My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7414 HEATHER WAY 2022-04-28
>
Address Records
>
HEATHER WAY
>
7414
>
7414 HEATHER WAY 2022-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 1:14:40 PM
Creation date
4/28/2022 1:14:38 PM
Metadata
Fields
Template:
Address Document
Street Name
HEATHER WAY
Street Number
7414
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/6/2022 Page 1 <br /> City of Everett <br /> 7:03:43AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2201-108 Site Address 7414 HEATHER WAY <br /> Applied 1/17/2022 Applicant SEATOWN ELECTRIC(ELEC)CORP Lot <br /> Approved 1/18/2022 Owner WALKER JAREN/WALKER EDISON R JR&ROBIN Block <br /> Issued 1/18/2022 Contractor SEATOWN ELECTRIC(ELEC)CORP Tract <br /> Parent Permit No. Description Partial Rewire of Circuits,Power to Outbuilding <br /> Notes Kitchen,Bathroom and Exterior Circuits <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 2/28/2022 2/28/2022 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 2/24/2022 1:57 PM SEATOWN <br /> Request ELECTRIC(ELEC)CORP <br /> (360)551-1776 <br /> Contact Name:Riley Curtis-Stroder <br /> Site Address:7414 HEATHER WAY <br /> Phone:3605511776 <br /> e-Mail:permits@seatownservices.com <br /> (2/28/2022 1:23 PM SKB) <br /> Lights and outside receptacle can't be on <br /> with the 2 small appliance circuits in the <br /> kitchen.Outside front receptacle should be <br /> GFCI protected.Living room and living <br /> room receptacle should be AFCI protected. <br /> Not sure about second kitchen. <br /> 2/28/2022 2/28/2022 ELEC 02-GROUND SKB APPROVAL (2/28/2022 1:23 PM SKB) <br /> WORK House to shed. <br /> 4/5/2022 4/5/2022 ELEC 09-FINAL SKB APPRVD-PERK as noted 4/1/2022 9:51 AM SEATOWN <br /> ELECTRIC(ELEC)CORP <br /> Contact Name:Riley Curtis-Stroder <br /> Site Address:7414 HEATHER WAY <br /> Phone:3605511776 <br /> e-Mail:permits@seatownservices.com <br /> (4/5/2022 1:14 PM SKB) <br /> Second kitchen status unresolved. <br /> INSP12 <br /> SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.