Laserfiche WebLink
QUANTITY FRAME MATERIAL OPERATION U-VALUE SHGC SILL FIT ! R <br />DOOR ; <br />D1' 3'-0" x 6'-8" <br />FIBERGLASS <br />SWING <br />27 0. <br />0.4 <br />ENTRY W/ DEADBOLT, SAFETY GLAZED <br />D2 3 0" x 6 8 <br />1 <br />FIBERGLASS <br />SWING <br />ENTRY W/ DEADBOLT <br />WINDOW <br />3'-0" x 5'-0"' 6 VINYL FIXED 0.27 0A <br />_.. <br />2'-8" <br />3'-0" x 1'-6" <br />4 <br />WNYL <br />AWNING <br />0.27 <br />0.4 <br />V-2" <br />MULLED WITH WINDOW W1 AT ALL INSTANCES, SAFETY GLAZED <br />3'-0" x 5'-0" 1 VINYL CASEMENT 5'-0'' x T-6" VINYL SLIDER 0.27 Q4 4'-2" <br />EW2 <br />S1 <br />491/2"x491/2" <br />PVC#5050 <br />FIXED <br />0.49 <br />0.27 <br />- <br />S2 <br />48" x 60" <br />1 <br />PVC <br />FIXED <br />0.49 <br />0.27 <br />- <br />`VERIFY` CUSTOM SKYLIGHT TO MATCH ADJACENT EXISTING <br />GENERAL NOTES: <br />7777777777 <br />1. "ENERGY SAVER" GLAZING (VALUES STATED PER NFRC TESTING). OPERABLES TO BE PROVIDED WITH SCREENS. <br />2. WINDOW FRAME SIZE IS THE ROUGH OPENING DIMENSIONS MINUS 1/2" IN BOTH DIEMNSIONS (WIDTH AND HEIGHT) <br />3. TEMPERED GLASS REQUIRED PER IRC AT DOORS/WINDOWS MARKED ON ELEVATIONS WTH (*) <br />4. ALL EGRESS MARKED ON ELEVATIONS WITH [E] AND TO HAVE MIN. OF NET 20" CLEAR WIDTH, 24" CLR. HEIGHT, AND NET 5.7 FT` OPEN AREA. <br />5. SKYLIGHTS TO BE CRYSTALITE FIXED STANDARD PVC/ALUMINUM SKYLIGHTS WITH ENERGY SAVER GLAZING <br />WINDOW SCHEDULE <br />2 <br />A3.0 <br />N <br />PROJECT <br />NORTH <br />CONSTRUCTION ASSEMBLIES: <br />NEW EXTERIOR WALL: <br />• PAINTED WOOD SIDING <br />• AIR/WEATHER BARRIER <br />• WALL SHEATHING PER SHEARWALL SCHEDULE <br />• 26 FRAMING @ 16" Q.C. <br />• R-21 BATT INSULATION <br />• VAPOR BARRIER <br />• 1/2" PAINTED GWB <br />NEW INTERIOR WALL: <br />• 1/2" PAINTED GWB <br />• 2x4 FRAMING @ 16" O.C. <br />• CAVITY INSULATION <br />• 1/2" PAINTED GWB <br />NEW FLOOR ASSEMBLY: <br />• FINISHED FLOOR MATERIAL BY OWNER <br />• 3/4" STRUCTURAL SHEATHING PER STRUCTAL NOTES <br />• 2x12 FRAMING PER FOUNDATION PLAN <br />• R-38 PAPER -FACED BATT INSULATION <br />NEW ROOF ASSEMBLY: <br />• ASPHALT SHINGLE ROOFING <br />• ROOF UNDERLAYMENT <br />• 7/16" ROOF SHEATHING PER STRUCTURAL NOTES <br />• MANUFACTURED TRUSSES <br />• R-49 BLOW-IN INSULATION <br />• VAPOR BARRIER <br />• 5/8" PAINTED GWB <br />EXIST. EXT, WALL TO BECOME INT. WALL: <br />• 1/2" PAINTED GWB <br />• [E] SHEATHING TO REMAIN <br />• [E] FRAMING TO REMAIN <br />• [E] EXISTING INSULATION TO REMAIN <br />[E] GWB TO REMAIN (INTERIOR SIDE) <br />VENTILATION SCHEDULE: <br />50 CUON StLjCH <br />24@ 120 CFM <br />50% RUN TIME FOR 3-1ED DWI <br />3 NEW/RELOCATED MINI -SPLIT UNIT <br />Z� <br />ACCORDING TO M1505.4.3. <br />WHOLE HOUSE EXHAUST FANS SHALL HAVE A SONE RATING OF 1.0 OR LESS WHEN <br />LOCATED 4' OR LESS FROM THE INTERIOR GRILLE. <br />GENERAL NOTES: <br />• SHADED WALLS/FLOOR AREA DENOTE EXISTING RESIDENCE TO Z1 <br />REMAIN AS -IS. <br />1 DIMENSIONS MEASURE TO FACE OF FOUNDATION/FRAMING OR <br />TO GRID U.N.O. <br />• SEE SHEET S-2.0 FOR SHEARWALL SCHEDULE. <br />• TYP. HEADER (2) 2x8 HF#2, U.N.O. <br />• EXHAUST VENTS TO VENT DIRECTLY TO EXTERIOR. <br />• SMOKE DETECTORS TO BE COMBINATION SMOKE/CARBON <br />MONOXIDE DETECTORS, INTERCONNECTED AND HARDWIRED <br />WITH BATTERY BACKUP. <br />• WATER HEATER SHALL BE ANCHORED TO RESIST HOR. <br />DISPLACEMENT WIN ONE-THIRD OF ITS HEIGHT TOP/BOTTOM. <br />MAIN FLOOR PLAN <br />SCALE: 1/4" = 14" <br />O„ 2' 4' 8' <br />Au <br />EVEBETT <br />F— <br />F— <br />W <br />W <br />W <br />c= <br />C= <br />Or- W <br />® <br />i.■ <br />'CC <br />� <br />C=m <br />W <br />t— <br />F� <br />C= c.+'3 <br />■� <br />W <br />uJ Q <br />VJ <br />rw <br />oC <br />�1 <br />F— <br />W <br />C/7 <br />Fiiii— <br />_ cr- <br />cmmmmj <br />Cr2 cn <br />r <br />o� <br />LA-3 <br />r <br />•� CV <br />��� <br />10942 <br />REGISTERED <br />ARCHITECT <br />4k1111 <br />tARIN A. SCHENK <br />STATE OF WASHINGTON <br />2021.12.22 <br />CONSULTANTS: <br />cO V-!AiN <br />.r•. -0 <br />JAN o 4 2022 <br />PROJECT: <br />MAYER RESIDENCE <br />3201 56TH STREET SW <br />EVERETT, WA 98203 <br />DRAWN: Enter Initials <br />DATE: OCTOBER 7, 2021 <br />PROJECT #: 2021.01 <br />SCALE: 1/4" = 1'-0" <br />PHASE: <br />REVISIONS <br />- <br />1 12 22.2021 BLDG. PERMIT REVISIONS <br />TITLE: <br />MAIN LEVEL FLOOR <br />PLAN <br />SHEET: <br />A201 <br />