My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corporation Inc 4/20/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Northwest Corporation Inc 4/20/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:40:30 PM
Creation date
4/29/2022 1:39:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corporation Inc
Approval Date
4/20/2022
Department
Public Works
Department Project Manager
Souheil Nasr/Keith Alewine
Subject / Project Title
Combined Sewer Main Improvements
Public Works WO Number
UP3768
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003148
Total Compensation
$50,996.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 1/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> Northwest Pre Construction. Project Strategy. <br /> CONSTRUCTION,INC. I Value Estimating. Quality Completion. <br /> March 15,2022 SERIAL LETTER NO.05 <br /> To: City of Everett Public Works <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Attn: Keith Alewine—Construction Manager <br /> Project: UP-3768 Port of Everett Combined Sewer Main Improvements <br /> Subject: 12"PVC Pipe Restraints <br /> Dear Mr.Alewine, <br /> The measurement and payment section for Bid Item#22—PVC Sanitary Sewer Pipe,12"says that restrained <br /> joints are required where shown on the plans or as required by the Standard Specifications and Special Provisions. <br /> The plans do not show or call out any restraints or thrust blocks on the 12" forcemain. Special Provision section <br /> 7-20.3(1) says to follow section 7-09.3(21)which only amends the Standard Specifications for restraining ductile <br /> iron fittings they are connected to ductile iron pipe. Nothing in the Special Provisions refers to restraining PVC <br /> pipe. <br /> Northwest Construction feels that this is beyond what is included in the measurement and payment section of the <br /> Special Provisions and considers this to be extra work. With the Engineer's recommendation for installing the <br /> restraints on all bends,fittings and placed at the two joints past each fitting in either direction,we calculate that <br /> we will need 26 ea restraints. Northwest Construction proposes a price of$320 to install the 26 required <br /> restraints,or$8,320.00. Please review the attached proposal and if everything is acceptable,please issue a change <br /> order for the above mentioned work. <br /> Please feel free to contact me if you have any questions or if any additional information is needed. <br /> Sincerely, <br /> yv7:;L."„<... .__ <br /> Nick Agostino <br /> Project Manager <br /> Northwest Construction,Inc. <br /> nagostino@northwestconstruction.com <br /> (425) 453-8380 <br /> V 425.453.8380 F 425.453.8404 :: 2353 130th Ave NE,Suite 100::Bellevue,WA 98005::www.northwestconstruction.com <br /> CONTRACTOR'S LICENSE NO.NORTHCI101NG::EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.