My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bridgeways 4/25/2022
>
Contracts
>
6 Years Then Destroy
>
2022
>
Bridgeways 4/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 11:31:18 AM
Creation date
5/6/2022 11:31:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bridgeways
Approval Date
4/25/2022
Council Approval Date
2/2/2022
End Date
12/31/2022
Department
Neighborhood/Comm Svcs
Department Project Manager
Kemba Landry
Subject / Project Title
Human Needs Bridgeways MAP Program
Tracking Number
0003340
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> WASHINGTON <br /> XIV. Venue <br /> Venue for any lawsuit arising out of this Contract shall be in Snohomish County, <br /> Washington. The laws of the State of Washington shall govern this Contract. <br /> XV. Non-Waiver <br /> The City's failure to insist upon the strict performance of any provision of this Contract or to <br /> exercise any right based upon a breach thereof, or the acceptance of any performance during such <br /> breach, shall not constitute a waiver of any rights under this Contract. <br /> XV. Signature <br /> This Contract may be signed in counterparts, each of which shall be deemed an original, and <br /> all of which, taken together, shall be deemed one and the same document. Execution and delivery of <br /> this Contract by the parties shall be legally valid and effective through any combination of: (i) executing <br /> and delivering a paper copy, (ii) transmitting the executed paper copy by email in pdf format or other <br /> electronically scanned format, or (iii) execution and transmittal by AdobeSign or DocuSign or similar e- <br /> signature method. <br /> IN WITNESS WHEREOF, the City and Contractor have executed this Contract as of the date first above <br /> written. <br /> City of Everett Contractor <br /> Bridgeways <br /> • <br /> Act a :"9"1°°° <br /> Cassie ran in, ayor Andrea Duffield <br /> Attest: <br /> CEO <br /> Title <br /> City lerk <br /> Approved As To Form: <br /> ARO M <br /> OFFICEPPOVED OF THEAST CITY FO ATTORNEY <br /> PERM <br /> City Attorney <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.