Laserfiche WebLink
• <br /> Review Reply Letter 11/22/2018 <br /> Yuri Pusyak Addition — 107th PI Se— Everett (Pavel Andreyanov contact) <br /> Plan Check no: C1808-008—Tony Lee Bldg Official — Everett `'VW <br /> Non Structural: <br /> Construction: �9 <br /> 1. Plan notes reference to A5-7 removed from Al �� - <br /> 2. Soffit Venting notes added/clouded on Roof Plan A3 ®fi ec` ces <br /> 3. A typical Fnd Detail 2/A2 has been added/clouded Gc'eCCC1 <br /> 4. 6" clearance from grade to framing at ext. fnd. added/clouded on Al. <br /> 5. FJ clearance to crawl grade added to fnd detail 2/A2 <br /> 6. Access to new crawlspace indicated/clouded on A2 — access from existing <br /> crawl. <br /> 7. Typical 1 story section added/clouded on A2 indicating all siding/ roofing/ <br /> etc. details. <br /> 8. Beam (3) 4x10 is indicated in the back right corner of the crawl space <br /> 9. A conc landing has been added/clouded on A3 with 7 3/ max step down and <br /> projecting 3'. <br /> 10.A smoke on Carbon Monoxide detector has been added/clouded on A3. <br /> Energy: <br /> 1. The insulation baffle at the eve is indicated on the Typical 1 story section <br /> added to A2. <br /> 2. Floor insulation notation increased to R-38, clouded on all locations on Al <br /> and A2. <br /> 3. R-10 insulated headers indicated on Typical 1 story section added to A2. <br /> Structural: <br /> 1. 1/2x3 lag bolt details added to new Fnd Detail 2/A2. <br /> 2. Refer to Structural Engineer <br /> 3. GLB connection notes have been clouded on A3. Typical of 3 locations. <br /> 4. Refer to Structural Engineer <br /> 5. Refer to Structural Engineer <br /> Thank You <br /> Doug Williams — Designer— dougwilliams444@gmail.com —425 530 1042 <br />