Laserfiche WebLink
Drew Martin <br /> From: Drew Martin <br /> Sent: Friday, November 12, 2021 12:29 PM <br /> To: 'slightedgepainting@gmail.com' <br /> Subject: City of Everett Permit Services: 5505 Wetmore Avenue (B2110-046) - First Building <br /> Intake Review <br /> Attachments: B2110-046_Unpermitted Work.pdf; 2018 IRC_Typical Code References_04-12-2021.docx; <br /> CoE_Residential Drawing Preparation_Edited 09-27-2021.pdf <br /> Hello, Taylor. <br /> Your application has been received and a permit set up. However,the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Information is attached to provide guidance. Construction-level documents should be submitted for <br /> review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br /> intended to provide a comprehensive review. The resubmittal documents should include an itemized <br /> response letter clarifying how the review comments below have been addressed. Depending on your <br /> experience with the adopted codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> Intake Review Comments: <br /> General: <br /> 1. The project should specify the applicable building codes, including but not limited to the 2018 IRC, <br /> 2018 WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br /> 2. The submitted documents include sketches for the proposed project. Construction-level drawings <br /> prepared using established drafting standards are required to substantiate compliance with the <br /> IRC. The drawings should include plans, building sections, details, material specifications, design loads, <br /> architectural and structural notes, etc. as needed to clearly show the proposed work. The current <br /> editions of the building codes applicable to the project should be specified. See IRC Section R106.1.1. <br /> 3. The construction drawings should include all levels of the house. Detailed construction information is <br /> not required for areas that are not included in the proposed scope-of-work. At a minimum, the plans <br /> should show the walls, doors, egress routes, windows including egress windows, smoke and CO alarms, <br /> and use of each room. See IRC Section R106.1.1. <br /> 4. The submitted drawings appear to include prior unpermitted work, including but not limited to the <br /> main living areas on the upper and lower floors. See the photos in the attached document. The <br /> drawings should be revised to show all previous unpermitted work as new work; all new work is <br /> required to comply with the current code requirements. See IRC Sections R102.7.1, R105.1, and <br /> R113.1. <br /> 115 <br />