My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Project Information <br /> Project/Site Name: Georgiu Commercial <br /> Street/Location: 7805 40th Ave W <br /> City: Mukilteo State: WA Zip code: 98275 <br /> Subdivision: <br /> Receiving waterbody: Japanese Gulch Creek <br /> 1.1 Existing Conditions <br /> Total acreage (including support activities such as off-site equipment staging yards,material <br /> storage areas,borrow areas). <br /> Total acreage: 1.95 acres <br /> Disturbed acreage: 0.42 acres <br /> Existing structures: 0.09 acres <br /> Landscape Topography: Moderate <br /> Drainage patterns: Sheet Flow <br /> Existing Vegetation: Covered native vegetation. <br /> Critical Areas (wetlands, streams,high erosion risk, <br /> steep or difficult to stabilize slopes): Steep Slopes, Stream <br /> List of known impairments for 303(d) listed or Total Maximum Daily Load(TMDL) for the <br /> receiving waterbody: <br /> NA <br /> 1.2 Proposed Construction Activities <br /> Description of site development(example: subdivision): <br /> The proposal is to construct an industrial building to the south of the site and a large parking area <br /> associated to it. The existing building and parking spaces present to the north of the property will <br /> remain. The access to the site will be from 40th Ave W. Frontage Improvements are also <br /> proposed long 78th St SW and 40th Ave W. <br /> Description of construction activities (example: site preparation, demolition, excavation): <br /> Prepare the site for construction by the installation of the indicated BMP's. Excavate the site for <br /> the new structures. <br /> Description of site drainage including flow from and onto adjacent properties. Must be consistent <br /> with Site Map in Appendix A: <br /> A Stormtech system SC-740 of capacity 5,504 CF will be located underneath the parking area <br /> near the northeast portion of the site is proposed to meet the flow control requirements <br /> conforming to the City of Everett requirements. The Stormtech system was sized using Western <br /> Washington Hydrology Model V 4.2.14 (WWHM). The roof and the yard drains will be <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.