Laserfiche WebLink
a. . <br />14— BA <br />-,�jTYYHP DEVELOPMENT LENGTHS FOR REINFORCEMENT <br />@00AL-MRIUMM <br />111110 Hill <br />am <br />_. <br />e <br />PLASH <br />NG <br />PER J REIN I PER <br />0 PERFORATMPER <br />PLAN\_FR`ElN'F'0R'CING <br />PER <br />RPE. CENTER IN aqE CUBIC <br />PLAN/SCHEDULEPIPE <br />CENTER IN CNE CUBIC <br />PLAN/SCHEDULE <br />FOOT OF FREE DRAtNiNG <br />FOOT OF FREE DRAINING <br />GRAVEL A ®IAJN TO <br />GRAVEL AND ®RAIN TO <br />APPROVED <br />PI® <br />*BREAKEA ALL SHEATHING 0 BOTTOM OF SILL PLATE <br />CILLA <br />EXT. ALL�qgNDAT90N C0NECTB0N (LATERAL ONLY <br />r LL V <br />PEAK SHEATHING ON PLATE A <br />SHOWN. SEE N07E FOR ALTERNATE. <br />FLU T L CONNECTION <br />BREAK SHEATHING <br />ON PLATE A <br />HOWNSEE N07E <br />FOR ALTERNATE. <br />SHEARWALL PER PLAN <br />DIAPHRAGM EDGE NMLING INTO Rq.M JCNST (10d 0 <br />aI ) <br />' o/ ) <br />SHEARWALL EDGE NkUNG <br />16d NAIL EACH BLOCK (USE SDSYZx4X' PE <br />PUS LE) <br />FOR 3x BOTTOM PLATES) <br />LTP4 FROM BOTTOM <br />2 SAYSOF JOIST BLOCK:N ' o/C wl <br />PLATE TO R�M MST P <br />(3)10d NAILS 9NTO EACH BLOC <br />SCHEDULE (AT <br />ONLY)SHEARWALL <br />LPT4 FROM RIM MST <br />TO TOP PLATE PER—\ <br />SCHEDULE(A <br />SHEARWALL ONLY) <br />SHEARWALL EDGE NA UNG <br />FLOOR FRAMING PER (PLAN (I -MST <br />(WERE APPLICABLE) <br />SHOW SCUD SA � P) <br />SHEARWALL PER PLAN <br />RAM JOIST (MINIMUM) <br />(MERE SPECtRED) <br />FROM BLOCKING TO TOP PLATE <br />INE <br />A �UP <br />pi <br />LOPET <br />SCHEDULE <br />® <br />N <br />sq <br />e <br />n <br />00 <br />4-1 <br />to <br />e <br />Cn <br />Li <br />LLJ <br />CL <br />Lij <br />Li <br />L <br />x _ CIQ <br />eve <br />u <br />U <br />0 <br />i— <br />fl 017r <br />NOV 1 7 2021 <br />Drawn By. ORL <br />Checked By: CCC <br />Date: 11-1 —20 1 <br />