Laserfiche WebLink
TABLE R602.3(l) <br />FASTENING SCHEDULE <br />11� 1 aI,p, NOTES: <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND TYPE <br />OF FASTENER a, b, c <br />SPACING AND LOCATION <br />I <br />Blocking between ceiling joists or rafters to top plate <br />4-8d box (2-1/2" x 0.113") or <br />Toe nail <br />3-8d common (2-1/2" x 0.131"); or <br />3-10d box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />2 <br />Ceiling joists to top plate <br />4-8d box (2-1/2" x 0.113"); or <br />Perjoist, toe nail <br />3-8d common (2-1/2" x 0.131"); or <br />3-10d box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />3 <br />Ceiling joist not attached to parallel rafter, laps over <br />4-10d box (3" x 0.128"); or <br />Face nail <br />partitions (see Section R802.5.2 and Table R802.5.2) <br />3-16d common (3-1/2" x 0.162"); or <br />4-3" x 0.131" nails <br />4 <br />eiling joist attached to parallel rafter heeljoint)Table <br />see Section R802.5.2 and Table R80 .5.2 <br />R802,5.2 <br />Face nail <br />5 <br />Collar tie to rafter, face nail or 11/4" x 20 ga. ridge strap <br />4-10d box (3" x 0.128"); or <br />Face nail each rafter <br />to rafter <br />3-10d common (3" x 0,148"); or <br />4-3" x 0.131" nails <br />6 <br />Rafter or roof truss to plate <br />3-16d box nails (3-1/2" x 0.135"); or <br />2 toe nails on one side and 1 toe nail <br />3 10d common Wads (3" x 0.148 ), or <br />on.opposite side of each rafter or <br />4-10d box (3" x 0.128"); or <br />truss <br />4-3" x 0.131" nails <br />4-16d (3-112" x 0.135"); or <br />Toe nail <br />3-10d common (3" x 0 148"}; or <br />4-10d box x t}.128"); <br />7 <br />Roof rafters to ridge, valley or hip rafters or roof rafter <br />(3" or <br />4-3" x 0.131' nails <br />3-16d box 3-1/2" x 0,135"); or <br />End nail <br />to minimum 2' ridge beam <br />2-16d common (3-1/2`° x 0.162"); or <br />3-10d box (3" x 0.128"); or <br />3-3" x 0,131" nails <br />WALLS <br />16d common 3-1/2„ x 0.16_7„ <br />( ) <br />24 o.c, face nail <br />8 <br />Stud to stud (not at braced wall panels) <br />14d box (3" x 0,128"); or <br />16°' o.c. face nail <br />3" x 0.131" nails <br />„ X <br />16d box 3 'I/2 0.135" • or <br />7„ <br />1- o.c. face nail <br />9 <br />f' P <br />Stud to stud and abutting studs at intersecting wall corners <br />9 g <br />"x <br />3 0.131 nails <br />16d common (3-1/2" x 0.162") <br />16" o.c. face nail <br />(at braced wall panels) <br />" X <br />16d common 3-1/2 0.162°' <br />( <br />16" o.c. each edge face nail <br />g <br />10 <br />Built-up header (2" to 2" header with 1/2" spacer) <br />16d box (3-1/2" x 0.135") <br />12" o.c. each edge face nail <br />11t <br />Continuous header o stud <br />t <br />"x <br />5 8d box 2-1/2 0.113 or <br />Toe nail <br />4-8d common (2-112" x 0.131 "); or <br />4-1 Od box (3"x 0.128") <br />" X <br />16d common 3 1/2 .162°' <br />0 <br />( ) <br />16°' o.c. face nail <br />i <br />1_ <br />Top late to to late <br />PP PP <br />„x <br />10d box 3 0.128" � or <br />( ), <br />7°' <br />1_ o.c. face nail <br />c <br />"x <br />3 0.131' nails <br />13 <br />Double plate splice <br />le to t ce <br />P P P <br />" X <br />8 16d common 3 1/ 0.162" • or <br />2 <br />( ), <br />P <br />Fac., nail on each side of end joint <br />J <br />12-16d box 3-112" x 0,135" ); or <br />(minimum 24" lap splice length each <br />12-10d box (3" x 0.128"); or <br />side of end joint) <br />12-3" x 0.131" nails <br />16d common (3-1/2" x 0A62") <br />16" o.c. face nail <br />14 <br />Bottom plate to 'oist, rim joist, band joist or <br />blocking (not atsraced wall panels) <br />16d box (3-1/2" x 0.135"); or <br />12" o.c. face nail <br />3" x 0.131"nails <br />15 <br />Bottom plate to joist, rim joist, band joist or <br />3-16d box (3-1/2" x 0.135"); or <br />3 each 16" o.c. face nail <br />blocking (at braced wall panel) <br />2-16d common (3-1/2" x 0.162"); or <br />2 each 16" o.c. face nail <br />4-3" x 0.131" nails <br />4 each 16" o.c, face nail <br />4-8d box (2-1/2" x 0.113"); or <br />Toe nail <br />3-16d box (3-1/2" x 0.135"); or <br />4-8d common (2-1/2" x 0.131"); or <br />4-10d box (3" x 0.128"); or <br />16 <br />Top or bottom plate to stud <br />4-3" x 0.131" nails <br />3-16d box (3-1/2" x 0.135"); or <br />End nail <br />2-16d common (3-1/2" x 0.162"); or <br />3-10d box (3" x 0.128"); or <br />3-3° x 0.131" nails <br />17 <br />Top plates, laps at corners and intersections <br />3-10d box (3" x 0.128"); or <br />Face nail <br />2-16d common (3-1/2" x 0.162"); or <br />3-3" x 0.131" nails <br />18 <br />1" brace to each stud and plate <br />3-8d box (2-1/2" x 0.113"); or <br />Face nail <br />2-8d common (2-1/2" x 0A 31 "); or <br />2-10d box (3" x 0A 28" ); or <br />2 staples 1-3/4" <br />19 <br />1" x 6" sheathing to each bearing <br />3-8d box (2-1/2" x 0.113"); or <br />Face nail <br />2-8d common (2-1/2" x 0.131"); or <br />2-10d box IF x 0.128"); or <br />2 staples, °' crown, 16 ga., 1-3/4" long <br />3-8d box (2-1/2" x 0.113"); or <br />Face nail <br />3-8d common'2-1/2" x 0.131"); or <br />3-10d box (3" x O'128"); or <br />3 staples, i crown, 16 ga., 1-3/4" long <br />20 <br />1" x 8" and wider sheathing to each bearing <br />Wider than 1" x 8" <br />Face nail <br />4-8d box (21/2" x 0.113"); or <br />3-8d common (21/2" x 0.131"); or <br />3-10d box (3" x 0.128"); or <br />4 staples, '( crown, 16 ga., 13/4" long <br />Floor <br />4-8d box (2-1/2" x 0.113"); or <br />Toe nail <br />3-8d common (2-1/2" x 0.131"); or <br />21 <br />Joist to sill, top plate or girder <br />3-10d box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />8d box (2-1/2" x 0.113") 4" o.c. <br />Toe nail <br />22 <br />Rim joist, band joist or blocking to sill or top <br />plate (roof applications also) <br />8d common 2-1/2" x 0.131 °' ; or <br />( ) <br />6" o.c. toe nail <br />1®d box (3" x 0.128"); or <br />3'° x 0.131" nails <br />3-8d box (2-1/2" x 0.113"); or <br />Face nail <br />2-8d common (2-1/2" x 0.131"); or <br />23 <br />1" x 6" subfloor or less to each joist <br />3-10d box (3" x 0.128"); or <br />2 staples, 1" Crown, 16 ga., 1-3/4" Tong <br />24 <br />2" subfloor to joist or girder <br />3-16d box (3-1/2" x 0.135"); or <br />Blind and face nail <br />2-16d common (3-1/2" x 0.162") <br />25 <br />2" planks (plank & beam -floor & roof) <br />3-16d box (3-1/2" x 0.135"); or <br />At each bearing, face nail <br />2-16d common (3-112" x 0.162") <br />26 <br />Band or rim joist to joist <br />3-16d common (3-1/2" x 0.162") <br />End nail <br />4-10 box S3' x 0.128"), or <br />4-3" x 0.1 1"nails; or <br />4-3" x 14 ga. staples, 7116" crown <br />20d common (4" x 0.192"); or <br />Nail each layer as follows: 32" o.c. at <br />top and bottom and staggered. <br />10d box (3" x 0.128"); or <br />24" o.c. face nail at top and bottom <br />27 <br />Built-up girders and beams, 2-inch lumber <br />layers <br />3" x 0.131" nails <br />staggered on opposite sides <br />And: <br />Face nail at ends and at each splice <br />2-20d common (4" x 0.192"); or <br />3-1od box (3' x 0.128"); or <br />3-3" x 0.131" nails <br />28 <br />Ledger strip supporting joists or rafters <br />4-16d box (3-1/2" x 0.135"); or <br />At each joist or rafter, face nail <br />3-16d common 3-1/2" x 0.162"); or <br />4-10d box (3" x .128"); or <br />4-3" x 0.131" nails <br />29 <br />Bridging or blocking to joist <br />2-10d box (3" x 0.128"), or 2-8d comm <br />nEach end, toe nail <br />(2-1/2' x 0. 31"; or 2-3 x 0.131") nails <br />SPACING AND LOCATION <br />ITEM <br />DESCRIPTION OF BUILDING ELEMENTS <br />NUMBER AND TYPE <br />OF FASTENER a. b: c <br />EDGES <br />(inches)h <br />INTERMEDIATE <br />SUPPORTS <br />(inches)c, e <br />Wood structural ppanels, subfloor, roof and interior wall sheathing to framing and particleboard wall sheathing to framing <br />Isee Table R602.3(3) for wood structural panel exterior wall sheathing to wall framing] <br />6d common 2" x 0.113") nail (subfloor, wall)i <br />30 <br />3/8" -1/2" <br />8d common �2-112" x 0.131") nail (roof); or <br />6 <br />12 f <br />RSRS-01 (2-3/8" x 0.113") nail (roof) i <br />8d common nail (2-1/2" x 0.131"); or RSRS-01; <br />31 <br />19/32" -1" <br />(2-3/8" x 0.113") nail (roo0i <br />6 <br />12 f <br />10d common (3" x 0.148") nail; or <br />32 <br />1-118"-1-1/4" <br />8d (2-1/2" x 0.131°') deformed nail <br />6 <br />12 <br />Other wall sheathing 9 <br />33 <br />1/2" structural cellulosic fiberboard <br />1-1/2" galvanized roofing nail, 7/16" head <br />diameter, <br />i wn' or 1-1/4' long 16 ga. staple with 7/16" or <br />3 <br />6 <br />sheathing <br />crown <br />25l32" structural cellulosic <br />1-3/4" galvanized roofing nail, 7/16" head diameter, <br />1-1/2" long 16 7/16" <br />34 <br />fiberboard sheathing <br />g <br />or ga. staple with or <br />1" crown <br />3 <br />6 <br />1-1/2" galvanized roofing nail; <br />35 <br />1/2" gypsum sheathin <br />staple galvanized, <br />1-1/2" long; 11/4" screws, Type Wor S <br />7 <br />7 <br />1-3/4" gle alvanized roofing nail; <br />36 <br />5/8" gypsum sheathin <br />1t5/i <br />7 <br />7 <br />lonlg�1�5/8" screws, Type W or S <br />Wood structural panels, combination subfloor underlayment to framing <br />37 <br />314" and less <br />6d deformed (2" x 0.120") nail; or <br />6 <br />12 <br />8d common 22-1/2" x 0.131°' nail <br />( <br />38 <br />7/8" -1" <br />8d common (2-112" x 0.131 nail; or <br />6 <br />12 <br />8d deformed (2-1/2" x 0.120') nail <br />39 <br />1-1/8"-1-1/4" <br />10d common (3" x 0.148") hail; or <br />6 <br />12 <br />8d deformed (2-1/2" x 0,120") nail <br />a. Nails are smooth -common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall have <br />minimum average bending yield strengths as shown; 80 ksi for shank diameter of 0.192 inch (20d common nail), 90 ksi for shank diameters larger <br />than 0.142 inch but not larger than 0.177 inch, and 100 ksi for shank diameters of 0.142 inch or less. <br />b. Staples are 16 gage wire and have a minimum 7/16-inch on diameter crown width. <br />c. Nails shall be sppaced at not more than 6 inches on center at a0 supports where spans are 48 inches or greater. <br />d. Four -foot by 8-foot or 4-foot by 9-foot panels shall be applied vertically. <br />e. Spacing of fasteners not included in this table shall be cased on Table R602.3(2)). <br />f. For wood structural panel roof sheathingg attached to gable end roof framing and fo intermediate supports within 48 inches of roof edges and ridges, <br />nails shall be spaced at 6 inches on center where the ultimate design wind speed is less than 130 mph and shall be spaced 4 inches on center where <br />the ultimate design wind speed is 130 mpph or reater but less than 140 mph. <br />gg Gypsum sheathing shall conform to ASTM CY396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall conform to ASTM C208. <br />h. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and at floor perimeters <br />only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members and required blocking. Blocking of roof or <br />floor sheathing ppanal edges perpendicular o the framing members need not e provided except as required by other provisions of this code. Floor <br />perimeter shall Lae supported by framing members or soled blocking. <br />i. Where a rafter is fas ened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one side of the rafter and toe <br />nails from the ceiling Joist to top plate in accordance with this schedule. The toe nail on the opposite side of the rafter shall not be required. <br />j. RSRS-01 is a Roof Sheathing Ring Shank nail meeting the specifications in ASTM F1667. <br />Key Design, Inc - 2021 <br />I IIRC R317.11 & IRC R317.1.2 All wood in contact with earth, or wood in conta <br />-r--SW?-- �- - SW -I -- -- -- - I concrete that is in contact with earth, must be pressure treated wood su <br />' - use. Cut ends of treated posts must be re -treated or be provided with pr <br />concrete. <br />�_ <br />�' I-;? �- ;� IRC R317.3.1 Fasteners for pressure treated wood must be of hot -dipped gaiv <br />or copper. Exception: '/2-inch diameter or greater steel bolts. <br />IRC R317.1 Wood joists closer than 18" or wood girders closer than 12" to the <br />f <br />wood or wood of natural resistance to decay. <br />i <br />DESIGN cRrrERla <br />i 5 - SACK CONCRETE = 2500 PSI ��i�l� ��Pa� GRADE40 REAR =fy PSI <br />a r. <br />NOTE: I EQ FLUID PRESSURE ®30LBS/SQ FT <br />6 MIL BLACK VISQUEEN SOIL BRG CAPACITY = 2000LBS/SQ FT <br />VAPOR BARRIER. <br />I <br />S SHALL BE AT LEAST''/z INCH (12.7 mm) IN DIAMETER AND SHALL <br />W-LT66Y1NIMUM OF 7INCHES (178 mm) INTO CONCRETE <br />1TIriTlth/yASHER & NUT TO EA ANCHOR BOLT <br />MIN. OF TWO BOLTS PER PLATE ESCTIION WITH ONE BOLT LOCATED NOT <br />steel, st NE 12 INCHE <br />THE PLATmmES OT IONS THAN SEVEN BOLT DIAMETERS <br />must be of treated <br />MIN LAP SPLICE OF REBAR <br />iii Co <br />! <br />' <br />I' <br />9 <br />i I <br />CONRETE FOOTINGS <br />24"X24"X10" <br />I <br />I = <br />W/ 2 #4 REBAR EA. WAY <br />I <br />�I <br />I <br />UNLESS NOTED OTHERWISE <br />�r <br />I �7 - <br />f- <br />I <br />j. <br />1 <br />_r I <br />I= <br />Rr- <br />4 <br />I -{ <br />{ <br />I <br />f� <br />t < <br />1 <br />It <br />@ <br />r <br />FNDN VENTILATION NOTE: <br />1440 SQ FT DIVIDED BY <br />150 EQUALS 9.6 SQ FT <br />9.6 SQ FT EQUALS <br />20 - 6" X 16" VENTS (72.5 SQ.IN FREE VENT) <br />FOUNDATION VENTS TO BE PLACED <br />IN FOUNDATION WALL - LOCATE IN <br />FIELD TO ALLOW CROSS VENTILATION <br />THROUGHOUT CRAWL SPACE. <br />■ <br />N <br />LL <br />I <br />I ,' r11--- <br />i <br />PT 4x 6 <br />i I <br />PROVIDE 18°' X 24" CRAWL SPACE I <br />r <br />AGG_tS S LOCATE IN FIELD <br />I <br />t"O IRC R403.1.1 Table R401.4.1 DECK FOOTINGS OR PADS. <br />i' <br />DECK CONCR ,TE FOOT GS <br />.x <br />The size offootings i ortin ie and columns shall. be based on the tributary load <br />supporting piers e <br />pP gp Y <br />arid. allowable soil pressure, in accordance with Table R401.4.1. Attached deck <br />4V/(2)#4 REABAR EA. WAY p , <br />foundations shall meet the same frost depth requirements as a residence. (18" below grade) fae <br />i Poats sh 11 be anchored to ensure against uplift an lateral dis Iacem n <br />t,wt <br />4x PT 6 . <br />i <br />a <br />c pp <br />r' <br />I <br />.a <br />I <br />�1 <br />T-- <br />Fill <br />NOTE: <br />ATTACH TO EXISTING <br />I I CONC. " OT FOUNDATION USING � �� FOOTPRINT <br />j CONC. FOOTINGS REBAR STUB DRILLED ' <br />W/(2)#4 REBAR AND EPDXIED INTO <br />EACH WAY EXISTING FOUNDATION <br />-- AT LOACTIONS'TO MATCH <br />HORIZONTAL REBAR IN <br />Tl ADDITION FOUNDATION <br />l Li <br />I_ ( - <br />-- I®®� <br />1c`'N\ <br />... <br />IRC R408.1 6-mil black polyethylene vapor retarder in crawl space. (State Amendment) <br />IRC R408.1 Minimum net area of ventilation openings shall not be less than 1 sq,ft. for each <br />300 sq.ft. of under floor area. (State Amendment) <br />IRC R408.4 Under floor areas must be provided with access. Access openings shall be 18"x 24" if access <br />is through the floor, and 16"x 24" if access is through an exterior wall. If access is through an <br />exterior wall, a space 16 inches wide and 24 inches in depth must be provided in front of the <br />opening. Through -wail openings must not be located under doors into the building. <br />IRC R602.11.1 Anchor bolt washers (3"x3"x1/4" sq. ) hot dipped galvanized if w/ P.T. wood <br />IRC R403.1,5 The top surface of footings must be level. Footings shall be stepped when necessary to <br />change the top surface of a footing or where the bottom surface of a footing exceeds a 10% slope. <br />IRC R403.1.3.2 For slabs -on -grade cast monolithically with a footing, one No.5 or two No. 4 bars <br />must be located in the middle third of the footing depth. <br />th. <br />IRC R403.1.4.2 Interior footings supporting bearing or braced walls and cast monolithically with a slab on <br />grade must extend to a depth of nof less than 12 inches below the top of the slab. <br />IRC R403.1 & Table R403.1 Minimum requirements for foundations and footings: <br />Footings must be a minimum of 6 inches in thickness. When the required width of footings <br />exceeds 17 inches, per table R403.1, the footing must be a minimum of 8 % inches in thickness. <br />IRC R403.1.3 Concrete footings shall have reinforcement located a minimum of 3 inches clear from the <br />bottom of the footing. <br />IRC R403.1.3 In Seismic Design Categories DI and D2, where a construction joint is created between a <br />footing and a stem wall, a minimum of one vertical No. 4 bar must be provided at not more than <br />4 feet on center. The vertical bar must extend to 3 inches clear of the bottom of the footing, have <br />a standard hook and extend a minimum of 14 inches into the stem wall. <br />IRC R403.1.3.1 Footings with stem walls must be provided with a minimum of one horizontal No. 4 rebar <br />in the footing. <br />IRC R403.1.6.1 Foundation plates must be b lted to foundation with not less than 1/2" steel bolts <br />embedded 7" minimum into concrete and spaced not more than 6' apart. There ust be at least <br />two bolts per piece with one bolt located between 3 %2' and 12" from each end of each piece. <br />IRC R403.1.2 Braced wall panels at exterior and interior walls shall be supported by continuous footings. <br />All requiredinterior braced wall panels shall also be supported on continuous footings at intervals <br />not exceeding 50 feet. <br />IRC R40 .1.7 Buildings hall be set back at the bottom of slope by /the height of the sic e but need <br />3 s a e a e <br />not be set backmorethan 15 feet, Buildings shall be setpback at the top of the slope but need <br />not be set back more than 40 feet. Where a geotechnical report has been required and produced, <br />the setbacks shall be as recommended by the geotechnical engineer. <br />IRC R404.1.2 Concrete foundation walls. The IRC has total of 7 different tables dedicated to the rebar <br />C a t <br />re uirements for concrete foundation walls based on wall height, backfill soil class etc. Listed <br />s q <br />below are some common examples of minimum rebar requirements. All walls assume a floor <br />diaphragm at the top of the wall b q <br />IRC R404.1.4 Foundation walls not com I in with the requirements listed above for lain concrete must <br />w ppY gg q P <br />com i with tables R404.1.1(2),R404.1.1 3 R404.1. 4 or the table provided below for vertical <br />tpY b O, 1( ), <br />rein orcement. <br />IRC R405.1 Foundation drains must be installed around foundations that retain earth and enclose <br />habitable or usable space below grade. Tiles, pipes and other approved materials must discharge <br />P <br />b gravity or mechanical means to an approved drainage system. <br />Y g Y PP 9 Y <br />IRC R408.2 Under -floor areas must be ventilated b a r ve mechanical means or openings in <br />a o d <br />Y ppP Y <br />exterior perimeter wall 1 s . for each 1 0 sq. fI. of area). Openings must be located as close to <br />e ft 5 <br />P ( q) <br />P <br />corners as practical arrasge to provide cross ventilationon of 1e st two 0 Call., sides. <br />a d d e sa <br />P g Popposite <br />Vents must be covered with 114" corrosion -resistant wire mesh. <br />IRC R60_9 <br />.11.1 Hot -di ed- alvanized steel la washers a minimum of 3" x 3 x 1/4 must be used on <br />p to <br />each anchor bolt. This requirement applies to both exterior and interior braced walls. <br />IRC R406.1 Foundation walls enclosing basements below finished grade must be damp -proofed. <br />TAR] F 404 1 WI) <br />MAXIMUM UNSUPPORTED MINIMUM HORIZONTAL REINFORCEMENT CONCRETE BASEMENT WALLS a'b <br />HEIGHT OF BASEMENT WALL <br />(feet) <br />SOLID BLOCKING AS 8 OR LESS One #4 bar within 12 inches of the top of the wall story and one #4 bar near mid height of the wall story <br />REQ'D <br />ANCHOR BOLTS W/3" SQ WASHERS ANCHOR BOLTS tN13" SQ WASHERS <br />PER IRC R403.1.6.1 " �! "1�' ��1 ;1 r `/ MORE THAN 8 One #4 bar within 12 inches of the top of the wall story and one #4 bar near third points of the wall story <br />PER IRC R403.1.6.1 <br />PER HORIZONTAL <br />R 04R 21NFORCEMENT �, PBR IRC R 04REINFORCEMENT <br />For S1: 1 foot=304.8mm; 1 inch=25.4ni 1 pound per square inch = 6.895 kPa. <br />a. Horizontal reinforcement requirements are for reinforcing bars with a min. yield strength of 40,000 psi, and concrete with a min. specified compressive strenth of <br />SUPPORT BEAM PER PLAN 2500 psi and vertical reinforcement being located in the center of the wall <br />z0 ® m b. See Section R404.1.2.2 for minimum reinforcement required for basement walls supporting above -grade concrete walls. <br />X1 <br />FINISH GRADE � FINISH GRADE <br />- ] -2X CLEAT (EACH SIDE) r- <br />-- ----- OR IMPSON ACZ 0 <br />m <br />S <br />\ PRESSURE TREATED SUPPORT POST - - <br />J <br />U <br />�-/����OR ELEVATED MIN. 8" ABOVE EARTH J <br />VERTICAL REINFORCEMENT ¢ ¢ <br />ON MIN. 90# ROOFING. PROVIDE POSITIVE VERTICAL REINFORCEMENT a <br />AS PER TABLE '� I F <br />REBBR',AS ES,?`D _ �� � -�- CONNECTION TO FOOTING. AS PER REBARAS_REQ'.D -� <br />BY IRC ' �1}#4 MIN. BY_�RC �11#4MIN. <br />PER`PLAl41 �T <br />---L-K�-_,-ILBA- - POLY M. VAPOR BARRIER BARRIER <br />_ <br />ceo _ <br />REBAR PER PLAN <br />8" <br />6 <br />6" FOUNDATION WALL I <br />O S <br />4 1/2" M 4 1/2" MIN. PER PLAN 3 1/2" MI 3 1/2" MIN. <br />PERMITTED IF MAXIMUM <br />17" MIN, 13" MIN. WALL HEIGHT DOES NOT <br />nPTA I I EXCEED 4' 6". <br />WHILE KEY DESIGN, INC. HAS MADE EFFORT TO ENSURE THE ACCURACY <br />LENF2®IFLPTEIBUESPROVIDED BY <br />CLIENT FROMDRAWINGS <br />INC HILDRLLKAND <br />VERIFY ALL DIMENSIONS & COMPLIANCE TO APPLICABLE CODES PRIOR <br />TO CONSTRUCTION. <br />2X CLEAT WITH (5) 10d NAILS SIMPSON ACZ FOR POST <br />BEAM & POST TO BEAM CONNECTION <br />DETAIL <br />POST/SEAM CONNECTION <br />USING 2X CLEAT <br />1/211 = 1' Q" <br />INSTALL PER MANUF. SPEC'S <br />�IMPSON A23 ATTACHED TO POST <br />USING84, 0 048" X 1-112" NAILS & <br />I FO ING USING (4 RAMSET 1-1/4" <br />l..f PINS OR TRAPCON SCREWS I" MIN, <br />4 EMBEDMENT <br />DETAIL <br />POST CONNECTIONS <br />W/SIMPSON HARDWARE <br />1 /2r' = 1' ®" <br />DETAIL <br />TYP. FOUNDATION <br />WITH CRAWL SPACE <br />AT MUDROOM <br />1/21e = 11 Oil <br />FLOOR TIES / I=ICLD®WNS <br />MARK <br />STRAP <br />NAILING <br />HOLDOWN <br />STL <br />ANCHORAGE <br />B N <br />ANCHOR HGR �OLTS <br />STHD <br />STHD <br />STHD8RJ <br />(24) 16d <br />sinkers <br />NIA <br />1 Locate Holdownat each end of shearwall. 3 Extend foundation as required for holdown A.B. embedment. <br />2� Cripple wall construct same as shearwall above. 43 Threaded rod and coupler as required. <br />SHEARWALL SCHEDULE <br />SILL PLATE <br />MARK <br />SHEATHING <br />NAILING' <br />SHEAR FLOW NAILING <br />ANCHORS <br />EDGES FIELD <br />BASE PLATE TOE NAIL RIM <br />BLOCKED <br />JOIST OR TOP <br />SVV1 <br />7116" OSB <br />8d @ 8d @ <br />16d <br />16d @ <br />112" OAnchor Bolt <br />1 side <br />6" o.c. 12" o.c. <br />8" 0.c. <br />5" o.c. <br />@ 48" o.c, & @ ends <br />SW2 <br />7116" OSB <br />8d @ 8d @ <br />16d @Simpson <br />LPT4 @ <br />112" oAnchor Bolt <br />1 side <br />4" o.c. 12" o.c. <br />5" o.c, <br />19" o.c. <br />@ 32" o.c. & @ ends <br />Use common nails for all nailing. <br />�Anchor bolt washers must be 3 x 3" x 0.229" thick. <br />) Framing members receiving edge nailin from abutting panels shall not be less than a single 3-inch nominal member or (2) 2x 6 HF#2 <br />stitched together with (2) rows of 16d 7" o.c. staggered. <br />10-12-21 <br />West Coast Structural Engineering Inc. <br />9540 Semiahni Parkway #137, Blaine, WA 98230 <br />STRUCTURAL REVIEW <br />i THIS DRAWING HAS BEEN <br />REVIEWED FOR STRUCTURAL. <br />0 REQUIREMENTS ONLY PER <br />THE ATTACHED <br />CALCULATIONS. <br />PROJECT NO: W4700 <br />