My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10505 19TH AVE SE EDWARD JONES 2022-04-29
>
Address Records
>
19TH AVE SE
>
10505
>
EDWARD JONES
>
10505 19TH AVE SE EDWARD JONES 2022-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 10:58:04 AM
Creation date
4/29/2022 10:57:51 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10505
Tenant Name
EDWARD JONES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/10/21,11:40 AM https://waenergycodes.com/print_project_summary_form.php?k=aWQ9NjczMCZmdmk9MTgmY3RpPQ==&print=1 <br /> LIGHTING COMPLIANCE SUMMARY <br /> 4lii <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:R)2021 NEEA,All rights reserved <br /> Project Title Edward Jones Everett-2018 WSEC For Building Department Use: I Date: Nov 10,2021 <br /> 10505 19th Avenue SE <br /> Project Address Suite B <br /> Project&Applicant Everett,WA 982084280 <br /> Information Applicant Name David Soya A^ <br /> Applicant Phone 206-617-9010 U� <br /> Applicant Email david@dsdaa.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.tcchsupport@waenergycodes.com O..-A Q V(J <br /> le Ask <br /> General Occupancy All Commercial _General Building Use Type Office,Professional Services Building Cond.Floor Area C839 <br /> el <br /> New Building or Project Cond.Floor Area . 3 g33 <br /> Alteration • 5. l <br /> General Project Types Alteration Addition Interior Lighting Floors Above Grade 1 <br /> Lighting Scope Lighting Scope <br /> Compliance Method CTpl. e Met -Gencr <br /> Lighting Project Description Interior Alterations to an existing office space L j <br /> i <br /> Lighting Compliance Scope Project Type Interior/Exterior Luminaire Replacement Scope Compliance Method LPA Calculation 1 n• , <br /> and Method (Interior includes both interior <br /> Alteration Interior Lighting less than 50%replaced No Calculation Adjustments allowed 1,,r• <br /> Additional Efficiency <br /> Options Included <br /> Project Title Edward Jones Everett-2018 WSEC Date No 0—,-- —_ <br /> Lighting Power Calculation ALTERATION-INItRIORLIGHTING(less tha'•, '',, Compliance Verification COMPLIES <br /> Interior Lighting Power Allowance <br /> Space Type Existing Lighting Wattage Prior to Alteration Total Watts AllowedCompliance Status <br /> Existing Lighting 566 566 Proposed LightingTotal Watts <br /> By Building Area <br /> Proposed Lighting Power Density-Spaces with less than 50%fixtures replaced <br /> Watts or Total Watts <br /> Fixture Type Fixture ID Quantity of Wattage Limit Total Linear Watts per Linear Proposed <br /> Fixtures(#F) per Fixture Feet(LF) Foot(WpLF) (#F x WpF)or <br /> (WpF) (LF x WpLF) <br /> Individual Fixtures <br /> Troffer 2x4 Troffer 8 60 480 <br /> Wall-mounted Sconce over lavatory 1 26 26 <br /> Proposed Total LPD 506 <br /> Project Title Edward Jones Everett-2018 WSEC Date Nov 10,2021 <br /> Proposed Fixtures Details ALTERATION-INTERIOR LIGHTING(less than 50%replaced) <br /> Fixture Type/Application Fixture ID Location in Documents Lamp'l' pe New <br /> Existing-tt oro-Remain <br /> Individual Fixtures <br /> Troffer 2x4 Troffer A I.2 L E l) Existing-to-Remain <br /> Fixture Description:2x4 Recessed troffer <br /> Wall-mounted Sconce over lavatory I A1.2 LED I Existing-to-Remain <br /> Fixture Description:Sconce over lavatory <br /> https://waenergycodes.com/print_project_summary_form.php?k=aWQ9NjczMCZmdmk9MTgmY3RpPQ==&print=1 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.