My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 3/24/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Parametrix Inc. 3/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 3:05:26 PM
Creation date
4/22/2022 3:02:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
3/24/2022
Council Approval Date
3/23/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5 & US-2 Interchange Justification Report
Tracking Number
0003312
Total Compensation
$2,047,633.10
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Agency A&E Professional Services <br /> Negotiated Hourly Rate Consultant Agreement <br /> Agreement Number: 3750-01 <br /> Firm/Organization Legal Name(do not use dba's): <br /> Parametrix, Inc. <br /> Address Federal Aid Number <br /> 719 2nd Ave, Suite 200, Seattle WA 98104 STPUL-0420(025) <br /> UBI Number Federal TIN <br /> 600 135 349 91-0914801 <br /> Execution Date Completion Date <br /> 12/31/25 <br /> 1099 Form Required Federal Participation <br /> ❑ Yes El No El Yes ❑ No <br /> Project Title <br /> US 2/1-5 Interchange Justification Report Planning Study <br /> Description of Work <br /> The 1-5 & US-2 Interchange Justification Report Planning Study will develop and analyze <br /> various alternative improvements to the I-5/US-2 interchange, including connections of <br /> the interchange to local streets. The grant funds, in conjunction with local matching <br /> funds, support operational planning and pre-design work. The planning study will be <br /> integrated with the recently completed US-2 Westbound Trestle Study, completed by <br /> WSDOT. This integration should streamline the remaining schedule toward design and <br /> future construction of a new westbound US-2 Trestle. <br /> ❑ Yes I I No DBE Participation Maximum Amount Payable:$2,047,633.10 <br /> ❑ Yes ❑ No MBE Participation <br /> ❑ Yes ❑ No WBE Participation <br /> ❑ Yes ❑ No SBE Participation <br /> Index of Exhibits <br /> Exhibit A Scope of Work <br /> Exhibit B DBE Participation <br /> Exhibit C Preparation and Delivery of Electronic Engineering and Other Data <br /> Exhibit D Prime Consultant Cost Computations <br /> Exhibit E Sub-consultant Cost Computations <br /> Exhibit F Title VI Assurances <br /> Exhibit G Certification Documents <br /> Exhibit H Liability Insurance Increase <br /> Exhibit I Alleged Consultant Design Error Procedures <br /> Exhibit J Consultant Claim Procedures <br /> 3750-01 <br /> Local Agency A&E Professional Services Agreement Number <br /> Negotiated Hourly Rate Consultant Agreement Revised 02/01/2021 Page 1 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.