My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD Geotech Report 2022-10-25
>
Address Records
>
HARDESON RD
>
7500
>
Geotech Report
>
7500 HARDESON RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:10:00 PM
Creation date
5/9/2022 3:09:48 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E - Geotechnical Report <br /> pp p <br /> South Sound Geotechnical Consulting <br /> September 18,2018 <br /> ' Mr. Sang Ji <br /> clo AHBL <br /> 2215 North.30th Street, Suite 200 <br /> Tacoma,Washington 98403-3350 <br /> Subject: Geotechnical Engineering Report <br /> New 7-11 Store <br /> 7500 Hardeson Road <br /> Everett,Washington <br /> SSGC Project Number: 18072 <br /> Mr.Ji, <br /> South Sound Geotechnical Consulting (SSGC) has completed a geotechnical assessment for the planned <br /> retail development in Everett, Washington. Our services have been completed in general conformance <br /> with our proposal P18078 (dated August 28, 2018) and authorized per signature of our agreement for <br /> services. Our scope of services included completion of five test pits and one infiltration test on the <br /> property, laboratory testing,engineering analyses,and preparation of this report. <br /> PROJECT INFORMATION <br /> ' The project property encompasses approximately 1.32 acres and is southeast of the intersection of <br /> Hardeson Road and 75th Street SW in Everett. It is currently undeveloped. Previous fill materials have <br /> been placed on the site. <br /> New retail development is planned and includes an approximate 6,000 square foot building in the <br /> southwestern portion of the site, with a fuel dispensing area and parking in the northern and eastern <br /> portions. Access to the development will be from Hardeson Road and 75th Street SW. We anticipate <br /> conventional spread footing foundations will be used for support of the building, with concrete slab-on- <br /> 111 grade floors. Conventional asphalt pavements are expected. Infiltration facilities are proposed to support <br /> stormwater control, if feasible <br /> SITE CONDITIONS <br /> ' Fill has been historically placed on the site and forms the existing topography. In general,the central and <br /> northern portions are on the order of 20 feet(+/-) higher than street grade of Hardeson Road. Fill slopes <br /> along the western, northern and northeastern areas of the site are relatively steep. Lesser fill thickness is <br /> apparent in the southeastern portion along the access road to the neighboring storm pond to the east, and <br /> in the southern portion. Vegetation on the site was grass,weeds, scotch broom and berry vines at the time <br /> of our field evaluation. <br /> P.O.Box 39500,Lakewood,WA 98496 253 973-05.15 <br /> ( 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.