Laserfiche WebLink
Permit documentation will be provided within 14 days of receipt of a written request from <br /> Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when <br /> requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP. <br /> 6.1.3 Updating the SWPPP <br /> The SWPPP will be modified if: <br /> • Found ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. <br /> • There is a change in design, construction, operation, or maintenance at the construction <br /> site that has, or could have, a significant effect on the discharge of pollutants to waters of <br /> the State. <br /> The SWPPP will be modified within seven(7)days if inspection(s)or investigation(s) determine <br /> additional or modified BMPs are necessary for compliance. An updated timeline for BMP <br /> implementation will be prepared. <br /> 6.2 Reporting <br /> 6.2.1 Discharge Monitoring Reports <br /> Cumulative soil disturbance is one(1) acre or larger; therefore,Discharge Monitoring <br /> Reports (DMRs)will be submitted to Ecology monthly. If there was no discharge during a given <br /> monitoring period the DMR will be submitted as required,reporting"No Discharge". The DMR <br /> due date is fifteen(15)days following the end of each calendar month. <br /> DMRs will be reported online through Ecology's WQWebDMR System. <br /> 6.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br /> cause a threat to human health or the environment,the following actions will be taken: <br /> 1. Ecology will be notified within 24-hours of the failure to comply by calling the <br /> applicable Regional office ERTS phone number(Regional office numbers listed below). <br /> 2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br /> correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br /> will be repeated immediately and the results submitted to Ecology within five(5) days of <br /> becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology <br /> within five(5)days,unless requested earlier by Ecology. <br /> Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 <br /> cm or less,the Ecology Regional office will be notified by phone within 24 hours of analysis as <br /> required by Special Condition S5.A of the CSWGP. <br /> • Central Region at(509) 575-2490 for Benton, Chelan, Douglas,Kittitas, Klickitat, <br /> Okanogan, or Yakima County <br /> Page I32 <br />