My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Process water and slurry resulting from saw-cutting and surfacing operations will be <br /> prevented from entering the waters of the State by implementing Saw-cutting and Surfacing <br /> Pollution Prevention measures (BMP C152). <br /> Concrete and grout: <br /> ❑ Process water and slurry resulting from concrete work will be prevented from entering <br /> the waters of the State by implementing Concrete Handling measures (BMP C 151). <br /> Sanitary wastewater: <br /> ❑ Portable sanitation facilities will be firmly secured,regularly maintained, and emptied <br /> when necessary. <br /> Solid Waste: <br /> ❑ Solid waste will be stored in secure, clearly marked containers. <br /> Other: <br /> ❑ Other BMPs will be administered as necessary to address any additional pollutant sources <br /> on site. <br /> A SPCC plan is required for this site. <br /> As per the Federal regulations of the Clean Water Act(CWA)and according to Final Rule 40 <br /> CFR Part 112, as stated in the National Register, a Spill Prevention, Control, and <br /> Countermeasure(SPCC) Plan is required for construction activities. A SPCC Plan has been <br /> prepared to address an approach to prevent,respond to,and report spills or releases to the <br /> environment that could result from construction activities. This Plan must: <br /> ❑ Be well thought out in accordance with good engineering; <br /> List and describe BMPs: BMP C151, BMP C152,BMP C153, BMP C140 and BMP C220.. <br /> Installation Schedules: <br /> Inspection and Maintenance plan: All pollutants, including waste materials and demolition <br /> debris,that occur onsite shall be handled and disposed of in a manner that does not cause <br /> contamination of stormwater. Good housekeeping and preventative measures will be taken to <br /> ensure that the site will be kept clean,well organized, and free of debris. <br />• <br /> Achieve three objectives -prevent spills, contain a spill that occurs, and clean up the spill; <br /> ❑ Identify the name, location, owner, and type of facility; <br /> ❑ Include the date of initial operation and oil spill history; <br /> ❑ Name the designated person responsible; <br /> ❑ Show evidence of approval and certification by the person in authority; and <br /> ❑ Contain a facility analysis. <br /> Responsible Staff: Contractor. <br /> Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site? <br /> ❑ YesN1 No <br /> Will wheel wash or tire bath system BMPs be used during construction? <br /> ❑ Yes11 No <br /> Will pH-modifying sources be present on-site? <br /> ® Yesn No <br /> Page I19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.