My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5420 GLENWOOD AVE 2022-04-28
>
Address Records
>
GLENWOOD AVE
>
5420
>
5420 GLENWOOD AVE 2022-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:45:06 AM
Creation date
4/28/2022 10:44:12 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
5420
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 of 26 <br /> A PROJECT NO. SHEET NO. <br /> S210827-2XR <br /> 1"4"..m.�k PROJECT 5420 GLENWOOD AVE, EVERETT WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY FY DATE 08/31/2021 <br /> Scope/Objective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These <br /> findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the <br /> existing structure above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations <br /> based upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included <br /> in the structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings.The interior crawl-space <br /> support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support <br /> posts, adjustable post-base hardware, and/or the addition of taller wood support members. Settlement in these interior support <br /> areas shall be monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous CMU stem wall and concrete strip footings. Below the footings, piles are to <br /> be spaced at a distance no larger than 6'-0"on-center at the locations indicated on the attached Level Survey. Piles to be installed <br /> per SSK-01. Supplemental L6x6x3/8 shall also be installed at the indicated locations in accordance with SSK-02. <br /> - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance as per plan. <br /> -A maximum allowable loading of 2,190 plf was utilized in this analysis. This was determined through inspection of building <br /> geometry and conservative span/tributary loading assumptions based on standard construction practices <br /> - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and <br /> equipment assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Helical Piles(Typical)@ 6'-0" Max 14.0 kip minimum vertical capacity(allowable load) <br /> Note: Refer to the attached General Notes for additional requirements. <br /> - As determined by R&R,the site appears to have no lateral (horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed <br /> or expected additional structural analysis will be required. <br /> Structural recommendations contained in this package are based on site photographs, dated March 9,2021, provided by R&R.To <br /> the knowledge of L120,a geotechnical investigation was not performed on this site. Consequently, all structural recommendations <br /> assume adequate soil conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by, may conflict with,or otherwise compromise the <br /> recommendations contained within this package, including, but not limited to,water drainage, slope stability, existing structural <br /> damage,or existing subsurface obstructions. In this instance,the structural assumptions, recommendations, and scope for this <br /> project will need to be revisited to consider and address the new findings <br /> Refer to the following pages for pile and connection specifications. <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.