My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD Geotech Report 2022-10-25
>
Address Records
>
HARDESON RD
>
7500
>
Geotech Report
>
7500 HARDESON RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:10:00 PM
Creation date
5/9/2022 3:09:48 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Geotechnical Engineering Report SSGC <br /> I Hardeson Road Retail <br /> Everett, Washington <br /> SSGC Project No. 18072 <br /> ISeptember 18.2018 <br /> using conventional rollers, with backfill compacted to at least 92 percent of the MDD (ASTM <br /> ID1557). <br /> REPORT CONDITIONS <br /> IThis report has been prepared for the exclusive use of Mr. Sang Ji for specific application to the project <br /> discussed, and has been prepared in accordance with generally accepted geotechnical engineering <br /> Ipractices in the area. No warranties, either express or implied, are intended or made. The analysis and <br /> recommendations presented in this report are based on observed soil conditions and test results at the <br /> I indicated locations, and from other geologic information discussed. This report does not reflect variations <br /> that may occur across the site,or due to the modifying effects of construction,or weather. The nature and <br /> extent of such variations may not become evident until during or after construction. If variations appear, <br /> I we should be immediately notified so that further evaluation and supplemental recommendations can be <br /> provided. <br /> I This report was prepared for the planned type of development of the site as discussed herein. It is not <br /> valid for third party entities or alternate types of development on the site without the express written <br /> consent of SSGC. If development plans change we should be notified to review those changes and modify <br /> Iour recommendations as necessai-y <br /> The scope of services for this project does not include any environmental or biological assessment of the <br /> Isite including identification or prevention of pollutants, hazardous materials, or conditions, i er studies <br /> should be completed if the owner is concerned about the potential for contamination or pollution. <br /> IWe appreciate the opportunity to work with you on this project. Please contact us if additional <br /> information is required or we can be of further assistance. <br /> IRespectfully, <br /> I South Sound Geotechnical Consulting , ectik 4Cte,„ <br /> (..49,e- ;11 N,11::•48.,-, IA.c ril v.,3 4 <br /> I . <br /> / .t,44,c,43s4s$9,1 . -/,.2 <br /> ITimothy H. Roberts, P.E., R.G. • <br /> Member/Geotechnical Engineer <br /> IAttachments: Figure 1 - Exploration Plan <br /> Appendix A-Field Exploration Procedures and Test Pit Logs <br /> I Appendix B-Laboratory Testing and Results <br /> Unified Soil Classification System <br /> I 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.