Laserfiche WebLink
Start End Total Logged By CWM Drilling <br /> Drilled 7/11/2019 7/11/2019 Depth(ft) 21 Checked By CWM Driller Advance Drill Technologies,Inc. Method Hollow-stem Auger <br /> Surface Elevation(ft) 569 Hammer Autohammer Drilling Diedrich D50 Turbo <br /> Vertical Datum NAVD88 Data 140(lbs)/30(in)Drop Equipment <br /> Easting(X) 1289298 System WAState Plane North <br /> Northing m 338692 Datum NAD83(feet) Groundwater not observed at time of exploration <br /> Notes: <br /> FIELD DATA <br /> oo Y Y £ to o MATERIAL <br /> w z DESCRIPTION e o REMARKS <br /> N b0 V V <br /> N L E > y 8 — C L Q 42. <br /> >- C <br /> a)11 8 3 . >_.N N O M .a c c <br /> w o S cc m C.) U)I-- C7 C7 U 2 c°� ir.0 <br /> 0 <br /> pi AC �6inchesasphaftconcretepavement �/-�- <br /> ( CR \3 inches base course / <br /> - - <br /> ML - Gray-brown sandy silt with occasional gravel(hard,/X\ - <br /> / 17 so/11„ 1 moist)(glacial till) _ 9 53 <br /> - h SA <br /> Co h - - <br /> -- 5 11 50/5" 2 _ <br /> Slight oxidation staining <br /> - <br /> o <br /> - 10 12 50/6" 3 Becomes gray 9 55 <br /> SA <br /> 0 <br /> z <br /> x <br /> w 15 <br /> o x — — <br /> 18 77 4c�i - <br /> w <br /> (1 <br /> a' <br /> R <br /> (') _ - - <br /> z <br /> d 20 X 2 50/5" 5 <br /> o, <br /> w <br /> z <br /> 2 <br /> 0 <br /> , <br /> 13 <br /> 0 <br /> 0 <br /> i <br /> 0 <br /> 0 <br /> y <br /> U <br /> a <br /> S <br /> .1 <br /> . <br /> x <br /> 8 Note:See Figure A-1 for explanation of symbols. <br /> Coordinates Data Source:Horizontal approximated based on Topographic Survey.Vertical approximated based on Topographic Survey. <br /> z <br /> Log of Boring B-2 <br /> E Project: Casino Road Renovation Project <br /> Project Location: Everett,Washington <br /> i G EOENGINEERSFigure A-3 <br /> Project Number: 2095 019 07 Sheet 1 of 1 <br />