Laserfiche WebLink
Construction Stormwater Site Inspection Form <br /> Project Name Permit# Inspection Date Time <br /> Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre <br /> Print Name: <br /> Approximate rainfall amount since the last inspection (in inches): <br /> Approximate rainfall amount in the last 24 hours (in inches): <br /> Current Weather Clear Cloudy Mist Rain Wind Fog <br /> A.Type of inspection: Weekly Post Storm Event Other <br /> B. Phase of Active Construction (check all that apply): <br /> Pre Construction/installation of erosion/sediment ] Clearing/Demo/Grading Infrastructure/storm/roads <br /> controls <br /> Concrete pours Vertical Utilities <br /> Construction/buildings <br /> Offsite improvements Site temporary stabilized Final stabilization <br /> C. Questions: <br /> 1. Were all areas of construction and discharge points inspected? Yes No <br /> 2. Did you observe the presence of suspended sediment,turbidity,discoloration, or oil sheen Yes No <br /> 3. Was a water quality sample taken during inspection? (refer to permit conditions 54&S5) Yes No <br /> 4. Was there a turbid discharge 250 NTU or greater,or Transparency 6 cm or less?* Yes No <br /> 5. If yes to#4 was it reported to Ecology? Yes No <br /> 6. Is pH sampling required? pH range required is 6.5 to 8.5. Yes No <br /> If answering yes to a discharge, describe the event. Include when,where, and why it happened; what action was taken, <br /> and when. <br /> *If answering yes to#4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/transparency is 33 <br /> cm or greater. <br /> Sampling Results: Date: <br /> Parameter Method(circle one) Result Other/Note <br /> NTU cm pH <br /> Turbidity tube, meter, laboratory <br /> pH Paper, kit, meter <br /> Page 1 <br />