Laserfiche WebLink
Imo EVERETT <br /> WASHINGTON <br /> IX. Documents and Records <br /> A. All plans, reports, maps and any other document published or otherwise completed <br /> as a part of this Contract shall be made available to the City for inspection upon request by the <br /> City. <br /> B. All documents and records maintained by the Contractor in connection with the <br /> Project shall be made available for inspection upon request by the City. <br /> X. Ownership of Project Materials <br /> A. Except as otherwise provided in this Contract, all finished or unfinished documents, <br /> data, studies, surveyors, drawings, maps, models, photographs, films,duplicating plates and <br /> reports prepared by the Contractor under this Contract shall be the property of the Contractor. <br /> B. No report, device, thing or document of whatever kind or nature produced in <br /> whole or in part under this Contract shall be the subject of an application for copyright or <br /> patent by or on behalf of either party without the prior written approval of the other. <br /> C. When capital assets or equipment acquired with Contract funds are sold or cease to <br /> be used for lawful purposes defined in this Contract, the undepreciated or resale value thereof <br /> (whichever is higher) shall be paid to the City in the same proportion as Contract funds were <br /> utilized to acquire such property. <br /> Xl. Termination <br /> A. The City may terminate this Contract at any time with or without cause by giving <br /> written notice to the Contractor and specifying the effective date. In such event, all finished or <br /> unfinished documents, data,studies, surveys, drawings, maps, models, photographs, films, <br /> duplicating plates and reports prepared by the Contractor under this Contract shall then be <br /> delivered to the City and become the property of the City. If the Contract is terminated in this <br /> manner for other than material breach,the City shall pay the Contractor for obligations <br /> incurred in accordance with the terms of this Contract through the effective date of <br /> termination. <br /> B. The City may terminate this Contract in the event that, for any reason, funds are <br /> not available to the City for the purpose of meeting the City's obligation hereunder. <br /> C. Notwithstanding any other provision of this Contract, the Contractor shall not be <br /> relieved of liability to the City for costs, if any, assessed against the City as a result of <br /> Contractor's actions or failure to act under this Contract. The City may withhold payment to <br /> the Contractor for the purpose of setoff until the exact amount of any such costs is determined. <br /> XII. Hold Harmless Provision <br />