My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11014 19TH AVE SE LOMI LOMI SPA 2022-05-06
>
Address Records
>
19TH AVE SE
>
11014
>
LOMI LOMI SPA
>
11014 19TH AVE SE LOMI LOMI SPA 2022-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:05:53 PM
Creation date
4/29/2022 11:04:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11014
Tenant Name
LOMI LOMI SPA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/14/2022 City of Everett Page /2_ <br /> 11:44:43AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2107-174 Site Address 11014 19TH AVE SE UNIT 18A <br /> Applied 7/27/2021 Applicant Jeff Humann Lot <br /> Approved 7/28/2021 Owner SKOTDAL BROTHERS LLC Block <br /> Issued 7/29/2021 Contractor MAIN STREET ELECTRIC Tract <br /> Parent Permit No. B2103-043 Description Modify circuits for new TI unit 18A <br /> Notes circuits for Washer/dryer,sconce lights and exhaust fans <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 7/30/2021 7/30/2021 ELEC 06-ROUGH SKB APPROVAL see notes 7/29/2021 4:11 PM MAIN STREET <br /> IN ELECTRIC <br /> No one on site.with a 1 hour heads up,I <br /> can meet you on site.206-818-1995.or do <br /> video inspection.Thanks <br /> Contact Name:Jeff Humann <br /> Site Address:11014 19TH AVE SE UNIT <br /> 18A <br /> Phone:2068181995 <br /> e-Mail:jeff@mainstreet-electric.com <br /> (7/30/2021 2:15 PM SKB) <br /> Walls only.Clean up all low-voltage cabling <br /> that is laying on the T grid ceiling and <br /> remove all and NM cable that penetrates <br /> the T grid ceiling prior to T grid cover <br /> approval. <br /> 1/26/2022 1/26/2022 ELEC 09-FINAL SKB NOT READY (1/24/2022 9:37 AM CRB) <br /> YUHUA.G2@GMAIL.COM <br /> (1/26/2022 1:54 PM SKB) <br /> Open up T grid ceiling for visual inspection <br /> as it was during Rough in to verify notes <br /> from Rough in were taken care of.Get <br /> mechanical T-grid and final approval prior <br /> to electrical final.A few things I noticed <br /> one provide GFCI protection for the laundry <br /> receptacle that is within 6 feet of the sink 2 <br /> the light switches cannot be in the shower <br /> room and 3 install a damp rated light fixture <br /> in the shower room 4 provide GFCI <br /> protection for the shower room lights and <br /> fan with exposed metal parts. <br /> 2/17/2022 2/17/2022 ELEC 07-TGRID SKB CORRECTION (2/16/2022 9:25 AM CRB) <br /> YUHUA.G2@GMAIL.COM <br /> (2/17/2022 1:28 PM SKB) <br /> skb changed Inspection Type from ELEC <br /> 06-ROUGH IN to ELEC 07-TGRID <br /> (2/17/2022 1:32 PM SKB) <br /> Make sure all light fixtures are properly <br /> secured to the grid and have seismic wires <br /> to the structure above.Tougher light is not <br /> wet rated and cannot be with in the shower. <br /> Junction box in the back room is open with <br /> wires hanging out.Delete all low-voltage <br /> wires or properly secure them above the <br /> grid old camera and speaker system.For <br /> final wall sconces do not cover the light box <br /> properly.Laundry receptacle is not energize <br /> for testing.GFCI protect all lights and fan <br /> in shower room. <br /> 2/23/2022 2/23/2022 ELEC 07-TGRID SKB APPROVAL YUHUA.G2@GMAIL.COM <br /> INSP12 ClSSTlS <br />
The URL can be used to link to this page
Your browser does not support the video tag.