Laserfiche WebLink
.. GENERAL STRUCTURAL NOTES ABBREVIATIONS SPECIAL INSPECTIONS SCHEDULE TMUR . <br /> �'. .▪ `,`< <br /> DESIGN CRITERIA HELICAL PILES AB ANCHOR BOLT FTG FOOTING <br /> CODE:2018 SRC/SBC&AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL ABV ABOVE GA GAUGE SPECIAL INSPECTIONS TABLES PER THE 2018 IBC.ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN s <br /> ROOF 25 PSF SNOW(GROUND) BUILDING CODE(IBC). AFF ABOVE FINISH FLOOR GALV GALVANIZED MARKED WITH A".ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN'X', ., /oy▪At v-11. <br /> FLOORS 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING,INC.,AND SHALL BE ALT ALTERNATE GLB GLULAM BEAM TABLE 1705.3 .,~ <br /> RESIDENTIAL 40 PSF IN ACCORDANCE WITH ESR-3750. ALUM ALUMINUM GR GRADE REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION <br /> BALCONY/DECK 60 PSF 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. APPROX APPROXIMATE GYP GYPSUM WALL BOARD <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE AYC ALASKAN YELLOW CEDAR HDG HOT-DIPPED GALVANIZED CONTINUOUS PERIODIC SPECIAL REFERENCED IBC <br /> SPECIAL . <br /> GENERAL CONDITIONS CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA) BB BOX BEAM HDR HEADER TYPE INSPECTION INSPECTION STANDARD' REFERENCE <br /> 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL COATINGS(AC228). BE BOTTOM FLUSH HE HEM FIR 1.Inspect reNforcement,Including prestressing <br /> tendons,and very placement. - - ACI 318 Ch.20,252, <br /> 25.3.26,5.1-26.5.3 190e 4 <br /> ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE BLDG BUILDING HGT HEIGHT 2 Reinforcing bar welding: <br /> 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE BLKG BLOCKING HT HEIGHT a.Verify weldable),of reinforcing bars - - <br /> REINFORCING STEEL,BUILDING STRUCTURAL STEEL,OR ANY OTHER METAL BUILDING COMPONENTS PER other than ASTM A 706: AWS D1.4 <br /> STARTING WORK,THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY AC358 SECTION 3.9. BM BEAM IN INCH b.Inspect single-pass inlet welds.maximum AG 318-:26.5.4 <br /> DISCREPANCIES. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. EDT BOTTOM IT JOINT sr a',and <br /> 3. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. BP BOTTOM PLATE MAX MAXIMUM c.Inspect all other welds. - - <br /> • <br /> BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF BRG BEARING MIN MINIMUM 3.4.Ins anchors <br /> anchors cast In concrete. - - AG 318:17.8.2 - 't 1 <br /> pest arors past-Installed in hardened w <br /> PROCEEDING WITH ANY WORK SO INVOLVED. INCLINATION OF-4-1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. BTWN BETWEEN MISC MISCELLANEOUS concrete members' Q z <br /> BSMT BASEMENT a.Adhesive anchors Installed ln horizontally } c7 <br /> 4. IN CASE OF CONFLICT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION.PROVIDE TORQUE MONITORING DEVICE AS PART OF NB NON-BEARING or upwardly Inclined orientations to resist - - ACI 318.17.8.2.4 - r <br /> B/W BOTTOM OF WALL sustained lesson loads. <br /> PRECEDENCE OVER THE"GENERAL NOTES"AND/OR"STANDARD DETAILS". THE INSTALLING UNIT.MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE . NO NUMBER b.Mechanical anchors and adhesive anchors Z o <br /> CANT CANTILEVER not defined in 4.a m <br /> 5. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK,THE CONSTRUCTION SHALL BE THE AT SPECIFIC DEPTHS. OC ON CENTERLLl 17 <br /> 0 CONTROL JOINT 5.Verly use of required aesgn ma. ACI 318:Cl 19. 1904.1.1904.2, Z <br /> SAME AS FOR SIMILAR WORK. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE CLG. CEILING PSF POUNDS PER SQUARE FOOT - - 26Aa.26.4 4- 1908.2,1908.3 <br /> 6. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS PSI POUNDS PER SQUARE INCH 6.on sloe concrete placement rabrkafe specimens ASTM C 172 "� 9 <br /> Q for strength tests,perform slump and air <br /> CLI CEILING JOIST - - ASTM c31 1908.10 ZUJ W <br /> DRAWINGS. THAN TWO(2).THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL PT PRESSURE TREATED content tests,and determine the temperature a AG 318.26.4.5,2612 C7 <br /> CLR CLEAR the concrete. Z Z <br /> 7. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. RAF RAFTER 7.Inspect concrete and shotcrete placement for ACI 318:26.d.5 1908.6.1908.7, O O UI <br /> CMU CONCRETE MASONRY UNIT proper application techniques. - - 1908.8 <br /> CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE COL COLUMN REF REFERENCE s.venryai maintenance of specified curing <br /> temperature ure and techniques. - - ACI 318:26.4.7-2649 1908.9 <br /> DISTRESS TO THE STRUCTURE. THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). CONC CONCRETE REINF REINFORCEMENT 9.Inspect prestressed concrete for <br /> 8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY CONN CONNECTION REQD REQUIRED a.Application of prestressing forces,and - - AG 318:269.2:1 - , <br /> FOR CONSTRUCTION MEANS, METHODS, TECHNI UES, SE UENCES AND PROCEDURES. PROVIDE ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. CONST CONSTRUCTION SF S UARE FOOT b.Gm de utinq of bond prestressing tendons. - - AG 318:26.92.3 <br /> Q Q Q to.Inspetlerecnon of precast concrete members. - - AC1318:Ch.26.8 - <br /> ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE CONT CONTINUOUS SIM SIMILAR II.Verifyln-sna concrete strength,prior to stressing <br /> REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. of tendonsto removal s m of shores <br /> sieved concrete and ACI 318:2610.2 <br /> 9. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE CTR CENTER SPF SPRUCE PINE FIR of tendonInpost ensionand tone from - - - <br /> INTERNATIONAL BUILDING CODE,AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER 14. THE PILE QUANTITY,LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT DET DETAIL STD STANDARD beams and structural slabs. <br /> 12.Inspect iomnrak fa shape,location and <br /> ANY PORTION OF THE WORK. WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. OF DOUGLAS FIR(SOUTH) SYP SOUTHERN YELLOW PINE dirrenslons of the concrete member being - - ACI 318:26.10.1(b) - <br /> 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2018 AND 2012 IBC SECTION 1705,9 MUST BE DEL DOUGLAS FIR LARCH formed. <br /> 10. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. T/ TOP OF TABLE 1705.7 <br /> REQUIRED SPECIAL INSPECTIONS <br /> WHERE THE NOTES,DRAWINGS,AND/OR SPECIFICATIONS DIFFER,THE MORE STRINGENT REQUIREMENT PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS.ITEMS TO BE DIM DIMENSION T/C TOP OF CONCRETE <br /> D] DOUBLE JOIST AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS / <br /> RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: <br /> SHALL APPLY. T/P TOP OF PLATE <br /> A. PRODUCT MANUFACTURER DIA DIAMETER TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION <br /> 11. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES T/S TOP OF STEEL 1.venry aemem materials,sues and lengths comps won REVISIONS <br /> B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS DN DOWN the requirements. x - <br /> OR THE STRUCTURAL DRAWINGS. T/W TOP OF WALL z.Deteenine capacities of test einrnnnis and conduct • -., f <br /> C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,EXTENSIONS, DS DOWN SPOUT x - Si <br /> 12. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. TF TOP FLUSH ' additional load tests.as required. <br /> BRACKETS,BOLTS,THREADED RODS,NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS EA EACH 3.Inspect driving operations and maintain complete and <br /> 13. DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED EF EACH FACE TI TRIPLE JOIST accurate records e each element. x - <br /> REPORT AND THE CONSTRUCTION DOCUMENTS ',rave placement locations and lumbness.confirm <br /> IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. T/BM TOP OF BEAM ends p <br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT,INSTALLATION EQUIPMENT USED,AND El EXPANSION JOINT type and see of on.determine <br /> ethammer,record e number of blows per - <br /> 14. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS,METHODS,AND WORKMANSHIP ACCEPTED AS T/SIABTOP OF SLAB fora of design capacity,record pond penaatronsto x - <br /> THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS ELEV ELEVATION achieve design any day,record op and butt elevations <br /> GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE EN EDGE NAILING(PANEL) TP TOP PLATE and document any damage to foundation element <br /> "INTERNATIONAL BUILDING CODE"(IBC),AND STANDARDS REFERENCED THEREIN. E. ANTICIPATED AND ACTUAL PILING DEPTH TYP TYPICAL 5,For sleetelements,perform additional special - - <br /> F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION EQ EQUAL inspections in accordance Section 17osz. • <br /> 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE ES EACH SIDE UNO UNLESS NOTED OTHERWISE 6.For concrete elements and concrete-tilled elements, <br /> G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, peaormrests and additional special inspections in - - <br /> THE RESPONSIBILITY OF THE CONTRACTOR.THIS INCLUDES EXCAVATIONS,COLUMNS,EQUIPMENT EW EACH WAY UPA UNDER POST ABOVE accordance with section 110,3. <br /> LOADS,MATERIAL LOADS,AND OTHERS.OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED FB FLUSH BEAM UWA UNDER WALL ABOVE 7.For specialy elements,perform additional Inspections <br /> BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. responsible <br /> by the registered design professional in - - <br /> INCLUDEINSPECTIONSOFTEMPORARYLOADINGANDSTABILITYDURINGCONSTRUCTION. FIN FINISH VERT VERTICAL charge. <br /> 16. MINIMUM ASSUMED SOIL BEARING CAPACITY...............3,000 PSF 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION,MISALIGNMENT,OR FAILURE TO MEET OTHER FL FLOOR VIF VERIFY IN FIELD PROJECT NAME <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND FLSHG FLASHING W/ WITH 11011 7TH AVE SE <br /> INSTALL ADDITIONAL PILES AS REQUIRED. FND FOUNDATION WC WESTERN CEDAR EVERETT <br /> CONCRETE ANCHORS HELICAL PILE PROOF TESTING FP FIREPLACE WP WATERPROOF WA 98208 <br /> Fr <br /> 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE,HILTI,OR EQUIVALENT.SPECIAL THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) F00T WWF WELDED WIRE FABRIC c <br /> ROJECT NUSv7BER <br /> INSPECTIONS REQUIRED. PERCENT OF PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM)IN ACCORDANCE WITH THE PROCEDURE <br /> OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE(IBC).THE MAXIMUM TEST LOAD S210309-2XR <br /> STRUCTURAL AND MISC.STEEL SHALL BE TWO-HUNDRED(200)PERCENT OF THE SPECIFIED DESIGN LOAD. <br /> 1. REFERENCE STANDARDS:DESIGN,FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE DRAWN BY-JT <br /> LATEST EDITION OF THE AISC"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". <br /> 2. MATERIALS: <br /> BOLTS-ASTM A307,UNLESS OTHERWISE NOTED CHECKED BY-M RT <br /> WF BEAMS-ASTM A572-50(Fy=50,000 PSI) SHEET DATE-05121I2021 <br /> HSS ROUND COLUMNS-ASTM A500 Gr.B Y= _ <br /> HSS RECTANGULAR COLUMNS-ASTM A500 Gr.B(Fy=46,000 PSI) SCALE <br /> ALL OTHER STEEL-ASTM A36(Fy=36,000 PSI) <br /> STRUCTURAL STEEL WELDING <br /> 1. CONFORM TO THE AWS CODES D1.1 AND D1.3.,AND USE ONLY CERTIFIED WELDERS.WELDS NOT <br /> SPECIFIED ARE TO BE 1/4"CONTINUOUS FILLET MINIMUM.USE DRY E70 ELECTRODES. <br /> ALTERNATES: <br /> 1. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW.ENGINEER MAY REQUEST <br /> PAYMENT FOR REVIEW;CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONAL <br /> COST TO OWNER. Lit <br /> LL <br /> I- <br /> JOBSITE SAFETY: 0 <br /> 1. THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN Z <br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR <br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM <br /> . HIS WORK.THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL H <br /> NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR - <br /> U <br /> PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, D <br /> SUPPLIERS OR THEIR EMPLOYEES,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR OCCUPANCY BY ANY CITY O F EVERETT CC <br /> PERSON. H <br /> REVIEWED FOR PERMIT <br /> El W <br />