My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 26 05 48.16 Seismic Controls for Electrical Systems I <br /> 26 05 72 Overcurrent Protective Device Short-Circuit Study <br /> 26 05 73 Overcurrent Protective Device Coordination Study <br /> 26 05 74 Overcurrent Protective Device Arc-Flash Study <br /> 26 12 00 Medium-Voltage Transformers <br /> 26 13 00 Medium-Voltage Switchgear <br /> 26 24 16 Panelboards <br /> 26 27 26 Wiring Devices , <br /> 26 29 23 Medium-Voltage Variable-Frequency Motor Controllers <br /> 26 36 00 Low-Voltage Variable-Frequency Motor Switches 1 <br /> 26 36 10 Medium-Voltage Variable-Frequency Motor Switches <br /> 26 50 00 Lighting <br /> DIVISION 28— ELECTRONIC SAFETY AND SECURITY <br /> 28 23 00 Video Surveillance I <br /> DIVISION 31 — EARTHWORK <br /> 31 23 33 Trenching, Backfilling and Compacting for Utilities 1 <br /> 31 23 43 Earthwork <br /> 31 25 14 Soil Erosion and Sediment Control <br /> 31 41 00 Excavation Support Systems <br /> 31 61 00 Drilled Micropiles I <br /> DIVISION 32— EXTERIOR IMPROVEMENTS <br /> 32 12 16 Hot Mix Asphalt (HMA) Paving I <br /> 32 91 19 Topsoiling and Finished Grading <br /> 32 92 33 Seeding I <br /> DIVISION 33— UTILITIES <br /> 33 05 01 Pipe and Fittings <br /> 33 05 16 Concrete Manhole <br /> 33 12 23.13 Electronic Surge Control Panel I <br /> 33 44 10 Manhole Sump Pump <br /> DIVISION 40— PROCESS INTERCONNECTIONS <br /> 40 71 13 Full Insertion Magnetic Flow Meter <br /> I <br /> City of Everett iv January 2022 <br /> Evergreen Way Pump Station Modifications <br /> UP3747-3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.