My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corporation Inc 4/20/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Northwest Corporation Inc 4/20/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:40:30 PM
Creation date
4/29/2022 1:39:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corporation Inc
Approval Date
4/20/2022
Department
Public Works
Department Project Manager
Souheil Nasr/Keith Alewine
Subject / Project Title
Combined Sewer Main Improvements
Public Works WO Number
UP3768
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003148
Total Compensation
$50,996.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 1/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:91 BC6D4E-D200-45EA-8C11-BC3801 D55A0C <br /> PROJECT: POE of Everett Combined Sewer Main Improvements <br /> Work Order Number: UP-3768 <br /> WORK CHANGE DIRECTIVE: No. 02 <br /> DATE OF ISSUANCE: <br /> You are directed to proceed promptly with the following change (s): <br /> Description: <br /> 1. Install Tensar TX7 Geogrid in lieu of nonwoven geotextile, as recommended by the <br /> engineer in RFI # 10 response, at the cost difference between the geotextile price <br /> ($0.970 and the geogrid price ($4.70), plus appropriate markup, for a cost of$4.50/SY. <br /> Plan quantity: 1,350 SY(4.50)=$6,075.00 total cost. <br /> Purpose of Work Change Directive: Provide more strength and stability for the gravel pad <br /> that supports heavy storage containers. <br /> Attachments: (List documents supporting change): RFI # 10 <br /> If a claim is made that the above change(s) have affected Contract Price or Contract Times, any claim <br /> for a Change Order based thereon will involve one or more of the following methods of determining the <br /> effect of the change(s). <br /> Method of determining change Method of determining change <br /> In Contract Price: in Contract Times: <br /> ® Unit Prices ❑ Contractor's records <br /> ❑ Lump Sum ❑ Contract Documents <br /> ❑ Other—Time & Materials-If Needed ❑ Other Inspector's records <br /> Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br /> TBD Substantial Completion TRD days: <br /> If the change involves an increase,the Ready for final payment TBD days: <br /> estimated amount is not to be exceeded If the change involves an increase,the estimated <br /> without further Authorization. times are not to be exceeded without further <br /> Authorization. <br /> ACCEPTED: Northwest Construction AUTHORIZED: City of Everett <br /> ,-DocuSigned by: DocuSigned by: <br /> y � � 3/30/2022 19:5 N1 .� T 3/30/2022 I 10:01 AN <br /> B Date: B : itit,WiiAi, Date. <br /> \—EetillitiontimectSignature) 8c27B7A243E14.ltkuthorized Sign ture) <br /> oift r <br /> TBD=To be determined 3/?U l <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.