Laserfiche WebLink
FOUNDATION <br />® VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO COMMENCING <br />ANY WORK. <br />® GENERAL CONTRACTOR AND/OR FOUNDATION CONTRACTOR SHALL VERIFY <br />D PRIOR TO POURING <br />TI OWNS THE LOCATION OF ANCHOR BOLTS AND HOL 0 <br />CONCRETE. <br />® ALL FOOTING SHALL BEAR 18" BELOW UNDISTURBED NATURAL SOIL. <br />FINISHED GRADE SHALL BE NO LESS THAN 12" ABOVE BOTTOM OF <br />FOOTINGS. <br />® TOP OF FOOTING SHALL BE LEVEL. BOTTOM SURFACE OF FOOTING SHALL <br />NOT SLOPE MORE THAN 10%. STEP FOOTING AS NECESSARY TO MAINTAIN <br />MIN. DEPTH OF FOOTING BELOW FINISHED GRADE. <br />® FOUNDATION WALL SHALL EXTEND MINIMUM 6" ABOVE FINISHED GRADE. <br />® ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED. <br />® UNLESS NOTED OTHERWISE OR IN SHEAR WALL SCHEDULE, ALL ANCHOR <br />BOLTS SHALL BE %" dia. x 10" AND EXTEND MINIMUM 7" INTO CONCRETE <br />WITH MINIMUM SPACING OF 48" ON CENTER. EACH ANCHOR BOLT SHALL <br />HAVE A 3"x3"x.229" GALVANIZED WASHER. <br />® SEE SHEARWALL & HOLDOWN SCHEDULES FOR SIZE AND PLACEMENT. <br />® CRAWLSPACE ACCESS SHALL BE A MIN. OF 18N24". OPENINGS THROUGH A <br />PERIMETER WALL SHALL BE NOT LESS THAN 16"x24". (R408.4) <br />® PROVIDE A 6 MIL. BLACK VAPOR BARRIER OVERALL CRAWLSPACE AREAS. <br />(R406.3.2) <br />® PROVIDE 2" SAND OVER 6 MIL BLACK VAPOR BARRIER OVER 4" COMPACTED <br />GRANULAR FILL UNDER ALL CONCRETE SLABS. <br />® PROVIDE TEMPORARY BRACING AS REQUIRED UNTIL ALL PERMANENT <br />CONNECTIONS ARE IN PLACE. <br />® ALL ISOLATED SPREAD FOOTING TO BE 24"x24"x8" REINFORCE FOOTINGS <br />WITH (2) #4 BARS EACH WAY UNLESS NOTED OTHERWISE IN PLAN. <br />• FOUNDATION WALLS THAT RETAIN EARTH AND ENCLOSE INTERIOR SPACES <br />AND FLOORS BELOW GRADE SHALL BE DAMPPROOFED FROM TOP OF <br />FOOTING TO FINISHED GRADE. (R406.1) <br />® SEE SIMPSON RECOMMENDATIONS FOR HOLD DOWN PLACEMENT. <br />COORDINATE LOCATIONS WITH DOOR & WINDOW ROUGH FRAMING TO <br />PROVIDE ACCURATE DIMENSION FOR OPENINGS. <br />FOUNDATION T <br />(R408.1) PROVIDE 1 SQ. FT. OF VENTILATION FOR EVERY 300 SQ. FT. OF <br />CRAWLSPACE. FOUNDATION VENTS SHALL BE EXTRUDED, LOAD BEARING <br />16"x8" VENTS. <br />PROVIDE A MINIMUM OF (1) FOUNDATION VENT WITHIN T-0", BUT NOT WITHIN <br />THE FIRST 1'-0" OF EACH CORNER OF CRAWLSPACE. <br />ASSUMED VENTS ARE MIN. 15.5'W" AND HAVE A NET FREE VENTILATION AREA <br />OF .48 SQ. FT. <br />FOUNDATION VENT CALCULATIONS <br />CRAWLSPACE AREA <br />1123 SQ FT <br />NET VENTILATION <br />AREA / 300 SQ FT <br />3.74 NET AREA <br />NUMBER OF VENTS REQ'D <br />NET AREA / 0.48 <br />8 <br />OPTIONAL POWER VENT <br />CRAWLSPACE HEIGHT 3 <br />224.6 CFM <br />MAB <br />48'-0" <br />T <br />T <br />3T-2%" <br />10'-C" <br />I <br />I <br />I <br />I <br />I <br />F-03 <br />� I <br />� <br />I <br />I j <br />— <br />F-03 <br />— <br />I <br />I <br />I <br />j <br />21'-2%" <br />i <br />I <br />15 6%2' <br />I <br />11'-2%" <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />CONCRETE LANDING & STEPS <br />I <br />I <br />j <br />,TO GRADE PER I.R.C. <br />I <br />I <br />CC-4 <br />OD <br />I <br />I <br />I <br />i <br />--- <br />--- <br />OLTS ' NO <br />— — — — — — — <br />01 <br />— —I— — <br />— — <br />— — <br />— <br />_ <br />T <br />P. <br />� <br />L <br />8" CONCRETE STEM WALL <br />I <br />I <br />I <br />j 12' 3" <br />; •f <br />3' 0%" a <br />ON 16"x8" CONCRETE FOOTING <br />I <br />(TYP. U.N.O.) <br />CRAWLSPACE <br />61gIL. BLACK V.B. <br />TYP. F ' <br />j <br />I Ia <br />�016'-7%" <br />6'-7%" <br />6'-7%" 6' 7%4' <br />6' 7%a° <br />2' 0 <br />I <br />I <br />i <br />• .� <br />I <br />I <br />j I <br />- — — — — — — ——--------- <br />— — - - <br />�------------- <br />I — — — <br />— — — — --- — — <br />- - - - - <br />---- - - - - -- <br />fF_]0Z2--------- ---------- <br />TYP.- <br />I <br />F-®� -- <br />�— <br />-�rT- <br />------- - - - <br />i. <br />LJ <br />I <br />2'- 6/z" 2'-6/" 3'-4" 4'-2%4" j <br />5'-3% <br />5'-3%" 1' 4" <br />1, 10'-8C" <br />j <br />10'42 <br />—--------------------- <br />—I --- <br />— -- — — — — — — —- <br />I — — — — — — — — <br />— — — — -- — — — — — --- <br />I°GAKAUt <br />bLAB <br />® <br />4" CONC. SL�B. SLOPE MIN. 8" <br />PER 1'-0" TOWARDS GARAGE DOORS. <br />I <br />F-02 <br />i ACCESS <br />I <br />i ( <br />TYP.—F <br />' 7—— <br />I <br />I <br />( <br />I0 5'-3%" 5'-3%, <br />5'-3%' 5'-3%" V-4 <br />j <br />I <br />`a f <br />NO BOLTS <br />------- <br />— --I lL <br />— — — --- — - <br />-- <br />— ------- ------ <br />CONT. - UNDER GARAGE -- <br />-- �'--------- <br />—�— <br />— <br />-------- <br />I— <br />:. <br />`W N <br />y <br />� <br />blil <br />--� — <br />— — — — — — — _ _ _ <br />—�— — — <br />— — <br />CONCRETE LANDING & STEPS <br />TO GRADE PER I.R.C. <br />— --- — — <br />F-03 <br />— — --- ---�------------ -- <br />—— i iI <br />j <br />j <br />5/ <br />5Y <br />I f <br />I <br />I <br />I <br />2'-8%2" <br />I I <br />16'-3" 2'-6%" <br />2'-0" <br />13'-0" <br />11'-6" <br />21'-6" <br />4&-0" <br />n� <br />CD <br />-------------- -- - <br />-------- <br />N <br />— —------------- <br />P, <br />NOTE1 J <br />ALL FOUNDATION A <br />TO B CALLED OUT <br />CONCRETE FOOTING SCHEDULE <br />SYM. <br />FOOTING SIZE <br />RE -BAR <br />PLACEMENT <br />F-01 <br />*16"x8" CON'T. <br />(2) #4 CON'T. <br />F�02 <br />24"x24"x8" <br />(2) #4 EA. WY. <br />F-03 <br />*24"x24"x8" <br />(2) #4 EA. WY. <br />F-04 <br />30"xWN8" <br />(3) #4 EA. WY. <br />F-05 <br />*32"02x8" <br />(3) #4 EA. WY, <br />F-06 <br />*36"x36'W" <br />(3) #4 EA. WY. <br />NOTE: <br />*EXTERIOR FOOTINGS SHALL BE MIN. <br />18" BELOW GRADE AND REST ON <br />BEARING SOIL. <br />ELECTRONIC COPY <br />ORIGINAL ON FILE AT <br />ROSS ENGINEERING DESIGN <br />(N <br />Oo <br />W <br />0) <br />N z�w N N �Ns>. O �o�ma�0000 <br />oz O y o� o o E 9 ro R o Q a <br />a z C <br />r ro croi n. N. U c c cpi U E m c o <br />2 0 m a o a a ro m o a w y S <br />" m om u E_ w <br />W JCL d C N O N Q_ O <br />O W W 0 0 ` a s C� 0 0 <br />U J c O U tO .. O N O O .C- - 0 "" 'ro0 <br />�'-a�p-osroEa` z o <br />W — ~o-H. N p-o <br />F=- `� m> N E v <br />m, <br />tt, 3 S1; <br />L <br />i <br />NE <br />Ioil <br />x <br />IF <br />A-wallol <br />FOUNDATION <br />PLAN <br />I PRINT DATE 9/23/2020 2:05 PM <br />