Laserfiche WebLink
SECTION 00 2513 <br /> PRE-BID MEETING <br /> PART 1 : GENERAL <br /> 1.01 SUMMARY <br /> A. A pre-bid meeting will be held to discuss the project. Attendance is not <br /> mandatory for prospective bidders. At this meeting the items on the Agenda will <br /> be covered (see 1.05 AGENDA). <br /> B. Each Bidder must sign the sign-in sheet at the meeting. <br /> 1.02 DATE <br /> A. Meeting -January 20, 2022. <br /> 1.03 LOCATION <br /> A. The meeting place will be at the site: 6107 Evergreen Way, Everett WA. <br /> 1.04 TIME <br /> A. On Thursday January 20, 2022, the meeting/site visit will start promptly 1:00 pm. <br /> 1.05 AGENDA <br /> A. Review Scope of Project <br /> B. Review required documents to be submitted with the Bid Form <br /> C. Bid Due Date <br /> D. Review Scope of Work <br /> E. Review Addendums to date <br /> F. Review bid documents, instructions to bidders etc. <br /> G. Review Bid Sheet <br /> H. Receive questions, comments from bidders <br /> 1. Contractors free to wander construction site <br /> 1.06 ADDENDA <br /> A. All addenda released are required to be signed and attached to the bid proposal. <br /> B. Bid proposals with addenda that are not signed shall be considered non- <br /> responsive and the bid will be rejected. <br /> City of Everett 00 25 13-1 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />