Laserfiche WebLink
The proposed vault can be satisfactorily supported on the very dense glacial till encountered in our <br /> borings or on a minimum 2-foot thickness of structural fill. An allowable bearing pressure of 3,000 psf <br /> may be used in design of vault foundations supported on structural fill. This value can be increased to <br /> 8,000 psf where footings will be supported on undisturbed dense to very dense glacial till (anticipated <br /> below a depth of about 10 feet based on the 1979 as-built of the existing stormwater pipe and <br /> subsurface conditions encountered in boring B-3). We recommend placing a minimum 6-inch-thick <br /> layer of crushed rock beneath the vault slab to provide a level foundation and prevent disturbance of <br /> the subgrade. <br /> The effects of buoyancy under empty vault conditions should be considered in design. Buoyancy effects <br /> can be resisted by the weight of the concrete structure, the weight of zones of soils which are located <br /> above the slab floor which protrude beyond the walls, and soil friction along the sides of the walls. <br /> We recommend temporary cut slopes be inclined at 1H:1V (horizontal to vertical) or flatter depending <br /> on localized sloughing. Slope inclinations may need to be modified by the contractor if localized <br /> sloughing occurs. Steeper slopes up to 3/4H:1V may be feasible in the very dense glacial soils provided <br /> the geotechnical engineer confirms soil conditions are consistent and evaluates stability of the slopes <br /> during construction. <br /> ill The existing fill and native glacial till soils consist of moisture-sensitive silty soils that will become easily <br /> disturbed when wet. Re-use of the excavated soils will not be practical during wet weather or if the soils <br /> are more than about two points above the optimum moisture content. Based on the moisture content <br /> of the samples obtained in the borings, portions of the on-site soils may be suitable during dry weather <br /> provided they are properly conditioned. <br /> ri Perched groundwater was observed at 71/2 feet and 141/2 feet in boring B-3. Based on our experience, <br /> it is likely that utility excavations may be dewatered using a series of sumps and pumps from within the <br /> excavations. <br /> 4.1. Earthquake Engineering <br /> We evaluated the site for seismic hazards including liquefaction, lateral spreading, fault rupture and <br /> earthquake induced landsliding. Our evaluation indicates that the site does not have liquefiable soils <br /> present and therefore also has no risk of liquefaction induced lateral spreading. In addition, the site has a <br /> low risk of fault rupture and earthquake induced landsliding. <br /> 4.1.1.2015 IBC Seismic Design Information <br /> We recommend the following IBC 2015 parameters for Average Field Standard Penetration Resistance, <br /> Site Class,short-period spectral response acceleration(Ss), 1-second period spectral response acceleration <br /> (Si), and Seismic Coefficients FA and Fv. <br /> TABLE 1.2015 IBC SEISMIC PARAMETERS <br /> 2015 IBC Parameter Recommended Value <br /> Average Field Standard Penetration Resistance >50 <br /> Site Class C <br /> Short Period Spectral Response Acceleration,Ss(percent g) 144 <br /> 1-Second Period Spectral Response Acceleration,Si(percent g) 56 <br /> GEOENGINEERS_5 November 14,2019 Page 4 <br /> File No.2095-019-07 <br />