATISFACTION OF THE CITY INSPECTOR.THIS MAY WHN BE ACCOMPLISHED BY DISCINGRAKI , <br />HARROWING OR OTHER ACCEPTABLE MEANS. <br />cn <br />LL <br />4. IMMEDIATELY FOLLOWING FINISH GRADING, ULI <br />PERMANENT VEGETATION (CONSISTING OF RAPID, > > C) 0 W <br />PERSISTENT AND LEGUME) WILL BE APPPLIED.. <br />TOPSOIL/STOCKPILE NOTE; NOTE(MINIMUM 80# PER ACME). THIS IS TO INCLUDE <br />PILES ARE TO BE COVERED W PLASTIC THE FOLLOWING: 20% ANNUAL, PERENNIAL OR <br />/ CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS ATs <br />SHEETING WITHIN 24-HOURS> HYBRID RYE GRASS, 40% CREEPING RED FESCUE, <br />ALL TIMES DURING CONSTRUCTION, DUST SUPPRESSION AND 40% WHITE CLOVER. HYDROSEED REQUIRED. <br />STREET CLEANING MUST OCCUR AS DIRECTED BY THE PUBLIC <br />CONTRACTOR TO INSTALL SILT FENCING WORKS INSPECTOR. WHERE NECESSARY ALONG PERIMETER. IF 5. FERTILIZER: SHALL BE APPLIED AT 400# PER <br />VEGETATIVE BUFFER DOES NOT PROVIDE ACRE OF 10-=20-20 (10 LB. PER 1,100 SQUARE <br />ADEQUATE PROTECTION. FEET) OR EQUIVALENT. <br />PROD. NO. - DSN. BY: <br />ims <br />i(� 'jam 161109 <br />1' 3 3 i1 9 2/2/20 <br />FO <br />Know b below. SCALE: 1 1a ®2' <br />Call two businessDRAWING NO. <br />days before you dig.2 10.. <br />SS19_010 OF: <br />. - - - <br />