Laserfiche WebLink
1 <br /> I <br /> Q24. Specification Section 03 31 16 Cellular Concrete Backfill states that "this <br /> section includes specification for placing cellular concrete backfill as indicated <br /> on the Drawings or when required to replace unsuitable soil under footings and <br /> slabs on ground." There is nothing shown on the Contract Drawings for where <br /> this material is to be placed, and there is no Unit Price or Force Account bid <br /> ritem for the compensation of this item if it is needed when "unsuitable soils" <br /> are encountered. Please advise as to where this item is needed, and how it is <br /> to be paid for if required as it appears to be needed for a Force Account bid <br /> item that has not been provided. <br /> RESPONSE: THE MATERIAL IS NOT USED AND SPECIFICATION 03 31 <br /> 16 HAS BEEN DELETED IN ADDENDUM 3, <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> 1 <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 17/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425)257-8882 <br />