My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 7 ELEVEN 2022-05-12
>
Address Records
>
HARDESON RD
>
7500
>
7 ELEVEN
>
7500 HARDESON RD 7 ELEVEN 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 8:54:18 AM
Creation date
5/9/2022 1:23:58 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Tenant Name
7 ELEVEN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLR IVORKS PERMIT • Date Applied: 2/28/2020 <br /> City of Everett Permit Services Publi orks Permit#: PW2002-045 <br /> E V E R E T T 3200 Cedar Street, 2"d Floor Everett, WA 98201 Associated Bldg Permit#: B2001-006 <br /> Planning Reference#: REVI20-005 <br /> WASHINGTON 425-257-8810 Public Works Fee: $15,010.34 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> HARDESON LLC BRYNESTAD BART <br /> 14241 NE WOODINVILLE DUVALL RD <br /> WOODINVILLE,WA,98072 , , <br /> PHONE: PHONE:2533832422 <br /> TAX PARCEL ID#:28041200305800 SITE ADDRESS:7500 HARDESON <br /> DESCRIPTION:SITE WORK FOR 7-ELEVEN&GAS STATION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 9/17/2020.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to <br /> be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work <br /> shall be scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the <br /> City prior to final approval/close out of the permit. <br /> 9.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> 11.A separate Traffic Street Use(TSU) permit is required for all a• „ .y r,. idewa 1 cllosures and can be applied for at <br /> pw.everettwa.gov. � ji <br /> Public Works Permit Fee Breakdown: q ( <br /> Paving(24,065SF) $120.33 SEP 17 2020 <br /> �,... <br /> Erosion Control $200.00 CITY OF EVI R�"�"�' <br /> Grade/Fill/Excavate(1,015CY) $245.00 <br /> PW Plan Review $2,762.18 Permit Services <br /> PW Site Inspection $5,524.35 <br /> Stormwater System Development Fee $6,158.48 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> -�. may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> d� 7 Z02-6 agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.