My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 4/25/2022
>
Contracts
>
6 Years Then Destroy
>
2022
>
HDR Engineering Inc. 4/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 2:28:47 PM
Creation date
4/29/2022 2:28:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
4/25/2022
End Date
12/31/2022
Department
Facilities
Department Project Manager
Darcie Byrd
Subject / Project Title
Right of Way Acquisition Consulting
Public Works WO Number
PW3694-10-11
Tracking Number
0003322
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Edgewater Bridge <br /> DRAFT Scope of Services <br /> Prepared by: <br /> FyIZ Krista Chambers, SR/WA <br /> WA RES Transportation Manager <br /> 2707 Colby Avenue <br /> Everett, WA 98201 <br /> March 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.