Laserfiche WebLink
aar' <br /> EVERETT <br /> DiRECTiONS)Reed the triVAC section below to determine if pan review ly required or not reguireet:.Then select-Me box next to ia(to <br /> toll City Staff if plan review is not requited end widest the box next to the specific reason trent liNAG 296-45B-90ill it plan review is <br /> 'required,select the box next to(b)and(c)to acknowledge that plan review is required and the tilectrical plane have provided <br /> with tine permit app'i ticra°i„ <br /> If beet( )4ii,iii,or v)is selected,the wora must also comply' i h section 5 h-4vIt a See arrow flow chart below, <br /> (3)Electrical plan review, <br /> ri (a)Electrical plan review in tmt regq,tr t for: <br /> (i(Low voltage systems; <br /> (II)Lighting specific prolects that result in an electrical road redar orton each feeder anal.,:< xt to the oject; <br /> di})Heeling and coaling specific retrofit projects-Mar recite in err eteofrlcei kr •r• toga sin,each eating feeder <br /> •involved in the project,provided there is net a corresponding afrcreaser in the Mec e fetid raiment in anyfitiedistr, <br /> (iv)Stand-atone utilityfed services that do not exceed 250 volts, t(l amperes where the arojecradatitributtori system <br /> CI does not include <br /> ( (EmerEmergency systems other than listed unit equipment per NEC 700,12(5); <br /> ( t An escalator electrical system defined in NEC517.2,or <br /> (C)A required fine pump system <br /> Modilicsttonc to exteting etedtriciel irraletiattorrs wtaere oil of the following conditions we met <br /> (A)Service or distribution equipment involved is rated riot more than 400 amperes and does riot exceed <br /> 250 volts or for righting circuits not exceedexceeMng 277 volts to nuuntf <br /> t -t Does riot involve emergency systems other than listed erne equipment per NEC 700,t ( )s <br /> (C)Does not involve branch circuits or feeder€a of art essential erectrucel system as defined tra NEC 5.17,2 <br /> and <br /> (fit)Service or feeder load calculations am increased by 5 or less. <br /> _ (vi5 it ctoc power production seur`cet4(such as solar photovoltaic,fuel(tell,or wind elect!E.sy�stem(sl with atotal <br /> > rating of 9600 watts or less, <br /> ., ( ii)For installations in(a (ii(,(di),and(a)of this subSectifin to Considered,the elbowing must be available <br /> ,..i to the etsctrtcet inspector before the work is initiated. <br /> (A)A deer and adequate description of file project's scope; <br /> ( (A load oaicutatierr(atr <br /> (C)'Allot the:rod changes are,,providing both:before arid alter panel schedules as needed and <br /> (ta)Provide information.snowing that the service and feeder(s)suptarying the panef{sj abate the work is <br /> latrine place has-adequate capacity for any increased load and nes code compliant overourrerrit protection <br /> far that supply. <br /> O_LE,1 Electrical plan review is riot required for'Medical,dental, and chiropractic clinic"er which le a clinic or <br /> F" physaciane'office wrote patients are not regularly Sept as bed patients for twenty-four hours or€ M per section <br /> s <br /> (t}(op'gxii). <br /> (b)Electrical plan review is mounted for all other new or altered electrical projects in educational. institutional.of health care <br /> Lirst occupancies defined inn this chapter. <br /> (c)4t a reetu w'di rec1urred,the eiectrrcer plan must ea submittimi for review and approval before the electrical work is begun. <br /> Ya-9 ten Table'lia.b,a <br /> 6�=sezxaia ar•-0( itanal.r' 2 43i9' 1 ' 4 g c oe ovioi'a4NN,ar sta r r Minn <br /> 64e>m1nh Pr o>Wrx�*rt l i a,» e tii'.:J 'r^8415 k< x •a -- `" '`" .•».,." ",_ <br /> Typo <br /> �riddeationerithefitutterteit,dt Nan renew <br /> r crier r4fsttt t yps n Pitt Grad <br /> r <br /> sinewtoUW. 1+rn mcd. <br /> #t <br /> qd CAT at orrent do eiriciigag <br /> Riebui.et, titui ridnn in <br /> O 'a=... <br /> .. 2 - <br /> d <br /> PERMIT pep 2-Reis Review <br /> ::a•,' ., <br />