I <br /> I SECTION 00 5213 <br /> AGREEMENT FORM <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this 30 day of rP1,t$ C-1-► ,d0 ), by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> I State of Washington, hereinafter called the "City," and <br /> MCC-Lou:: ('sj O SvNS r_w_ , hereinafter called the "Contractor." <br /> 1 In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> I accordance with the Specifications and Drawings entitled: "Evergreen Pump Station <br /> Modifications" (the "Project"). <br /> I 1. Contract Documents. "Contract Documents" is defined in Section 00 72 00 - <br /> GENERAL CONDITIONS. Terms that are capitalized in a Contract Document but not defined in <br /> that Contract Document shall have the meaning defined to them in the other Contract <br /> Documents. <br /> I2. Contract Time. Substantial Completion of the Work shall be achieved within three <br /> hundred sixty five (365) calendar days after the effective date of the Notice to Proceed. <br /> I Physical Completion shall be within Thirty (30) calendar days after the actual date of issuance of <br /> substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to <br /> 1 additional expense in the event that the Contractor does not complete the Work in all respects <br /> and have it ready for use by the Substantial and Physical Completion dates stated above. <br /> Because it is difficult to accurately compute the amount of such costs and damages, the <br /> I Contractor hereby covenants and agrees to pay to the City liquidated damages for each and <br /> every calendar day (or working day, if Contract Time is described in working days) in the <br /> amounts set forth in this Section. For failure to achieve Substantial Completion by the <br /> I Substantial Completion date stated above, the Contractor shall pay liquidated damages to the <br /> City computed at the daily rate of fifteen percent (15%) of the Contract Sum divided by the <br /> number of days of Contract Time stated above. Once Substantial Completion is achieved, for <br /> I failure to achieve Physical Completion by the Physical Completion Date stated above, the <br /> Contractor shall pay liquidated damages at the daily rate of ten percent (10%) of the liquidated <br /> damages rate applicable to delays to Substantial Completion. <br /> I4. Contract Sum. The amount of this Contract is H1 KO) IS 2.9 o <br /> and is based on the'proposal/bid submitted by <br /> I Contractor dated 41-I l -,�1,,. The basis for final payment will be the actual amount of <br /> work performed according to the Contract Documents and payments, whether partial or final, <br /> shall be made as specified therein. If, and to the extent, payment (in whole or in part) is based <br /> upon unit prices multiplied by quantities of work actually performed, the total amount paid to the <br /> I <br /> Contractor may be less than Contract Sum stated herein and the Contractor agrees to execute <br /> one or more change orders in such event. In no event shall the total amount paid Contractor <br /> exceed the Contract Sum stated herein, unless the Contract amount has first been increased by <br /> ICity of Everett 00 52 13-1 January 2022 <br /> Evergreen Pump Station Modifications <br /> I <br /> UP3747-3 <br />