My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00 2513 <br /> PRE-BID MEETING <br /> PART 1 : GENERAL <br /> 1.01 SUMMARY <br /> A. A pre-bid meeting will be held to discuss the project. Attendance is not <br /> mandatory for prospective bidders. At this meeting the items on the Agenda will <br /> be covered (see 1.05 AGENDA). <br /> B. Each Bidder must sign the sign-in sheet at the meeting. <br /> 1.02 DATE <br /> A. Meeting -January 20, 2022. <br /> 1.03 LOCATION <br /> A. The meeting place will be at the site: 6107 Evergreen Way, Everett WA. <br /> 1.04 TIME <br /> A. On Thursday January 20, 2022, the meeting/site visit will start promptly 1:00 pm. <br /> 1.05 AGENDA <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> D. Review Scope of Work <br /> E. Review Addendums to date <br /> F. Review bid documents, instructions to bidders etc. <br /> G. Review Bid Sheet <br /> H. Receive questions, comments from bidders <br /> 1. Contractors free to wander construction site <br /> 1.06 ADDENDA <br /> A. All addenda released are required to be signed and attached to the bid proposal. <br /> B. Bid proposals with addenda that are not signed shall be considered non- <br /> responsive and the bid will be rejected. <br /> City of Everett 00 25 13-1 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.