Laserfiche WebLink
I <br /> I <br /> SECTION 00 43 36 <br /> PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating,ventilation,air conditioning, plumbing (as defined by RCW Chap. 18.106)and <br /> electrical work (as defined by RCW Chap. 19.28), and structural steel installation and <br /> I rebar installation, Bidder MUST either identify itself or Subcontractors in the chart below. <br /> If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK'. <br /> I 2. Bidder shall not list more than one Subcontractor for each category of work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel <br /> installation and rebar installation, Bidder fails (1) to submit as part of the Bid the <br /> I names of such Subcontractors, (2) to name itself to perform such Work, or (3) to <br /> write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> I 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation subcontractors <br /> applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, <br /> structural steel installation and rebar installation subcontractors who will contract directly <br /> Iwith the general contractor submitting the Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart <br /> I below must be submitted with the bid proposal or within one hour of the published bid <br /> submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be <br /> I submitted with the bid proposal or within forty-eight hours of the published bid submittal <br /> time. <br /> Type/Scope of Work Name and Address of <br /> 1 Subcontractor/Or Bidder <br /> HEATING 1. N 01) EN_ 6 ti1��t"a L/TV(- <br /> Subs ntractor, bidder or"no work" MUST be 0 ��— D1t��( t� <br /> state <br /> VENTILATION AND AIR CONDITIONING �� 0 ��1 { � T ��CI� j �� <br /> Subcontractor, bidder or"no work" MUST be <br /> stated [��' , -1 ��f��G 1/ 5', LyYIG��� 1uGG�1 <br /> tij <br /> I <br /> PLUMBING (as described in RCW Chap. 18.106) , `� i <br /> Subcontractor, bidder or"no work" MUST be V L C S(->Y1 ` v,C N ('1 ` <br /> C I <br /> stated ) 1 t 1/ C o 6{Vv i i t21? D4 C1� ��" <br /> I <br /> ECTRICAL (as described in RCW Chap. 19.28) - <br /> Subcontractor, bidder or"no work"MUST be stated / ,r?,-, _-- c.'(J <br /> STRUCTURAL STEEL INSTALLATION NV C\tk-"2 �� a—vi _ � Il JCti1 'E' <br /> L <br /> Subcontractor, bidder or"no work" MUST be ti' �C� <br /> stated bit y Cat.vC1'7 J it '\ <br /> REBAR INSTALLATION ? f iyS�a✓+(U(7 <br /> �,r i Z2-� l�4a 6'� �'�t v�G t�S 1� <br /> I <br /> Subcontractor, bidder or"no work" MUST be S a c Jr y <br /> stated -7 0� 6� ihQ CI �ci T <br /> I f '" - V i <br /> City of Everett 00 43 3 -1 January 2022 <br /> Evergreen Pump sttation Modifications <br /> I <br /> UP3747-3 <br />