Laserfiche WebLink
Section 00 63 63 CHANGE ORDER-AGREED <br /> Change Order No. I <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the <br /> changes described in Exhibit A, including all direct and indirect costs and impacts. The <br /> contract price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be e adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, <br /> impact, overhead, or inefficiencies. This provision does not apply to requests for <br /> equitable adjustment of time or price for which the Contractor timely and properly <br /> provided notice of a differing site condition, protest, dispute, claim or Contract Claim as <br /> required by the Contract Documents. If the Contract Documents establish a time <br /> period for notice of a differing site condition, protest, dispute, claim, or Contract Claim <br /> that ends after the date of this Change Order, but relates to work performed prior to <br /> the date of this Change Order, then this provision does not apply if the Contractor <br /> timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> 7. A pdf, photocopy, or electronic signature on this Change Order is deemed the same as <br /> an original ink signature. <br /> I <br /> I <br /> I <br /> I <br /> City of Everett 00 63 63-2 January 2022 1 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> 1 <br />