Laserfiche WebLink
4/25/2022 Page 1 <br /> City of Everett <br /> 9:07:24AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1701-034 Site Address 1804 HEWITT AVE <br /> Applied 1/26/2017 Applicant ENGELSON DOUG Lot <br /> Approved 1/27/2017 Owner NEW HEWITT/HODGES ASSOC LLC Block <br /> Issued 1/31/2017 Contractor EMPYRE CONSTRUCTION Tract <br /> Parent Permit No. B1606-075 Description FOUNDATION ONLY FOR ELEVATOR SHAFT-HODGES <br /> Notes NOT FOR OCCUPANCY <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 5/31/2017 5/31/2017 StructSlab DWF PartialApproval VOIDED(CRB #4 rebar-slab for elevator pit <br /> 4/28/2021) 18"x18"placement-as per plans <br /> OK for concete <br /> Note:Need a copy of concrete 3000 PSI at <br /> building final <br /> 7/13/2017 7/13/2017 ShearNailing DWF PartialApproval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) Approved as per shear schedule <br /> 1/2"CDX-6"E,12"F <br /> OK to cover roof sheating. <br /> 7/14/2017 7/14/2017 Framing TMB PartialApproval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) North and south elevator walls OK to install <br /> GWB on inside. <br /> 8/9/2017 8/9/2017 DrywallNailing DWF PartialApproval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) Elevator shaft-fire protection <br /> 1 layer as per plans <br /> 5/8"type X drywall- <br /> Installed interior of shaft from floor 1st to <br /> 4th floor <br /> Note:existing lath and plaster on backwall <br /> and side wall of shaft <br /> OK to cover(mud/tape) <br /> 1st-4th floor only <br /> 8/29/2017 8/29/2017 InsulBldg DWF PartialApproval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) R-15-Walls <br /> R-30 Roof,Ceiling <br /> Subject to approval on change of plans: <br /> Wall R-21 <br /> Ceiling R-49 <br /> 8/31/2017 8/31/2017 InsulBldg DWF Approval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) <br /> 9/1/2017 9/1/2017 ShearNailing DWF Approval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) <br /> 9/6/2017 9/6/2017 DrywallNailing DWF PartialApproval VOIDED(KLCA See B1606-032 <br /> 8/14/2018) Drywall Nailing <br /> Elevator Shaft <br /> Roof(Pop-up)interior <br /> And 5th floor 5/8"type X installed <br /> Ok to cover(fire-tape) <br /> 12/15/2017 12/15/2017 BLDG DRYWALL DWF PARTIALAPPR VOIDED(KLCA See B1606-032 <br /> NAILING 8/14/2018) Elevator fronts floors 1-5 <br /> 1"core board installed. <br /> Need to verify fire rated cauling LCI? <br /> 12/18/2017 12/18/2017 BLDG DRYWALL DWF APPROVAL VOIDED(KLCA See B1606-032 <br /> NAILING 8/14/2018) <br /> 4/8/2020 4/8/2020 PERMIT KLC APPROVAL Due to COVID-19 <br /> EXTENSION <br /> 10/7/2020 10/7/2020 PERMIT KLC APPROVAL COVID <br /> EXTENSION EXTENSION <br /> 3/22/2021 3/22/2021 PERMIT KLC EXTENSIONA COVID <br /> EXTENSION EXTENSION <br /> 4/28/2021 4/28/2021 BLDG 16-FINAL BDGI APPROVAL OK TO FINAL PER (4/28/2021 9:19 AM CRB) <br /> STEVE B PERMIT SHOULD OF BEEN FINALLED <br /> BACK WHEN DAVE FOSTER WAS <br /> STILL HERE <br /> INSP12 <br /> SYSTEMS <br />