Laserfiche WebLink
10,1119= <br />1 • Mul <br />r i <br />SHEAR WALL <br />PER PLAN <br />SIMPSON HDU HOLDOWN <br />w/ FASTENER TO WOOD <br />PER HOLDOWN SCHEDULE <br />ADDITIONAL HOLDOWN <br />PER PLAN <br />(E) P.T. SILL, UPSIZE TO 3x <br />PER S.W. SCHEDULE, <br />ATTACHMENT PER <br />SCHEDULE - -� <br />FIELD VFY. (E) <br />STEM WALL HT. <br />(E) CONT. FTG. <br />II <br />II <br />II <br />II <br />II <br />11 <br />II <br />I <br />I <br />II <br />II <br />II <br />i <br />f <br />t <br />{ <br />p�� 3 <br />E I E t• I M s <br />COMPRESSION STUDS/POST <br />PER HOLDOWN SCHEDULE, NAIL <br />MULTIPLE HOLDOWN STUDS w/ <br />(2)10d @ 6"oc <br />FOR CRAWL SPACE FRAMING <br />CONDITION, ADD DOUBLE 2x <br />BLKG. DIRECTLY BELOW <br />HOLDOWN STUD <br />- FRAMING CONT. BEYOND <br />WHERE OCCURS <br />- EPDXY ANCHOR PER <br />SCHEDULE <br />T.O. (E) STEM WALL <br />T.O. (E) CONT_ FTG. <br />NOTE: <br />UPGRADE (E) STUD WALL FRAMING <br />TO DOUBLE 2x STUD FOR SHEAR <br />WALL WITH PANEL SHEATHING ON <br />BOTH SIDE, SEE SHEAR WALL <br />SCHEDULE, NAIL (N) 2x STUD TO (E) <br />STUD w/ (2)10d @ 6"oc <br />w^I <br />I I <br />1 I <br />TYPICAL EDGE NAILING <br />SEE NOTE BELOW, 3/8" <br />TO EDGE OF PLYWOOD <br />MIN. <br />, <br />! <br />I �\ <br />l <br />SHEET & SUPPORT <br />I ( <br />i <br />i 4 <br />TYPICAL INTERMEDIATE: <br />NAILING PER SCHEDULE77 <br />STAGGER PLYWOOD JOINTS <br />�e I <br />FLOOR/ROOF <br />JOIST PER PLAN <br />HOLD ADDITIONAL #4 x <br />6-0" EACH SIDE OF <br />ANCHOR, BEND AROUND, <br />CONNER AS REQUIRED - <br />STEM WALL, <br />THICKNESS PER PLAN <br />CONT. FTG., <br />SIZE PER PLAN <br />� a 4 <br />a <br />1111 <br />6ti< <br />4 <br />" <br />-° <br />U <br />� MIN. <br />T.O. STEM( WALL <br />IV <br />T.O. CONT_ FTG, <br />` MINIMUM FOOTING SIZE <br />AROUND ANCHOR PER <br />HOLDOWN SCHEDULE <br />THICKEN FTG. AS REQUIRED AT <br />ANCHOR TO ACHIEVE REQUIRED <br />EMBED DEPTH INTO CONT. FTG., <br />SEE HOLDOWN SCHEDULE <br />4 <br />i + <br />PANEL EDGE NAILING <br />(2) 2x TOP PLATE U.N.O. TO TOP PLATE <br />2x STUDS @ 16"oc, <br />7-_v®__I-f_-__--Fl-.-----�---•- PANEL EDGE NAILING <br />I I I i I I I I I•° TYP. U.N.O. TO END BTU® <br />I I I I I I I I I°: <br />EDGE NAILING <br />@ I I I I I I I• I I°. <br />ADJOINING PANEL <br />EDGE I I I I I I i•I PLYWOOD PANEL <br />I I I I I I ( I SHEATHING PER SW <br />SCHEDULE <br />I I I I I• I I <br />II II II I;I l <br />1 1 I I I I I•I PANEL FIELD NAILING TO <br />I I I•.I I ( ('I I INTERMEDIATE STUD <br />1 1 `•I I I i:l I <br />2x BLOCKING w/ EDGE _®� -® _1---__---1•I-®®® ®� <br />NAILING, TYP., USE 3x <br />WHEN NOTED ON I (` •I I I I( I <br />SCHEDULE II II II II I NOTE: <br />! I I I I I I I I NAILING TO BE 3/8" MIN. <br />i TO EDGE OF SUPPORTS & <br />SHEETS <br />2x P.T. SILL PLATE <br />FINISHED FLOOR LINE <br />SILL PLATE <br />ANCHOR BOLT, <br />SEE SCHEDULE - <br />NOTE:) <br />ALL ENDS OF PLYWOOD SHEETS <br />TO SPLICE OVER CENTERLINE 1 <br />JOISTS O:. SUPPORTING <br />a <br />MEMBERS, BLOCK PANELS <br />LESS THAN 12" IN WIDTH <br />NAIL SPACING @ <br />NAIL SPACING <br />ZONE <br />CONTINUOUS <br />INTERMEDIATE <br />STIFFENERS <br />EDGES <br />SUPPORT <br />0.148"0 @ 6"ocAT <br />SUPPORTED EDGES <br />0,131"0 @ 12"oc <br />UNBLOCKED, U.N.O. <br />0.148" O @ 4"oc AT <br />SUPPORTED EDGES <br />0.131"0 @ 12"oc <br />BLOCKED, w/ 2x FLAT BLOCKS AT <br />UNSUPPORTED PANEL EDGES <br />0.148" O @ 2"oc AT <br />SUPPORTED EDGES <br />0.131" O @ 12"oc <br />BLOCKED, w/ 2x FLAT BLOCKS AT <br />UNSUPPORTED PANEL EDGES <br />ROOF NAILING NOTE: <br />1. ALL NAILS SHALL BE 10d COMMON (0.148" 0) w/ 1-1/2" MIN. PENETRATION INTO FRAMING. <br />2. ALL NAILS TO BE FLUSH DRIVEN & SHALL NOT FRACTURE PLYWOOD SURFACE. <br />3. PROVIDE 3/8" MIN. CLEARANCE BETWEEN NAIL CENTERLINE AND PANEL EDGE, <br />4. PROVIDE 2 ROWS 10d @ 4"oc EA. ROW AT EXTERIOR DIAPHRAGM BOUNDARIES, (BLDG. PERIMETER) TYP. (U.N.O.) <br />5. AT STEEL STRAP TIE LOCATIONS, NAIL ALL HOLES vv/ 1-1/2" MIN. PENETRATION INTO SAWN LUMBER FRAMING. <br />DO NOT USE 10d x 1-1/2" NAILS AS SPECIFIED IN SUPPLIER LITERATURE. <br />II II II II <br />II II II II <br />II II II II <br />II II II IP <br />II it II II <br />II II II II <br />+ it II II II <br />it II II II <br />® I _-®---i ®I-L ®®__-Li-_® <br />PER DETAILS PER <br />SCHEDULE <br />d <br />d a <br />Q .a <br />d <br />G <br />d <br />a <br />a <br />4 <br />a <br />a. <br />d <br />a. <br />TYPICAL WALL FRAMING <br />S CTION <br />N.T.S. <br />(2) 2x STUD FOR <br />SINGLE STRAP, (5) 2x <br />STUD FOR DOUBLE <br />STRAP, SEE S.W. <br />HOLDOWN SCHEDULE <br />CONT. LSL <br />RIM JOIST ----\ <br />JOIST PER <br />PLAN BEYOND II II <br />INI <br />III <br />ADD (2) 2x VERT. <br />BLKG. FOR SINGLE <br />STRAP, (5) 2x BLKG. <br />FOR DOUBLE STRAP <br />PLYWOOD <br />WALL <br />SHEATHING <br />NOT SHOWN <br />SIMPSON HD <br />HOLDOWN <br />FASTENER TO WOOD <br />PER S.W. HOLDOWN <br />SCHEDULE <br />MINIMUM WOOD <br />MEMBER ABOVE AND <br />BELOW LEVEL, SIZE <br />PER S.W. HOLDOWN <br />SCHEDULE <br />©®©®® <br />m <br />o <br />--- <br />A307 BOLT PER S.W. <br />HOLDOWN SCHEDULE <br />'IP <br />�Id <br />11 � <br />1 � IP <br />I did <br />I �► 9 <br />1 11 II <br />INIII1111 <br />II II II 11 II <br />NO <br />ADD (3) 2x VERT. <br />BLKG., WHEN FLOOR <br />JOIST LINEUP w/ <br />HOLDOWN POST, <br />SANDWICH JOIST w/ <br />(2) 2x VERT. BLKG. <br />AND NAIL TOGETHER <br />w/ (6)16d <br />MARK <br />(NOTE 4) <br />FASTENERS TO WOOD (NOTE 1,3,5) <br />ANCHOR <br />-- <br />REQUIRED FASTENER <br />TO WOOD <br />MINIMUM WOOD <br />MEMBER SIZE <br />MSTC28 <br />(16) 16d SINKERS <br />(2)2x STUDS <br />-- <br />MSTC40 <br />(32) 16d SINKERS <br />(2)2x STUDS <br />MSTC52 <br />-MSTC66 <br />(48) 16d SINKERS <br />(68) 16d SINKERS <br />(2)2x STUDS <br />(2)2x STUDS <br />- <br />- <br />MST72 <br />(62) 16d <br />(2)2x STUDS <br />- <br />CMST12 x 84" <br />(74) 16d <br />(2)2x STUDS <br />a <br />- HD12 <br />(4) 1" DIA. A307 BOLTS <br />(3) 2x STUDS <br />1"0 A307 BOLT <br />HD12 (SPELL.) <br />(4) 1" DIA. A307 BOLTS <br />4x6 POST @ 2x4 WALL <br />6x6 POST @ 2x6 WALL <br />1"0 A307 BOLT <br />HD19 <br />(5) 1 DIA. A307 BOLTS <br />4x3 POST @ 2x4 WALL <br />6x6 POST @ 2x6 WALL <br />1-1/8"O A307 (BOLT <br />HD19 (SPELL.) <br />(5) 1" DIA. A307 BOLTS <br />4x3 POST (7a 2x4 WALL <br />6x6 POST @ 2x6 WALL <br />1-1/4"0 A307 BOLT <br />n J I I I �� _ I I <br />SHEAR WALL FRAMING HOLDOWN NOTE: <br />NOTE: - <br />FOR HOLDOWN ABOVE OPENING, WRAP 1. MINIMUM WOOD MEMBER SIZE ABOVE AND BELOW WHERE OCCURS AT FLOOR LEVEL. DO <br />STRAP AROUND BEAWHEADER AND NOT USE LAG BOLTS TO FASTEN HOLDOWNS TO WOOD MEMBERS. <br />CONNECT w/ REQUIRED FASTENER. FOR 2. HOLDOWN SCHEDULE IS PROVIDED FOR GENERAL INSTALLATION INFORMATION. NOT ALL <br />HD HOLDOWN, PROVIDE THRU BOLT TO OF HARDWARE SCHEDULED IS REQUIRED, SEE PLANS FOR HOLDOWN CALL -OUTS AND <br />BEAWHEADER w/ 3"x3"x1/4" SQ. WASHER LOCATIONS. CONSULT MANUFACTURER FOR ADDITIONAL INFORMATION. <br />3. QUANTITY OF NAILS FOR STRAPS ARE EVENLY DIVIDED BETWEEN ENDS OF STRAPS ABOVE <br />AND BELOW THE DEPTH OF THE FLOOR SYSTEM. USE 16d COMMON NAILS, U.N.O. <br />SHEAR WALL FRAMING HOLDOWN 4. FOR 2X STRAP CALL®® UT ON PLAN, USE () DOUBLE STRAP TIES AND PROVIDE 5 2x STUDS <br />S <br />- -- 5. IF SHEAR WALL REQUIRES 3x STUDS PER SHEAR WALL SCHEDULE, USE 3x INSTEAD OF 2x <br />NOTED ON HOLDOWN SCHEDULE. <br />s�a HOLDOWN <br />SHEAR <br />WALL <br />FOUNDATION <br />ANCHOR TO CONCRETE <br />HOLDOWN TO WOOD POST (NOTE 2,4) <br />MARK <br />REQUIRED HD. <br />REQUIRED ANCHOR <br />A307 BOTTOM DBL. NUT <br />MINIMUM EMBEDMENT DEPTH <br />MINIMUM (N) FOOTING <br />SIZE AROUND ANCHOR <br />FASTENER TO POST <br />POST (2x4 WALL) <br />- <br />POST (2x6 WALL) <br />(NOTE 1) <br />PLATE WASHER <br />(NOTE 5) <br />(NOTE 7) <br />STHD10 <br />a <br />10" FROM T.O. STEM WALL <br />- <br />--- <br />(18)16d <br />(2)2x4 STUDS <br />(2)2x6 STUDS <br />STHD14 <br />e <br />- <br />14" FROM T.O. STEM WALL <br />_ <br />(22)16d <br />(2)2x4 STUDS <br />(2)2x6 STUDS <br />18" FROM T.O. STEM WALL / <br />HDU4 <br />SB 5/3x24 OR 5/3"0 A307 <br />1-3/4" SQ. x 1/2" <br />9" FROM T.O. (E) STEM WALL* <br />-- <br />(10)1/4"x2-1/2" SIDS <br />(2)2x4 STUDS <br />(2)2x6 STUDS <br />- <br />18" FROM T.O. STEM WALL / <br />HDU5 <br />SB 5/8x24 OR 5/8"0 A307 <br />1-3/4" SQ. x 1/2" <br />10" FROM T.O. (E) STEM WALL' <br />e <br />(14)1/4"x2-1/2" SIDS <br />(2)2x4 STUDS <br />(2)2x6 STUDS <br />13" FROM T.O. STEM WALL / <br />HDU3 <br />SB 7/8x24 OR 7/8"0 A307 <br />1-3/4" SQ. x 1/2" <br />12" FROM T.O. (E) STEM WALL* <br />_ <br />(20)1/4"x2-1/2" SIDS <br />4x4 POST <br />(3) 2x6 STUDS <br />HDU11 <br />PAB8 OR V'0 A307 <br />2-3/4" SO. x 5/3" <br />11" FROM T.O. CONT. FTG. <br />33" x 33" <br />(30)1/4"x2-1/2" SIDS <br />4x6 POST <br />6x6 POST <br />HDU14 <br />PAB8 OR 1"0 A307 <br />2-3/4" Sty. x 5/3" <br />11" FROM T.O. CONT. FTG. <br />33" x 33" <br />(36)1/4"x2-1/2" SIDS <br />4x6 POST <br />4x6 POST <br />HD12 <br />u <br />PAB8 OR 1 � A307 <br />n n <br />2=3/4 S . x 513 <br />Q <br />} <br />11 FROM T.O. CONT. FTG. <br />u n <br />33 x 33 <br />n <br />4 1 DIA. A307 (BOLTS <br />() <br />(3)2x4 STUDS <br />() <br />3 2x6 STUDS <br />( ) <br />HDU14 (SPECL.) <br />PAB8 OR 1"0 A307 <br />2-3/4" SQ. x 5/3" <br />11" FROM T.O. CONT. FTG. <br />33" x 33" <br />(36)1/4"x2-1/2" SIDS <br />4x6 POST <br />6x6 POST <br />HD12 (SPECL.) <br />PAB9 OR 1-1/3"0 A307 <br />3-1/4" SQ. x 5/3" <br />13" FROM T.O. CONT. FTG. <br />33" x 33" <br />(4) 1"DIA. A307 BOLTS <br />4x3 POST <br />6x6 POST <br />HD19 <br />PAB9 OR 1-1/8"0 A307 <br />1/4" SO. x 518" <br />13" FROM T.O. CONT. FTG. <br />38" x 38" <br />(5) 1" ILIA. A307 BOLTS <br />4x6 POST <br />6x6 POST <br />HD19 (SPECL.) <br />PAB9 OR 1-1/8"0 A307 <br />_3 <br />3-1/4" SO. x 5/8" <br />13" FROM T.O. CONT. FTG. <br />38" x 33" <br />(5) 1" ILIA. A307 BOLTS <br />4x3 POST <br />6x6 POST <br />SHEAR WALL FOUNDATION HOLDOWN NOTE: <br />1. SIMPSON SB AND PAB CAN BE SUBSTITUTED WITH ASTM A307 HEADED ANCHOR BOLT w/ BOTTOM DOUBLE NUT AND PLATE WASHER PER SCHEDULE <br />2. MINIMUM WOOD MEMBER SIZE ABOVE AND BELOW WHERE OCCURS AT FLOOR LEVEL. ACCEPTABLE TO SUBSTITUTE 2x BUILT-UP POST THAT MATCHES REQUIRED <br />POST DEPTH. DO NOT USE LAG BOLTS TO FASTEN HOLDOWNS TO WOOD MEMBERS. <br />3. HOLDOWN SCHEDULE IS PROVIDED FOR GENERAL INSTALLATION INFORMATION. NOT ALL OF HARDWARE SCHEDULED IS REQUIRED, SEE PLANS FOR HOLDOWN <br />CALL -OUTS AND LOCATIONS. CONSULT MANUFACTURER FOR ADDITIONAL INFORMATION. <br />4. FOR SHEAR WALL REQUIRES 3x STUDS PER SHEAR WALL SCHEDULE, USE 3x INSTEAD OF 2x NOTED ON HOLDOWN SCHEDULE. <br />5. FOR ANCHORS CONNECTING TO EXISTING CONCRETE, DENOTED WITH (`), USE SIMPSON SET-XP EPDXY, EMBED DEPTH PER SCHEDULE. NUMBER OF REQUIRED <br />HOLDOWN PER PLAN. <br />6. CAST ENLARGED FOOTING AROUND ANCHOR MONOLITHICALLY WITH CONT. FOOTING, MINIMUM FOOTING SIZE AROUND ANCHOR PER SCHEDULE, THICKEN <br />FOOTING DEPTH TO ACHIEVE MINIMUM EMBEDMENT DEPTH PER SCHEDULE, SEE DETAIL ON THIS SHEET. <br />7. PROVIDE #4 @ 6"oc EA. WAY BOTTOM FOR FOOTING AROUND HOLDOWN ANCHOR. <br />SHEAR WALL SCHEDULE (DOUG FIR OR HEM FIR LUMBER PER GENERAL NOTES) <br />APA RATED SHEATHING (NOTE 1,2,4,12,13) <br />SILL PLATE ATTACHMENT TO CONCRETE <br />(PRESSURE -TREATED) <br />DOUG-FIR <br />HEM -FIR <br />RIM JOIST OR BOARD <br />WALL BOTTOM PLATE <br />SHEAR <br />SHEAR <br />5/8" 0 x 7" ANCHOR <br />ARK <br />WALL STUD AND EDGE BLKG. <br />CONNECTION TO <br />CONNECTION TO <br />CAPACITY <br />CAPACITY <br />APPLICATION <br />EDGE 8d NAIL SPACING <br />(NOTE 3,6,14) <br />WALL TOP PL OR SILL PL <br />RIM JOIST OR BOARD <br />BOLT SPACING <br />SILL PLATE SIZE <br />(PLF) <br />(PLF) <br />(NOTE <br />(NOTE 4,5) <br />(NOTE 7,8) <br />(NOTE 8,9) <br />(NOTE 10,15) <br />(NOTE 11) <br />W3 <br />ONE SIDE <br />0.131" x 2 1/2" @ 3"oc <br />2x <br />CLIP @ 11"oc <br />0.148"x3 1/4" @ 3"oc <br />21"oc <br />2x <br />490 <br />455 <br />W4 <br />ONE SIDE <br />0.131" x 2 1/2" @ 4"oc <br />2x <br />CLIP @ 14"oc <br />0.143"x3 1/4" @ 4"oc <br />28"oc <br />2x <br />380 <br />353 <br />W6 <br />ONE SIDE <br />0.131" x 2 1/2" @ 6"oc <br />2x <br />CLIP @ 20"oc <br />0.148"x3 1/4" @ 6"oc <br />40"oc <br />2x <br />260 <br />242 <br />BOTH SIDE <br />0.131" x 2 1/2" @ 2"oc STAGGERED <br />3x <br />3- CLIPS @ 12"oe <br />3- CLIPS @ 12"oc <br />10"oc <br />3x <br />1280 <br />1190 <br />2\N2 <br />2W3 <br />BOTH SIDE <br />0.131" x 2 1/2" @ 3"oc STAGGERED <br />3x <br />2- CLIPS @ 11"oc <br />2- CLIPS @ 11"oc <br />12"oc <br />3x <br />980 <br />912 <br />2W4 <br />BOTH BIDE <br />0.131'° x 2 1/2" @ 4"oc <br />3x <br />2- CLIPS @ 14"oc <br />2- CLIPS @ 14"oc <br />18"oc <br />3x <br />760 <br />706 <br />2W6 <br />BOTH SIDE <br />0.131" x 2 1/2" @ 6"oc <br />3x <br />2- CLIPS @ 20"oe <br />2- CLIPS @ 20"oe <br />21"oc <br />3x <br />520 <br />484 <br />SHEAR WALL NOTES: <br />10. <br />ANCHOR BOLTS SHALL BE PROVIDED WITH 3"x3"x1/4 PLATE WASHERS. FOR ANCHOR IN EXISTING FOUNDATION, EMBED <br />ANCHOR BOLT 7" INTO CONCRETE WITH SIMPSON SET-XP EPDXY; EMBED ANCHOR BOLT 7" INTO CMU WITH SIMPSON SET <br />1. <br />INSTALL PANELS EITHER HORIZONTALLY OR VERTICALLY FOR ENTIRE LENGTH SHOWN ON PLANS. <br />EPDXY, FIELD VERIFY CMU CELLS ARE SOLID GROUTED. <br />2. <br />WHERE SHEATHING IS APPLIED ON BOTH SIDES OF WALL, PANEL EDGE JOINTS ON 2x FRAMING SHALL BE STAGGERED <br />11. <br />PRESSURE PRESERVATIVE TREATED WOOD CAN CAUSE EXCESSIVE CORROSION AND DEGRADATION OF FASTENERS. <br />SO THAT JOINTS ON OPPOSITE SIDES ARE NOT LOCATED ON THE SAME STUDS. <br />PROVIDE HOT DIPPED GALVANIZED NAILS AND CONNECTOR PLATES FOR ALL CONNECTORS IN CONTACT WITH <br />3. <br />BLOCKING IS REQUIRED AT ALL PANEL EDGES, <br />PRESERVATIVE TREATED FRAMING MEMBERS. <br />4. <br />PROVIDE SHEAR WALL SHEATHING AND NAILING FOR THE ENTIRE LENGTH OF THE WALLS INDICATED ON THE PLANS. <br />12. <br />DETAIL ALL EXTERIOR WALL TO BE W6 PER SCHEDULE, U.N.O. ON PLAN. <br />ENDS OF FULL HEIGHT WALLS ARE DESIGNATED BY EXTERIOR OF THE (BUILDING, CORRIDORS, WINDOWS, OR <br />DOORWAYS OR AS DESIGNATED ON THE PLANS. SEE PLANS FOR HOLDOWN REQUIREMENTS. ALTERNATE WALLS <br />ALTERNATE NOTES; <br />^--- <br />DESIGNATED AS PERFORATED SHEAR WALLS REQUIRE SHEATHING ABOVE AND BELOW ALL OPENINGS. <br />5. <br />SHEATHING EDGE NAILING IS REQUIRED AT ALL HOLDOWN POSTS. EDGE NAILING MAY ALSO BE REQUIRED TO EACH <br />13. <br />7/16" APA RATED SHEATHING (OSB) MAY BE USED IN LIEU OF 15/32" SHEATHING PROVIDED THAT ALL STUDS ARE SPACED <br />STUD USED IN BUILT-UP HOLDOWN POSTS. REFER TO THE HOLDOWN DETAILS FOR ADDITIONAL INFORMATION. <br />16"oc AND ENGINEER OF RECORD HAS BEEN NOTIFIED IN WRITING AND APPROVES. <br />6. <br />INTERMEDIATE FRAMING TO BE WITH 2x MINIMUM MEMBERS. FIELD NAILING SHALL BE AT 12"oc MAX. <br />14. <br />WHERE WOOD SHEATHING IS APPLIED OVER GYPSUM WALL BOARD SHEATHING (GWB), CONTACT ENGINEER OF RECORD <br />7. <br />USE 0.131x1-1/2" LONG NAILS TO ATTACH FRAMING CLIPS DIRECTLY TO FRAMING. USE 0.131x2-1/2" NAILS WHEN CLIPS <br />FOR APPROVAL AND ALTERNATE FASTENING REQUIREMENTS. <br />ARE INSTALLED OVER SHEATHING. <br />15. <br />AT ADJOINING PANEL EDGES, (2) 2x STUDS NAILED TOGETHER MAY BE USED IN LIEU OF A SINGLE 3x STUD. DOUBLE 2X <br />8. <br />FRAMING CLIPS ARE EITHER A35 ANGLE OR LTP4 (AT EXTERIOR FACE OF WALL SHEATHING), OR APPROVED EQUIVALENT. <br />STUDS MAY BE CONNECTED TOGETHER WITH 3" NAILS OF THE SAME SPACING AND DIAMETER AS THE PLATE NAILING. <br />9, <br />WHERE PLATE ATTACHMENT SPECIFIES 2- ROWS OF NAILS, PROVIDE DOUBLE JOIST, RIM, OR EQUAL. ATTACH PER <br />16. <br />CONTACT ENGINEER OF RECORD FOR ADHESIVE OR EXPANSION BOLT ALTERNATIVES TO CAST -IN -PLACE ANCHOR <br />DETAILS <br />BOLTS. TYPICALLY SET ADHESIVE WILL BE ALLOWED AS AN ALTERNATE. <br />17. <br />ALL ANCHOR BOLTS SHALL HAVE PLATE WASHER 3"x3"x1/4". PLATE WASHERS TO BE SLOTTED SO WASHERS IS WITHIN <br />b <br />x t <br />- <br />I <br />4 <br />a <br />., <br />q <br /><s <br />co <br />Lu <br />1 <br />I <br />w <br />_..ffi. <br />ao " <br />4 <br />