My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW VERIZON ANTENNA 2022-04-29
>
Address Records
>
75TH ST SW
>
1802
>
VERIZON ANTENNA
>
1802 75TH ST SW VERIZON ANTENNA 2022-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:59:43 PM
Creation date
4/29/2022 1:59:37 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Tenant Name
VERIZON ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
verizon✓ <br /> /111111* <br /> IT" <br /> MORRISON HERSHFIELD <br /> Ms. Rena Peyton Morrison Hershfield <br /> Verizon Wireless 1455 Lincoln Parkway, Suite 500 <br /> 3305 160th AVE SE Atlanta, GA 30346 <br /> BELLEVUE, WA 98008 (770)379-8500 <br /> (253)260-2038 <br /> Date: September 30, 2021 <br /> Subject: Mount Analysis Report <br /> Carrier: Verizon Wireless <br /> Carrier Site ID: 5032614 <br /> Carrier Site Name: SEA CLASH <br /> Site Address: 1802 75th ST SW Everett, Snohomish County,WA 98203 <br /> Site Coordinates: Latitude: 47° 55'29.2" N, Longitude: 122° 15' 33.2"W <br /> Tower Description: 160 ft—Monopole Tower <br /> Mount Description: 12.5 ft— Platform Mount <br /> Morrison Hershfield Project Number: VZW-182R3/2103376 <br /> Dear Ms. Peyton, <br /> Morrison Hershfield is pleased to submit this "Mount Analysis Report" to determine the structural integrity of <br /> existing antenna mounting system for the existing and proposed antenna and equipment on the above- <br /> mentioned supporting tower structure. Analysis of the existing supporting tower structure is to be completed by <br /> others and therefore is not part of this analysis. <br /> This mount analysis has been performed in accordance with the TIA-222-H Standard and the 2018 International <br /> Building Code based upon an ultimate 3-second gust wind speed of 98 mph. Applicable standard references <br /> and design criteria are listed in Section 2-Analysis Criteria. <br /> Our analysis demonstrates that the existing mount IS in conformance with the requirements of the above noted <br /> standards under the effects of loading described. <br /> Summary of Results <br /> Mount Components 69.7% Sufficient <br /> We at Morrison Hershfield appreciate the opportunity of providing our continuing professional services to you <br /> and Verizon Wireless. If you have any questions or need further assistance on this or any other projects, please <br /> give us a call. <br /> Respectfully submitted by: <br /> Morrison Hershfield "` <br /> G. Lance Cooke, P.E (WA License No. 42237) ' tr 1 41 <br /> Senior Engineer } <br /> f, <br /> .z “3,— I leis& rsx 0+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.