My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> I <br /> PART 1 : GENERAL <br /> 1.01 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> A. The Work to be performed will include furnishing all labor, materials and <br /> equipment necessary to perform all Work as required by the Contract in <br /> accordance with the Contract Documents. <br /> B. The Project Site is located at 6107 Evergreen Way, Everett WA. <br /> 1.02 PROJECT MANAGER <br /> A. Questions and inquiries about the Contract Documents should be directed to the <br /> attention of Randy Loveless, City of Everett Project Manager at (425) 257-8825 <br /> or email RLoveless@everettwa.gov. <br /> 1.03 STANDARD SPECIFICATIONS <br /> A. The following other Specifications and Standard Plans shall apply to the extent to <br /> which they are called out in the Contract Documents. <br /> 1. WSDOT "2020 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter <br /> referred to as the "Standard Specifications." <br /> 2. City of Everett"Design and Construction Standards and Specifications" <br /> (Revised January 2018), as found online on the City's Website at: <br /> httgs://everettwa.gov/1531/Design-Construction-Standards <br /> 3. "Standard Plans for Road and Bridge Construction," latest edition as <br /> prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> 5. APWA Standards, latest edition. <br /> 6. AWWA Standards, latest edition. <br /> 7. American Concrete Institute (ACI), latest edition <br /> 1.04 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> REGULATIONS <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract <br /> Documents to satisfy themselves, by personal examination, physical testing, or <br /> by such other means as they may prefer, of the location of the proposed Work, <br /> the actual physical conditions of and at the Site, surface and subsurface <br /> conditions, and conditions ordinarily to be encountered and generally recognized <br /> as inherent in the Work. If, during the course, or as a result of such inspection, <br /> examination and testing, a Bidder finds facts or conditions that appear to conflict <br /> or are omitted from the Contract Documents, or with other data or material made <br /> City of Everett 00 21 13-1 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.