Laserfiche WebLink
1 Clear Water <br /> SERVICES <br /> Innovative Water Quality Solutions—Stormwater,Groundwater,and Waste Water <br /> 2525 West Casino Road-Suite 7A,Everett,WA 98204•(425)412-5700•clearwaterservices.com <br /> Cost for G.A.C.equipment at the POE project for NW Construction(2 Month Duration) <br /> Item Task Quantity Unit Unit Price Cost Estimate Notes <br /> EQLJ1PMIENT <br /> • Carbon Fitts on' ys <br /> Carbon Filtration 1 EA/MO $7,743 $15,486 Monthly Rental for Carbon vessels. Does not include initial media <br /> installation(Assumes source water<10NTU) <br /> Additional plumbing 1 EA/MO $500 $1,000 EPDM hoses,adapter fittings,pressure valves,sample stations <br /> Task Total $15,486 Monthly Rental based on Calendar Months <br /> LABOR AND CONSUMABLES <br /> G.A.0 Filtration Installation&Removal <br /> Includes labor and materials to install G.A.0 filtration.G.C.To <br /> Installation&Decommission 1 LS $6,565 $6,565 provide level stable pad for G.A.C.system,and equipment for <br /> offloading/loading. <br /> Labor and materials to deliver&remove G.A.0 filtration,does not <br /> Equipment Transportation 1 EA/WAY $1,600 $3,200 <br /> include media removal,disposal,or tank cleaning. <br /> Carbon Media-Sanitary Sewer 10,000 LS $1.10 $11,000 Carbon media quote is valid for 7 days from issuance of quote <br /> Task Total $20,765 <br /> Operations,Maintenance and Project Management <br /> Clear Water can provide a DOE certified technician to sample and <br /> Treatment Technician $115 monitor discharge to sanitary sewer.Equipment installlteardown <br /> As Req'd HR T&M will be billed at this rate for non prevailing wage projects. <br /> Permit Assistance/Project $125 Clear Water Will provide document preparation and permitting <br /> Management assistance at the listed rate. <br /> Consumables and Other Direct Costs <br /> pH Adjustment Chemistry& Lab supplies and chemistry billing will be based on actual <br /> Miscellaneous lab supplies t consumption at cost+18%.Estimate available upon request. <br /> Tank Cleaning/Sludge Removal As Req'd Cost+18% T&M Tank Cleaning will require Vactor Truck Service. Clear Water will <br /> source this service at cost+18% <br /> Analytical sampling Will Bill at cost+18% <br /> Task Total T&M Consumable billing will be based on usage <br /> Project Total $36,251 *Excludes PVC and Media Quotes,depending on Market Rates. <br /> Estimate valid for 30 days*from: 3/15/2022 See line item. <br /> 1)Does not include applicable state and local taxes. Estimate Prepared by: Nicholas Buckner <br /> 2)Excludes Retention <br /> 3)Payment terms:Net 30 Estimate Reviewed by: Duncan Medlin <br /> 4)1%interest on balances over 30 days past due <br /> WAC21POE01_GAC <br /> 5)Excludes any and all permits <br />