My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 4/8/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Dept of Ecology 4/8/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
4/22/2022 3:24:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
4/8/2022
Council Approval Date
3/30/2022
End Date
6/30/2024
Department
Public Works
Department Project Manager
Richard Tarry
Subject / Project Title
Stormwater Management Action Plan
Public Works WO Number
WQC-2022-EverPW-00090
Tracking Number
0003313
Total Compensation
$255,153.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:F3D9A733-6A18-49BE-8AF8-0CF4070E5C06 <br /> State of Washington Department of Ecology Page 13 of 41 <br /> Agreement No: WQC-2022-EverPW-00090 <br /> Project Title: City of Everett Stormwater Management Action Plan <br /> Recipient Name: City of Everett Public Works <br /> SCOPE OF WORK <br /> Task Number: 4 Task Cost: $124,641.00 <br /> Task Title: Stormwater Management Action Plan <br /> Task Description: <br /> A. The RECIPIENT will list and describe potential structural and non-structural stormwater management actions for the <br /> prioritized sub-basin or basin area. Structural actions will be stormwater retrofit BMP's and non-structural actions will include <br /> land management/development strategies, and targeted stormwater management program (SWMP)actions to support <br /> improved receiving water quality. Proposed retrofits and actions should match where the basin is in the Watershed <br /> Characterization model, i.e.,whether it primarily needs protection or improvement. The RECIPIENT will consider both short <br /> term and long-term actions. <br /> B. The RECIPIENT will provide for at least one opportunity for stakeholder review and comment on the list of proposed <br /> stormwater management actions. <br /> C. The RECIPIENT will prepare a draft SMAP,including a proposed implementation schedule, short and long-term goals, <br /> conceptual budget,potential funding sources,and adaptive management. <br /> D. The RECIPIENT shall provide opportunities for public comment and ECOLOGY comment on the draft SMAP. <br /> E. The RECIPIENT will prepare a final SMAP that considers and incorporates ECOLOGY and public comments and <br /> receives Ecology Acceptance Letter. <br /> F. The RECIPIENT is responsible for listing all required local, state,tribal and federal permits,licenses, easements,or <br /> property rights necessary for the project. <br /> G. The RECIPIENT will provide both the ECOLOGY project manager and separegister@ecy.wa.gov an initial consultation <br /> on any draft State Environmental Policy Act(SEPA)documents,if SEPA is triggered. The RECIPIENT will notify the <br /> ECOLOGY project manager, in addition to the required distribution and public notice, when SEPA documents are issued for <br /> the official comment period,which is a minimum of 21 days. <br /> H. The RECIPIENT will submit Ecology cultural resources review form to ECOLOGY,if required,to initiate cultural <br /> resources review of any conceptual design(s)for proposed stormwater retrofit projects. <br /> Task Goal Statement: <br /> Prepare Stormwater Management Action Plan. <br /> Task Expected Outcome: <br /> Development of stormwater retrofit and land management strategies intended to conserve,protect,or restore water quality in a <br /> selected receiving water. <br /> Template Version 12/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.