Laserfiche WebLink
Section 00 52 13 AGREEMENT FORM <br /> 9. Insurance. The Contractor shall purchase and maintain such insurance as set forth in the <br /> Contract Documents. Failure to maintain such insurance shall be a material breach of the <br /> Contract. City shall be entitled to damages for such a breach that include, but are not limited to, <br /> any loss (including, but not limited to, third party litigation expenses and professional fees) <br /> suffered by the City if the City is determined to be solely or concurrently negligent, and if the <br /> City suffers any loss or must pay or defend against any such claim, suit, demand or damage as <br /> a result of such breach. <br /> 10. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution <br /> against the City. It is agreed and mutually negotiated that in any and all claims against the City, <br /> its agents or employees, the Contractor, a subcontractor, anyone directly or indirectly employed <br /> by the Contractor or subcontractor, or anyone for whose acts any of them may be liable, the <br /> defense and indemnification obligations hereunder shall not be limited in any way by any <br /> limitation on the amount of damages, compensation, or benefits payable by or for the Contractor <br /> or any subcontractor under industrial worker's compensation acts, disability benefit acts, or <br /> other employees' benefit acts. Contractor's and City's signatures hereto indicate specific waiver <br /> ' of Contractor's industrial insurance immunity in order to fulfill the indemnities hereunder. Solely <br /> for the purpose of indemnification and defense as provided in this Contract, the Contractor <br /> specifically waives any immunity under the State Industrial Insurance Law, Title 51 RCW. The <br /> Contractor expressly acknowledges that this waiver of immunity under Title 51 RCW was the <br /> subject of mutual negotiation and was specifically entered into pursuant to the provisions of <br /> RCW 4.24.115. <br /> 11. Repair of Damage. The Contractor agrees to repair and replace all property of the City and <br /> all property of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> ' 12. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under <br /> this contract is to be done at the Contractor's risk and that: (1) prior to submitting its bid, it <br /> became familiar with the conditions of excavation, subsurface, backfill, materials, climatic <br /> conditions, location, traffic, and other contingencies that may affect the work and has made its <br /> bid accordingly and (2) that it assumes the responsibility and risk of all loss or damage to <br /> materials or work that may arise from any cause whatsoever prior to completion. <br /> ' 13. Headings for Convenience Only. The headings in this document are for convenience <br /> only, and shall not be used or considered to interpret or construe this document. <br /> 14. Effective Date. This Contract is effective as of the date of the last person to sign it, and <br /> may be executed in multiple counterparts, each of which shall be deemed an original. <br /> t <br /> I <br /> City of Everett 00 52 13-3 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />