My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111.1 PUBLICIUORKS PERMIT •DateApplied: 3/2/2018 <br /> City of Everett Permit Services Public orks Permit#: PW1803-007 <br /> E V E R E T T 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference it: PREAPP17-017 <br /> WASHINGTON 425-257-8810 Public Works Fee: $6295.73 }(� <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 2 4 DEC 1U19 <br /> GEORGIU GHEORGHE&EUGINIA GEORGIU GHEORGHE& EUGINIA <br /> 5810 86TH PL SW 5810 86TH PL SW <br /> MUKILTEO,WA,98275 MUKILTEO,WA,98275 <br /> PHONE: PHONE: <br /> TAX PARCEL ID it 28041000302700 SITE ADDRESS:7805 40TH AVE W <br /> DESCRIPTION:SITE WORK FOR NEW BUILDING/PARKING ETC <br /> (6/7/2019 9:19 AM BES) <br /> SITE WORK FOR NEW BUILDING/PARKING ETC <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated 05/04/2019.Approved plans must <br /> remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required inspections.Flyers <br /> are provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a separate Utility Permit <br /> to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction Standards and <br /> Specifications for Development prior to final approval/close out of the permit. <br /> 8.Coordinate with the City of Mukilteo for the water and sewer connection and fee that maybe required by the City of Mukilteo.. <br /> 9. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing Planning Landscape inspection <br /> under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 10.Make sure you coordinate and contact with the City of Mukilteo before you start the project. <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW 22-Site Final within <br /> the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Applicant/Owner understands and agrees that:1)sewer service to this site will be provided through a connection to the facilities of Mukilteo Water and Wastewater <br /> District(MWWD),and 2)that sewer service will be provided pursuant to an Interlocal Agreement(not yet finalized)between the City of Everett(City)and MWWD,and <br /> 3)will pay all fees and charges and obtain all permits required by both the City and MWWD necessary to establish sewer service to this site prior to issuance of a <br /> certificate of occupancy for the building. <br /> Public Works Permit Fee Breakdown: <br /> Paving(6,906SF) $45.00 <br /> Erosion Control $200.00 t <br /> Grade/Fill/Excavate(SOOXCY) $130.00 , <br /> PW Plan Review $1,082.40 �'_L C S• L '1 <br /> PW Site Inspection $2,164.80 <br /> Storwater System Development fee(10,749 S.F.) $2,673.53 CITY Or 'eY � 'Y.` <br /> Permit Service <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> 0,6 causes of action that may arise because of installation and maintenance of <br /> pp d for Construction (PL bli orks) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> prrop/ r.y damaged thereby.FINAL INSPECTION Date ` / (r( <br /> Approved as Constructed(PW Inspector) Signa ure ofAppli'ant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.