McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 63 65 CHANGE ORDER- UNILATERAL <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall be I <br /> adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract for I <br /> seeking further equitable adjustment of time and compensation, including, but not limited <br /> to, delays, impacts, inefficiencies, overhead, and direct and indirect costs, and except as <br /> otherwise expressly provided herein, the Contractor will be barred from (a) asserting any <br /> claim for further adjustment of time and compensation arising out of, or relating to, the <br /> charges described in this Change Order or Work described in Exhibit A and (b) asserting <br /> an equitable adjustment of time or price arising earlier than the date of this Change <br /> order. <br /> This provision does not apply to requests for equitable adjustment of time or price for which the <br /> Contractor timely and properly provided notice of a differing site condition, protest, dispute, <br /> claim or Contract Claim as required by the Contract Documents. If the Contract Documents <br /> establish a time period for notice of a differing site condition, protest, dispute, claim, or Contract <br /> Claim that ends after the date of this Change Order, but relates to work performed prior to the <br /> date of this Change order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br /> CITY I <br /> Attest: Approved as to Form: <br /> I <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: I <br /> Construction Project Manager (if Engineering Manager Department Director <br /> Manager (if applicable) (if applicable) <br /> applicable) <br /> Date: <br /> Date: Date: Date: <br /> I <br /> City of Everett 00 63 65-2 January 2022 1 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> t <br />