My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2509 HOYT AVE 2022-04-19
>
Address Records
>
HOYT AVE
>
2509
>
2509 HOYT AVE 2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2022 2:02:41 PM
Creation date
4/19/2022 2:01:57 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2509
Notes
BACKWATER VALVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P1arch 12, 2014 <br />'U6L/C WOR/C.� <br />]ahn & Kathy Reed <br />2509 Hoyt Ave <br />Everett, WA 9820t <br />Re: Backwa[er Valve Installa6on at 2509 Noyt Ave <br />Dearlohn & Kathy Reed: <br />The City's contrador, Steve's Plumbing, inspeded your plumbing and drainage on Sep[ember 24, <br />2013 to determine if a back�vater valve is appropriat2 for your property. Their findings indicate that <br />installina a backwater valve on your property would be beneficial. Please review the enclosed report. <br />Previously, you siyned the Baclava[er Valve Aulhorizatlon Form auHiorizirg the City to install a <br />backwaler valce at your property. Based on the inspedion repor; we are proceeding with the <br />instal!ation. The CitV's contractor Archer Construction will be contactina vou in March to <br />schedule the work. This will require some excavation on your property. <br />The City �vill provide you on-site training on the operation and maintenance of the backwater valve. <br />��laintenance of the valve and the plum6ing, sewer, and drainagc on your property are your <br />responsibility. The inspection idenlified additional site drainage and plumbing deficiencies in your <br />prvate drainage and plumbing syslem. These indude: <br />• Re-route driveway drain to storm drain on south side of building, <br />• Hydro jet line to ciean cast iron build up in lhe internal plumbing. <br />• The other back�vater valve inslalled oft the rear of the building needs to be brought up to <br />code. <br />fhese deficiencies are your responsibility to address, as you desire. The City is not responsible for <br />future sewer or storm damages tha[ may result (rom improper maintenance of, or de iciencies wilhin, <br />yocr privale plumbing and drainage system. <br />If you have any questions about this process, please contact Grant ��toen at 925-257-8947 or <br />gmoen(a�evereltwa,go� or Brian Doolan at 425-257-8828 or bdoolan aeveretriva.c�o_v. Thank you for <br />your interest in our backwa[er valve program. <br />Sincerely, <br />`��I <br />���'�-- -� <br />Mark Sadler <br />Maintenance Superintendent <br />Evcrett Public Works <br />CITY OF E\/ERETT • 3200 Cedar Stree� • Everetl, VUN 9L�201 •(425) 257-8800 • Fax (425) 257-8882 j, <br />�, �f� <br />
The URL can be used to link to this page
Your browser does not support the video tag.