My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 21 13 INSTRUCTIONS TO BIDDERS <br /> 8. Approval of Subcontractors: Contractors shall request approval of <br /> Subcontractors on a form provided by the City prior to their working on <br /> the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 1 <br /> 00 72 00, Part 5 "Progress and Completion", of the Contract Documents <br /> by the Contractor within ten calendar days, or such time as determined by <br /> the City, after the date of receipt of Notice to Proceed. I <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the <br /> City's Design and Construction Standards. If, and to the extent, such <br /> plans are not sufficient, complete or adequate to support the Bidder's I <br /> planned means and methods of performing the Work, the Bidder must <br /> develop an adequate, complete and sufficient traffic control plan at its <br /> cost, that shall be submitted for the City's approval prior to construction. <br /> Deviation from the Standard Plans must be submitted by the Contractor <br /> and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to I <br /> be used, and also provide copies of the permits and approvals for such <br /> disposal sites. The Contractor shall provide the City with copies of all <br /> permits for disposal and storage of surplus materials within ten calendar <br /> days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING <br /> A. The City reserves the right to postpone the date and time for receiving or opening <br /> of Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of <br /> addenda. <br /> 1.24 BUSINESS LICENSE I <br /> A. A City of Everett business license is required for the Contractor and <br /> Subcontractors performing Work on this Project. <br /> PART 2 : PRODUCTS <br /> Not Used. <br /> PART 3 : EXECUTION <br /> Not Used. <br /> END OF SECTION 00 21 13 1 <br /> I <br /> I <br /> City of Everett 00 21 13-10 January 2022 1 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.