Laserfiche WebLink
A <br />2NT <br />SHEARWALL ELEVATION <br />POST PER PLAN/HOLDOWN <br />R PLAN <br />HOEDOWN PER <br />x - <br />A <br />m <br />DOUBLE TOP PLATE W/ EDGE NAILING <br />2-2x MIN <br />SCHEDULE ( ) <br />(STAGGER) <br />Lockhart <br />B <br />SHEARWALL EDGE NAILING AT ALL <br />PANEL EDGES. BLOCKING AT ALL PANEL <br />s ;; �.: <br />� �. � <br />EDGES WHERE APPLICABLE. <br />WEB STIFFENER INSTALLED <br />ANCHOR BOLT PER. <br />� �r <br />SNUG FOR I JOISTS: NO <br />HOEDOWN SCHEDULE <br />, <br />C <br />EDGE NAILING TO HOEDOWN POST <br />STIFFENERS REQ'D FOR <br />SOLID SAWN. PLACE <br />8811 9ihi Puce \Ale °t <br />POST/STUD PER. <br />2x6 <br />EVCCO�,]., WA 98204 <br />t <br />(FULL HEIGHT) STAGGER INTO <br />PLAN/SCHEDULE/Z-BOTTOM <br />SQUASH BLOCK EA SIDE OF <br />PLATE PER <br />DOUBLE STUDS <br />JOIST. WHERE HD DOES NOT <br />SHEARWALL SCHEDULE <br />LINE UP OVER JOIST USE <br />> <br />®� <br />Owner: <br />D <br />STUDS AT 16" ON CENTER <br />HOLDOWN PER PLAN <br />SQUASH BLOCK EQUAL TO <br />E <br />RIM JOIST PER PLAN. 1y <br />WIDTH OF HD POST ABOVE <br />Lockh r t Family <br />Lockhart <br />4x MIN). <br />( ) <br />MIN WIDTH AT <br />E <br />PRESSURE TREATED SILL PLATE <br />SHEARWALLS. <br />WITH EDGE NAILING AND ANCHOR <br />BOLTS PER SHEARWALL SCHEDULE. <br />PRESSURE TREATED <br />PRESSURE TREATED <br />SILL PLATE PER <br />SILL PLATE PER <br />F <br />TOP PLATE SPLICE NAILING TO BE <br />SHEARWALL SCHEDULE: <br />SHEARWALL SCHEDULE. <br />_ <br />(12) 10d COMMONS (MIN). LAP 48' <br />MINIMUM. CENTER SPLICE ON <br />'' <br /><. " STEM WALL AND <br />STUD: <br />VERTICAL BAR PER <br />ANCHOR BOLT PER <br />F: <br />1 ! <br />FOOTING PER PLAN. <br />FOUNDATION <br />DETAILS <br />, <br />HOEDOWN SCHEDULE., <br />a SEE NOTE '4' FOR POST <br />W Z <br />ua <br />., <br />FOR HHDQ11, HHDQ14, <br />4 <.t AND HD15Arch <br />��' ig <br />G <br />HOLDOWN PER SCHEDULE AND <br />WITH <br />J <br />_ <br />dry <br />PLAN <br />STANDARD HOOK <br />INSTALLED OPTION <br />w <br />CONNECTIONS <br />�Oi i7iCCS,LLC <br />TO FOOTING <br />REFERENCE THE <br />.Ja <br />WITHIN 4" OF EACH <br />HOEDOWN SCHEDULE <br />PO Box 82581, <br />H <br />COORDINATE ALL STUD AND PLATE <br />SIDE OF ANCHOR <br />FOR FOOTING <br />e 0 <br />KCi�fTiCi r a3 <br />SIZES w/ SHEARWALL SCHEDULE <br />BOLT, TYPICAL <br />REQUIREMENTS) <br />REQUIREMENTS <br />NEW/EXISTING STEM <br />—PLAN/DETAILS. <br />W:www.j3arCiii` ectsi�lC.,,O"r°i <br />J <br />EDGE NAILING TO POSTS, TRIM... <br />WALL AND FOOTING PER <br />STUDS, AND KING STUDS <br />_s <br />It <br />p:�®� -12-9296 <br />K <br />BEARING STUD FOR HEADER <br />Str- `jai ct u'.f a Y E i L g i <W zC(!' e 'A : <br />SLAB/STEMWALL <br />AT RIM <br />JOIST <br />Nabii i' usalwHPE <br />ves, <br />(�,f�,%r�sq i"iOnly) <br />2 T""T/P <br />BOXTED HOLDOWN <br />1 ®1 <br />1ko'- <br />(I\ U Sal e <br />I. �\ OF J// y <br />4 <br />SHEARWALL SCHEDULE <br />T,. <br />SILL PLATE MATERIAL AND 1 <br />SHEARWALL SHEATHING FASTENER TYPE PANEL EDGE PANEL FIELD BOTTOM PLATE SIZE ALLOWABLE CAPACITY ALLOWABLE CAPACITY <br />e ANCHOR BOLT SIZE AND SPACING HOEDOWN POST PER 46136 <br />MARK MATERIAL AND SIZE NAILING NAILING AND CONNECTION FOR SEISMIC LOADS FOR WIND LOADS �� ��> <br />(MIN EMBED 7") PLAN/ SCHEDULE �R <br />_.. PT 2x SILL PLATE w/ ®®e �� <br />2x BOTTOM PLATE w/ 16d AT <br />STRAP PER PLAN S NAL <br />G Jrl > 6" O.C. 310 PLF 435 PLF o i <br />/2 0 AB @ 36 O.C. 6 O.C. INTO RIM JOIST/BLOCKING a 8/3i7121 <br />- 10d COMMON PT 2x SILL PLATE w/ B ®® ----- <br />2X BOTTOM PLATE w/ 16d AT © 2021 NKH Engineering <br />SV,I-4 ie �� OSB OR 4" O.G. 460 PLF 645 PLF <br />Y32 NAIL 1.1/2 MIN Y" AB 28" O.C. 4 O.C. INTO RIM JOIST/BLOCKING ®® These drawin sarethepro property ofNKHEngineering and <br />( @ H®LDOWN POST/STUDS 9 P p Y <br />PLYWOOD ° ° are not to be used or reproduced in any mannor without <br />PENETRATION 12 O.C: <br />PER PLAN / SCHEDULE START NAILS 14'UP F <br />SHEATHING INTO FRAMING FIT 3x SILL PLATE W/ 3x BOTTOM PLATE w/ 16d AT FROM BOTTOM OF prior written permission. <br />� W-3 <br />°° <br />ONE FACE MEMBERS) 3„ O.C. 600 PLF 840 PLF ------ <br />�" i� AB @ 2(�" O.C. 4' O.C. INTO RIM JOIST/BLOCKING STUD, 21" MIN OF <br />�r HOLDOWN STRAP PER NAILED LENGTH ON Revisions:_ PT 3X SILL PLATE w/ 3x BOTTOM PLATE w/ (2) ROWS OF <br />^ „ PLAN. CENTER BETWEEN <br />„ SIMPSON 6 SDW SCREWS AT 770 PLF 1077 PLF (14) 10d IN FACE OF POST [(38) 10d MIN] <br />... O AB @ 14 O.C. <br />o° FLOORS BEAM, (4) 10d IN TOP ®® r �s <br />6 O.C. INTO RIM JOIST AND BLOCKING Revision 101"i I-.��I.10 J <br />OF BEAM ° <br />1 8/30/21 <br />SHEARWALL NOTES <br />o ° <br />1. ALL STUDS, UDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE DOUG-FIR NO. 2 UNLESS NOTED OTHERWISE ON PLANS: ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER FRAMING SEE NOTE ##3 : <br />2. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL SHEATHING MUST EXTEND TO THE OUTSIDE EDGE OF ALL HOEDOWN POSTS AND CORNERS AND TO THE INSIDE <br />' ° 16d NAILS FROM KING °' <br />EDGE OF FRAMING AROUND OPENINGS. CLEAR SPAN 5 (� ° (14) 10d IN FACE OF <br />NO NAILS STUD TO HEADER/BEAM BEAM 4 10d IN <br />REQUIRED BOTTOM OF BEAM <br />3. WHERE fCL SHEATHING NAILING IS SHEARWALL TYPE SW 3 AND GREATER ALL FRAMING MEMBERS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT B LE THAN SINGLE 3-INCH NOMINAL i <br />_. - _. HAL O E SS A A S G NC O <br />MEMBER. ADDITIONALLY, - MATCHING STRAP EACH HEADER/BEAM PER PLAN <br />A ITIONALLY, WHERE SHEARWALLS ARE SHEATHED ON BOTH FACES, ALL STUDS AND PLATES RECEIVING EDGE NAILING FROM BOTH FACES MUST BE A SINGLE 3-INCH NOMINAL_ MEMBER OR ; o <br />o ° END OF HEADER/BEAM. <br />PANEL JOINTS S MUST BE OFFSET. (2)2x MAYBE SUBSTITUTED FOR A SINGLE 3x MEMBER PROVIDED THE STUDS ARE STITCH NAILED TOGETHER w/ 10d NAILS STAGGERED AT 6" O.C. FROM EACH SIDE. ° ° (114DEEP MINIMUM <br />START NAILS 1y" DOWN��..R,� <br />MSTC66B3, 94MIN @ MSTC48B3) <br />° ° FROM TOP OF STUD 21" <br />L - n O° (1) 2x KING STUD w/ 16d ° <br />4. Sa-IE/lRV\A°...� NAILING CRITERIA IS BASED ON i ABLE 4.2A OF THE AF�PA SPECIAL DESIGN. PROVISIONS FOR WIND AND SEISMIC. VALUES ARE BASED ON OSB OR PLYWOOD SHEATHING w/ DOUG FIR N0. 2 ° „ ° ® MIN OF NAILED LENGTH ON <br />8 O.C. TO TRIM STUD FRAMING AND COMMON NAILS: FPOST [(38) 'I Od MIN]LOOR FRAMING PER ° ° <br />o° PLAN e ` <br />5. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. REFER TO THE TRIM STUD/POST PER PLAN/SCHEDULE, <br />, ., _.E 2 2x MINIMUM. SEE PLAN FOR ANY <br />APPROPRi I E DETAILS AND/OR HOEDOWN SCHEDULE FOR ADDITIONAL INFORMATION REGARDING ANCHOR B B ()Permit OLTS, EM EMBEDMENT LENGTH, ETC. WHERE (2) 2x s ARE .USED AS A HOEDOWN POST, SHEARWALL HOEDOWN POST/STUDS ��� ¢��a <br />HOEDOWN REQUIREMENTS AT BASE <br />EDGE NAILING MUST BE STAGGERED INTO EACH MEMBER OF THE POST. PER PLAN/SCHEDULE <br />6. ANCHOR BOLTS MUST BE EMBEDDED A MINIMUM OF 7" INTO CONCRETE OR GROUTED CMU AND SHALL BE PLACED TO PROVIDE A " MINIMUM OF 2 COVER. PROVIDE 3 COVER FOR CONCRETE CAST 3 TYP FLR TO F-ILR STRAP 4 STRAP HD BEAMMEADER Issue Date: August 30th, 2021 <br />AGAINST SOIL_ <br />2 1n 1`® ro <br />° <br />7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTi KWIK BOLTS/SIMPSON TITEN HD BOLTS OF THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE SUBSTITUTED FOR Drawn By: Aid <br />ANCI FOR BOLTS INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A MINIMUM OF 3X" INTO EXISTING CONCRETE. Il ed By: r ;s aH1 <br />HOLDOWN SCHEDULE HOLDOWN <br />WN NOTES <br />8, ALL. NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR BORITE TREATED WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST CORROSION: <br />HOEDOWN THREADED EMBED MIN EDGE MINIMUM <br />TOTAL FASTENERS CAPACITY REMARKS Sheet Name- <br />0, WIRE STAPLES MAY BE SUBSTITUTED FOR NAILS IN SHEAR PANELS. MARK ROD SIZE INTO CONCRETE DISTANCE POST SIZE 1. ALL -THREAD BOLTS SHALL CONFORM TO ASTM A307. <br />LTT „ 2 2x 8 10d x 1� <br />19 � >� 10 2y O O � 1310# SEE DET 2/S2 ,$. ,�� � s_,. <br />_.S_ —. P. m -2" • .-_.__._ _._._ :.. , u ei N ,� ii .+ �'1 .a^sa to-..:�x <br />10. NAILSI�aiuS a �E STAGGERED WHEN SPACED AT � O/C.-- - _._ _ - 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH (f c) SHALL BE 2500 PSI. MINIMUM WALL THICKNESS IS 8 , U.N.O. ON �`�° <br />a n „ „ PLAN OR DETAILS: <br />HDU4 0 0 12 3 (2) 2x (10) SDS Y x 4565# SEE DET 2/S2 !, -' ' f <br />11. PROVIDE , . MINIMUM 01= 3 x 3 ,. 0.229 PLATE WASHERS AT ALL ANCHOR BOLTS. THE EDGE OF THE PLATE WASHER MUST BE LOCATED NO MORE THAN Y2FROM THE INSIDE FACE OF THE SHEARWALL , <br />„ 3. ALL HOLDOWNS REQUIRE A (2)2x POST UNLESS NOTED OTHERWISE.. WHERE HOLDOWNS ARE INSTALLED INTO THE <br />SHEATHING. FOR SHEARWALLS SHEATHED ON BOTH FACES, SQUARE PLATE WASHERS SHALL HAVE A MINIMUM SQUARE DIMENSION OF SILL PLATE WIDTH MINUS 14.5 x 4.5 x 0.229 WASHER FOR _ -,: <br />(E.G.( WIDE FACE OF THE STUD, STUDS MUST BE STITCH NAILED TOGETHER w/ 16d SINKERS STAGGERED AT 4" O.C. ' .- � � 1 � <br />3x6 SILL PLATE.) �i <br />- 4:-FOR POST INSTALLED CONDITIONS, THREADED ROD MAY BE PLACED IN SIMPSON SET-XP OR HILTI HY-150 EPDXY, <br />UNO. <br />5. MINIMUM EDGE DISTANCE IS FOR FORMED CONCRETE EXPOSED TO WEATHER OR SOIL. FOR CONCRETE CAST Sheet: <br />- - AGAINST SOIL PROVIDE 3" CLEAR TO ANCHOR BOLT. <br />6. NAILS/SCREWS TO HOEDOWN POST SHALL BE PER MANUFACTURER'S SPECIFICATIONS. <br />7. WHEN FIELD CONDITION BECOME LESS THAN MINIMUM SHOWN, CONTACT ENGINEER PRIOR TO PROCEEDING,' <br />nil i s <br />E V <br />8. ALL HOLDOWN BOLTS MUST BE RE -TIGHTENED JUST PRIOR TO ENCLOSING SECOND SIDE OF -' WALL:;' - . . <br />ERB, <br />REVIEWED <br />FOR <br />PE <br />RMIT <br />`� E I.. <br />- - ®h =4 � � <br />