Laserfiche WebLink
MN <br />3r DOWEL TO MATCH VERT <br />21" <br />Ri <br />x <br />FE <br />T. KEY <br />aj v <br />11, E AF +. <br />WALL:REINFORCING FOR <br />PIT <br />O/C EACH WAY (TYP) <br />,a s <br />a <br />FOUNDATIONNEW <br />RV2a <br />11©1 —2021 <br />SECURE ELEVATOR <br />RAILS AT FLOOR <br />FRAMING TO RESIST <br />S® <br />LATERAL LOADS. <br />GIB SUPPORTED <br />GRAVITY LADS <br />�y <br />4 ®®gym <br />2x FLAT BLOCKING <br />BETWEEN TRUSS P <br />CHORDS <br />TRUSSES PER <br />PLAN <br />CONNECT <br />®� <br />ELEVATOR <br />AT TOP <br />PLATE <br />VERTICAL <br />BETWEENTOP AND <br />BREAD SHEATHING <br />BOTTOM BLOCKING <br />AT TRUSS. LTP4 <br />EACH SIDE OF <br />FROM TOP PLATE <br />TRUSS. TYPICAL. <br />TO BOTTOMCORD <br />BOTTOM CHORD <br />BLOCKING AT <br />SPACING PER <br />BLOCKING <br />SMEAR ALL <br />DOUBLE TOP PLATE <br />ULE <br />SCHEDULE <br />SHEARWALL <br />NAILING AND <br />SHEATHING PER <br />PLAN/SCHEDULE. <br />EXTEND TO ROOF <br />DIAPHRAGM. <br />CONNECT <br />LEATC <br />AT FL <br />FRAMING <br />CONNECT <br />ELEVATORJ <br />AT FLOOR <br />FRAMING <br />TYPICAL ELEVATOR RAIL <br />CONNECTION <br />®� <br />I y <br />y9 <br />T <br />I <br />qq�� <br />n"-' <br />"�s <br />®`.cam. <br />Cq <br />- <br />q <br />o <br />Q <br />� � <br />tl' <br />-- <br />Lo <br />uj <br />a_ <br />Lij <br />6 <br />tu <br />m <br />CY t vejY*�F y <br />Nov <br />