My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8220 5TH AVE W 2022-04-29
>
Address Records
>
5TH AVE W
>
8220
>
8220 5TH AVE W 2022-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 9:31:20 AM
Creation date
4/29/2022 9:31:09 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH AVE W
Street Number
8220
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC VORKS PERMIT Irate Applied: 5/5/2021 <br /> City of Everett Permit Services Public orks Permit#: PW2105-007 <br /> EVERETT 3200 Cedar Street, 2 Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> AT&T CORP/SIENNA ENGINEERING GROUP AT&T CORP/SIENNA ENGINEERING GROUP <br /> 11241 WILLOWS RD NE,STE 130 11241 WILLOWS RD NE,STE 130 <br /> REDMOND,WA,98052 REDMOND,WA,98052 <br /> PHONE:4258969850 PHONE:4258969850 <br /> TAX PARCEL ID#: SITE ADDRESS:8220 5TH AVE W <br /> DESCRIPTION: POTHOLE BURIED AT&T LINE ACROSS SR526 ALONG THE WEST SIDE OF <br /> HARDESON RD. INVESTIGATING POTENTIAL CONFLICT FOR WSDOT SEISMIC RETROFIT. UP TO 4 POTHOLES ANTICIPATED BUT NOT ALL 4 <br /> MAY BE NEEDED. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 06/07/2021.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and the direction of the PW Inspector. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 10. No conduit installation allowed under this permit.This permit approved for potholing only. <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items <br /> have been completed. <br /> Public Works Permit Fee Breakdown: eau 1 <br /> Paving(100SF) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 JUN U 7 2021 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> n and all claims for damages,costs,expenses,or causes of action that <br /> /etne poveadoa 06/0712021 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.