My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7310 2ND DR SE 2022-08-29
>
Address Records
>
2ND DR SE
>
7310
>
7310 2ND DR SE 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 7:39:45 AM
Creation date
4/29/2022 9:16:28 AM
Metadata
Fields
Template:
Address Document
Street Name
2ND DR SE
Street Number
7310
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/11/2022 Page <br /> City of Everett <br /> 7:00:07AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2110-026 Site Address 7310 2ND DR SE <br /> Applied 10/25/2021 Applicant David kinyanjui Lot <br /> Approved 10/26/2021 Owner DAVID KINYANJUI Block <br /> Issued 10/28/2021 Contractor OWNER Tract <br /> Parent Permit No. B2010-066 Description Adding a shower in extg Bathroon,Moving Washer and Dryer <br /> Notes Adding a shower in existing Bathroon,Moving Washer and Dryer to next room <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 11/22/2021 11/22/2021 PLUMB JJM CORRECTION (11/22/2021 3:30 PM JJM) <br /> 03-ROUGH IN -Vent take off for shower needs to be rolled <br /> up above the centerline of the drain pipe per <br /> code. <br /> -This will require a separate shower pan <br /> test as well before tile is set. <br /> 11/22/2021 11/22/2021 PLUMB 07-FINAL JJM CORRECTION VOIDED(JJM 11/17/2021 7:13 PM David Thiongo <br /> 11/22/2021) <br /> Contact Name:DAVID KINYANJUI <br /> Site Address:7310 2nd DR SE <br /> Phone: 1206458131 <br /> e-Mail:dtkinyan@gmail.com <br /> (11/22/2021 11:40 AM JJM) <br /> -Vent take off for shower needs to be rolled <br /> up above the centerline of the drain pipe per <br /> code. <br /> -This will require a separate shower pan <br /> test as well before tile is set. <br /> 12/1/2021 12/1/2021 PLUMB 07-FINAL JJM NO ACCESS eTRAKiT Inspection 11/23/2021 2:15 PM David Thiongo <br /> Request <br /> Contact Name:David Thiongo <br /> Site Address:7310 2ND DR SE <br /> Phone:2067249084 <br /> e-Mail:thiongoj@outlook.com <br /> (12/1/2021 10:11 AM JJM) <br /> -No one home for access,10:15AM. <br /> Should be scheduled as rough in inspection. <br /> 12/2/2021 12/2/2021 PLUMB JJM CORRECTION (12/2/2021 2:52 PM JJM) <br /> 03-ROUGH IN -Vent for shower still not rolled above <br /> centerline of drain per code.At a minimum <br /> install a 2"vent to accomodate for the <br /> inabilty to roll the vent up all the way.Can <br /> transition back to 11/2"above the floor. <br /> 12/3/2021 12/3/2021 PLUMB JJM APPROVAL 11/23/2021 2:15 PM David Thiongo <br /> 03-ROUGH IN <br /> Contact Name:David Thiongo <br /> Site Address:7310 2ND DR SE <br /> Phone:2067249084 <br /> e-Mail:thiongoj@outlook.com <br /> (12/3/2021 2:45 PM JJM) <br /> -Groundwork ok to cover. <br /> 3/10/2022 3/10/2022 PLUMB 07-FINAL JJM APPRVD-PERK eTRAKiT Inspection 3/9/2022 7:31 PM David Thiongo <br /> Request <br /> Contact Name:David Thiongo <br /> Site Address:7310 2ND DR SE <br /> Phone:2067249084 <br /> e-Mail:thiongoj@outlook.com <br /> INSP12 C, ` STEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.