Laserfiche WebLink
ORDINANCE NO. 3331 <br /> AN ORDINANCE providing for the construction of a trunk <br /> sewer to sewage the south portion of the City of Everett by <br /> extension of the existing present trunk sewer located at and near <br /> the south line of Memorial Stadium and by the construction of <br /> lateral sewers in connection therewith, describing the route <br /> along which such improvement is to be constructed, describing <br /> lateral sewer locations, acquiring any necessary right-of-way, <br /> establishing and fixing the boundary of the district to be assess <br /> ed for such improvement, adopting the maps, plans and specifi- <br /> cations as prepared by the engineer of the City of Everett for <br /> such improvement, all in accordance with Resolution No. 5511 of <br /> the City of Everett, creating a local improvement district fund, <br /> providing for the payment of such improvement by special assess- <br /> ment under mode of payment by bonds, and providing for the sale <br /> of said bonds by the City of Everett. <br /> WHEREAS, by Resolution No. 5511, the City of Everett <br /> has declared its intention to order the improvement as herein <br /> outlined and by doing all work in connection therewith necessary <br /> to make a complete improvement, all in accordance with the maps, <br /> plans and specifications prepared by the engineer of the City of <br /> Everett, and <br /> WHEREAS, a hearing has been duly held as required by <br /> law, <br /> WHEREAS, the City Council has, by unanimous vote, held <br /> the improvement to be necessary for the public health and has <br /> ordered the same, and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That a trunk sewer be constructed over and <br /> along the following described route: <br /> Beginning at the existing manhole near the south boundary <br /> of Everett Memorial Stadium, th southwesterly through an <br /> easement across private property to the north end of the <br /> existing 30" concrete culvert across 41st St. at a point <br /> approx. 250 ft. east of the center line of Wetmore Ave. , <br /> th through the existing culvert to the south end of cul- <br /> vert; th through an easement across private property and <br /> following the approx. course of the existing stream to <br /> 43rd St. and Wetmore Ave. , being more particularly des- <br /> cribed as follows: <br /> Beginning at the monument at 39th St. and Broadway; th <br /> angle left 83° 37' 22" from the monument line between 38th <br /> and 39th Sts. on Broadway for 181.25 ft. ; th angle left <br /> 25° 43' 08" for 571.63 ft. to the existing manhole near <br /> the south line of Memorial Stadium and the T.P.O.B. of <br /> this description; th angle left 37° 39' 44" for 777.29 ft; <br /> th angle left 210 27' for 38.20 ft. to an angle point on <br /> the existing 30" culvert pipe across 41st St. ; th angle <br /> left 4° 56' on the center line of said 30" culvert pipe <br /> for 239.13 ft. ; th angle left 30° 32' for 379.96 ft. ; th <br /> on the arc of a curve to the right tangent to the last <br /> described course, consuming a central angle of 69° 25' for <br /> 104. 95 ft. ; th on a line tangent to the last described <br /> point on said curve for 181.09 fta; th angle left 25° 10' <br /> for 160. 16 ft. ; th angle right 50 22 ' 30" for 182.84 ft. <br /> to 43rd St. and Wetmore Ave. <br /> and that branch and lateral sewers be constructed along the follow <br /> ing described lines: <br />